My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013833
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AHERN
>
29700
>
2600 - Land Use Program
>
PA-1600049
>
SU0013833
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 8:33:36 AM
Creation date
12/21/2020 4:16:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013833
PE
2627
FACILITY_NAME
PA-1600049
STREET_NUMBER
29700
Direction
S
STREET_NAME
AHERN
STREET_TYPE
RD
City
TRACY
Zip
95304-
APN
25502014
ENTERED_DATE
12/21/2020 12:00:00 AM
SITE_LOCATION
29700 S AHERN RD
RECEIVED_DATE
8/31/2022 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
` u3 <br /> lid <br /> lee e <br /> f � <br /> flee <br /> le <br /> Attachment 1 Gas Pacilltles <br /> There could be gas transmission pipelines in this area which would be considered critical <br /> facilities for PG & E and a high priority subsurface installation under California law . Gare must be <br /> taken to ensure safety and accessibility . So , please ensure that if PG & E approves work near <br /> gas transmission pipelines it is done in adherence with the below stipulations . Additionally , the <br /> following link provides additional information regarding legal requirements under California <br /> excavation laws : http : // L1sanorth81 . sir lvi� content/ uploads / 2017 /05 /CA.- LAS/- English . pdf <br /> 1 . Standby Inspection : A PG & E Gas Transmission Standby Inspector must be present <br /> during any demolition or construction activity that comes within 10 feet of the gas pipeline . This <br /> includes all grading , trenching , substructure depth verifications ( potholes) , asphalt or concrete <br /> demolition /removal , removal of trees , signs , light poles , etc , This inspection can be coordinated <br /> through the Underground Service Alert ( USA) service at 811 . A minimum notice of 48 hours is <br /> required , Ensure the USA markings and notifications are maintained throughout the duration of <br /> your work. <br /> 2 . Access : At any time , PG & E may need to access , excavate , and perform work on the gas <br /> pipeline . Any construction equipment , materials , or spoils may need to be removed upon notice . <br /> Any temporary construction fencing installed within PG & E ' s easement would also need to be <br /> capable of being removed at any time upon notice . Any plans to cut temporary slopes <br /> exceeding a 1 : 4 grade within 10 feet of a gas transmission pipeline need to be approved by <br /> PG & E Pipeline Services in writing PRIOR to performing the work . <br /> 3 . Wheel Loads : To prevent damage to the buried gas pipeline , there are weight limits that <br /> must be enforced whenever any equipment gets within 10 feet of traversing the pipe . <br /> Ensure a list of the axle weights of all equipment being used is available for PG & E ' s Standby <br /> Inspector . To confirm the depth of cover , the pipeline may need to be potholed by hand in a few <br /> areas . <br /> Due to the complex variability of tracked equipment , vibratory compaction equipment , and <br /> cranes , PG & E must evaluate those items on a case-by- case basis prior to use over the gas <br /> pipeline ( provide a list of any proposed equipment of this type noting model numbers and <br /> specific attachments) . <br /> No equipment may be set up over the gas pipeline while operating , Ensure crane outriggers are <br /> at least 10 feet from the centerline of the gas pipeline . Transport trucks must not be parked over <br /> the gas pipeline while being loaded or unloaded . <br /> 4 . Grading : PG & E requires a minimum of 36 inches of cover over gas pipelines ( or existing <br /> grade if less) and a maximum of 7 feet of cover at all locations . The graded surface cannot <br /> exceed a cross slope of 1 : 4 . <br /> 5 . Excavating : Any digging within 2 feet of a gas pipeline must be dug by hand . Note that <br /> while the minimum clearance is only 12 inches , any excavation work within 24 inches of the <br /> edge of a pipeline must be done with hand tools . So to avoid having to dig a trench entirely with <br /> hand tools , the edge of the trench must be over 24 inches away . ( Doing the math for a 24 inch <br /> wide trench being dug along a 36 inch pipeline , the centerline of the trench would need to be at <br /> least 54 inches [24/2 + 24 + 36/2 = 54 ] away , or be entirely dug by hand . ) <br /> PG &E Gas and Electric Facilities page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.