My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013833
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AHERN
>
29700
>
2600 - Land Use Program
>
PA-1600049
>
SU0013833
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 8:33:36 AM
Creation date
12/21/2020 4:16:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013833
PE
2627
FACILITY_NAME
PA-1600049
STREET_NUMBER
29700
Direction
S
STREET_NAME
AHERN
STREET_TYPE
RD
City
TRACY
Zip
95304-
APN
25502014
ENTERED_DATE
12/21/2020 12:00:00 AM
SITE_LOCATION
29700 S AHERN RD
RECEIVED_DATE
8/31/2022 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 . Priorto construction, all- weather fire apparatus access roads shall be installed. Fire apparatus access <br /> roads during construction shall have a minimum 20 ' unobstructed width in accordance with CFC <br /> 503 . <br /> 5 . All hydrants shall be installed, inspected and tested prior to bringing combustible materials onsite , <br /> including storage . <br /> 6 . Knox boxes shall be required . The operator of the building shall immediately notify the Fire <br /> Authority and provide the new key where a lock is changed or rekeyed . The key to such shall be <br /> secured in the key box . <br /> 7 . Buildings shall be provided with approved address identification in accordance with CFC § 505 . <br /> 8 . Prior to final inspection, emergency radio responder coverage shall be tested to confirm coverage <br /> areas . It is beneficial for the applicant to conduct testing at foundation as retrofitting for the conduit <br /> is costly . If coverage is inadequate , a separate permit for emergency radio responder coverage shall <br /> be submitted to S SJCFA for review and approval prior to installation . <br /> a . Additional improvements may warrant additional testing to be performed . Testing shall be <br /> the determination of the fire code official . <br /> 9 . Additional comments may occur upon submittal of construction documents . <br /> Feel free to contact our offices , should you have any questions . <br /> Thank you, <br /> Courtney Wood <br /> Fire Plans Examiner <br /> (209 ) 831 - 6707 main line <br /> courtney . wood (dsj cfire . ori <br /> cc : ra fire . plancheeksjcfire . or F permit file <br /> - End - <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.