Laserfiche WebLink
District CEA Reference No : 20180096 Page 4 of 6 <br /> More information on toxic emission factors , priontizations and HRAs can be <br /> obtained by : <br /> E-flailing inquiries to : hramodelervalleyair . org ; or <br /> The District can be contacted at ( 559 ) 230 -6000 for assistance : or <br /> Visiting the Districts website ( Modeling Guidance ) at <br /> http : //www . valleyalr . org /busind /pto /Tox Resources /AirQualityMonitor ng . htm <br /> e ) Ambient ,fir Quality Analysis : An ambient air quality analysis (AAQA) uses air <br /> dispersion modeling to determine if erriissions increases from a project will cause <br /> or contribute to a violation of the ambient air quality standards . The District <br /> recommends that an AAAA be performed for the Project if emissions exceed 100 <br /> pounds per day of any pollutant . <br /> If an AAAA is performed , the analysis should include emissions from both Project <br /> specific permitted and non permitted equipment and activities , The District <br /> recommends consultation with District staff to determine the appropriate model <br /> and input data to use in the analysis . Specific information for assessing <br /> significance , including screening tools and modeling guidance is available online <br /> at the District' s website www . valleyair , org/cepa . <br /> 2 ) In addition to the discussions on potential impacts identified above , the District <br /> recommends the EIR also include the following discussions : <br /> a ) A discussion of the methodology , model assumptions , inputs and results used in <br /> characterizing the Project' s impact on air quality . To comply with CEQA <br /> requirements for full disclosure , the District recommends that the modeling outputs <br /> be provided as appendices to the EIP . The District further recommends that the <br /> District be provided with an electronic copy of all input and output files for all <br /> modeling . <br /> b ) A discussion of the components and phases of the Project and the associated <br /> emission projections , including ongoing emissions from each previous phase . <br /> c ) A discussion of Project design elements and mitigation measures , including <br /> characterization of the effectiveness of each mitigation measure incorporated into <br /> the Project . <br /> A discussion of whether the Project would result in a cumulatively considerable net <br /> increase of any criteria pollutant or precursor for which the San Joaquin Valley Air <br /> Basin is in non- attainment . More information on the district' s attainment status <br />