Laserfiche WebLink
S J C O G, Inc- <br /> `.5 i Lsnt Weber Avenue � Sbekbn.Ct195202 � (209)231.0600 a PNC(209)235-0438 <br /> Son Jartquirr.County Multi-Species HnGi ort CmrservnHon b Open Space Ptan(S/MSCP) <br /> t� 3JMSCP RESPONSE TO LOCAL JURISDICTION(RTLJ) <br /> ADVISORY AGENCY NOTICE TO SJCOG,Inc. <br /> To: Aliso Goulart,Sen Joaquin County,Community Devebpment Depar[meM <br /> From: Laurel Boyd, SJCOG, Inc. Phone: (20g)235-0574 Email: boyd@sjcog.org <br /> Data: November I, 2022 <br /> -Local Jurisdiction Project Title: PA-2000048(SA) <br /> Assessor Parcel Numbar(s): 00'1-200-64 <br /> Local JurisdlMion Project Number: PA-2000048(SA) <br /> Total Aeras to be converted from Opan Spaces Usa: Unknown <br /> Habitat Types to ba Disturbed: Urban Habitat Land <br /> Species Impact Findings: Findings to ba determined by 3JMSCP biologist. <br /> Dear Ms. Goulart: <br /> SJCOG, Inc. has reviewed the project referral for PA-2000048(SA). This projecF consists of a Sita Approval application to <br /> establish a combination gas station to include a convenience store and afast-food restaurant(Use Types: Gasoline— <br /> Combination). The project includes construction of a 4,'100-squarafoot afofa/restaurant building and a 3,230-square-foot <br /> canopy for 6 gas tlispansars.Tha store and fast-food restaurant will operate 7 days a weak,from 6:00 a.m. to '1'1:00 p.m. <br /> Tha gas dispensers will operate 24 hours a day,with cradiS card use only after hours.Tha site will utilize a private on-site <br /> septic system.Water and storm water drainage will ba provided by San Joaquin County Service Area 12. Tha pfojact will <br /> have ingress/agrees driveways off of both N.TM1ornton Roatl and W. Thornton Road with an additional exit only driveway <br /> on W. Thornton Road. The project site is on the northeast corner of Thornton Rd. antl Walnut Grove Rd..Thornton. <br /> (APN/Address: 00'1-200-84/26440 N.Thornton Rd., Thornton). <br /> San Joaquin County is a signatory to San Joaquin County Multi-Species Habitat Conservation and Open Spaces Plan <br /> (3JMSCP). Participation in the 3JMSCP satisfies fequiremants of both the state antl federal endangered species acts, <br /> and ensures that the imparts era mitigated below a level of significance in compliance witM1 the California Environmental <br /> Quality Act (CEQA). The LOCAL JURISDICTION retains responsibility for ensuring that the appropriate Incidental Take <br /> Minimization Measure are properly Implamen[ed and monitored antl that appropriate fees are paid in compliance with [he <br /> 3JMSCP. Although participation in the 3JMSCP is voluntary, Local Jurisdiction/Leatl Agencies should ba aware that if <br /> project applicants choose against participating in the 3JMSCP, [hey will ba required[o provide alternative mitigation in an <br /> amount antl kind equal to that provided in the SJMSCP. <br /> Th/s Protect/s subJact to the SJMSCP. This can ba up to a 30 day process and i[ is recommended that the project <br /> applicant contact SJMSCP staff as early as possible. It is also recommandatl that the project applicant obtain an <br /> information package. httn'/nvvv::=_+cna.om <br /> Please contact SJMSCP staff regarding completing the following steps to satisfy SJMSCP requirements: <br /> • Schedule a SJMSCP Biologist to perform epr�-construction aurvay pr/or to any ground d/sturbance <br /> • SJMSCP Incidental take Minimization Measures and mitigation requirement: <br /> 1. Incitlantal Take Minimization Measures(ITMMs)will be issued b the project mrd mus[be signetl by the project epPlicnnt prior to any <br /> mround disturbance but no lebr then six(6)months From receipt ofthe ITMMs. If ITMMa are not signed within siz months,the applicam <br /> enpplY for SJMSCP Coverage_ UPon receipt ofaignatl ITMMa livor pmjeo[applicant,SJCOG,Inc.ata fFwill sign the tTMMs. TFis <br /> s the atF vtive dote of[he ITMMs, <br /> 2. Under no circumstance shall ground disbrbance occur without compliance and svtisfuction ofthe+TMMs_ <br /> 3. Uporr is nee of fially executed 1"rMMs and prior to any ground disturbance.the project applicant must <br /> a. Post a bond Por paymont ofthe vpPlicable SJMSCP fie covering the entirety ofthe projoct vereage being covered(the bond <br /> should be valid for nes longer than a G month periotl):or <br /> b. Pay[rye apPrapriem gJMSCP fee for the entirety o![he project acrevge being covemd:or <br /> c. �edicvte Ivnd in-lieu of fxs,either ae conservation easemante or fee title-or <br />