Laserfiche WebLink
calculated and submitted along with a drainage plan for review and approval , prior to release of <br /> building permit . ( Development Title Section 9 - 1135 ) <br /> i . The Traffic Impact Mitigation Fee shall be required for this application . The fee is due and payable <br /> at the time of building permit application . The fee will be based on the current schedule at the time <br /> of payment . The fee shall be automatically adjusted July 1 of each year by the Engineering <br /> Construction Cost Index as published by the Engineering News Record . ( Resolutions R - 00 - 433 ) <br /> J . The Regional Transportation Impact Fee shall be required for this application . The fee is due and <br /> payable at the time of building permit application . The fee will be based on the current schedule at <br /> the time of payment . ( Resolution R - 06 - 38 ) <br /> k . A copy of the Final Site Plan shall be submitted prior to release of building permit . <br /> I . Permit Registration Documents ( PRD ' s ) shall be filed with the State Water Resources Control <br /> Board ( SWRCB ) to comply with the State " General Permit for Storm Water Discharges Associated <br /> with Construction Activity " . The Waste Discharge Identification ( WDID ) Number issued by SWRCB <br /> shall be submitted to the Department of Public Works for the file . Contact SWRCB at ( 916 ) 341 - <br /> 5537 for further information . Coverage under the SWRCB General Construction Permit Order 2009 - <br /> 0009 - DWQ shall be maintained throughout the duration of all phases of the project . <br /> 3 . ENVIRONMENTAL HEALTH DEPARTMENT ( Contact : [209 ] 468 - 3420 ) <br /> a . A soil suitability and nitrate loading study addendum incorporating proposed staff and customer <br /> use shall be submitted to the Environmental Health Department ( EHD ) , indicating that the area is <br /> suitable for septic system usage . The studies must be approved by the EHD prior to issuance of <br /> building permit ( s ) . ( San Joaquin County Development Title , Section 9 - 1105 . 2 [ d ] ) . The fee will be <br /> based on the current schedule at the time of payment . <br /> The sewage disposal system shall comply with the onsite wastewater treatment systems standards <br /> of San Joaquin County prior to approval . A percolation test conducted in accordance with the E . P . A . <br /> Design Manual - Onsite Wastewater and Disposal Systems is required for each parcel . The fee will <br /> be based on the current schedule at the time of payment . <br /> b . Applicant shall contact Robert McClellon , Program Coordinator , Small Public Water System <br /> Program , at ( 209 ) 468 - 0332 , to determine if the existing well can be permitted as a public water <br /> system prior to issuance of building permits . If a public water system is required , applicant shall <br /> submit a Small Public Water System preliminary technical report to the California State Water <br /> Resources Control Board , Division of Drinking Water ( Water Board ) at least six months before <br /> initiating construction of any water related improvement , as defined . The issuance of a permit to <br /> operate a small public water system by the local primacy agency ( EHD ) is prohibited without the <br /> concurrence of the Water Board . Please contact Brian Kidwell , P . E . with the SWRCB Division of <br /> Drinking Water at ( 209 ) 948 - 3963 concerning the requirements for preliminary technical report <br /> submittal prior to issuance of building permits . <br /> If the Water Board determines that an onsite well shall be used as the potable water source , a <br /> permit application to operate Small Public Water System shall be submitted to the EHD for approval <br /> prior to issuance of building permits . To issue a permit to operate , concurrence from the Water <br /> Board is required . A yearly permit to operate a public water system will be required by the EHD <br /> prior to sign off of the certificate of final occupancy ( San Joaquin County Development Title , Section <br /> 9 - 1120 . 2 and 9 - 1115 . 9 . ) . <br /> The supplier must possess adequate financial , managerial , and technical capability to assure <br /> delivery of pure , wholesome , and potable drinking water in accordance with San Joaquin County <br /> Development Title , Sections 9 - 1120 . 2 and 9 - 1115 . 9 and C . C . R . , Title 22 , and Health and Safety <br /> Code , Section 116525 116570 . <br /> PA- 1600049 — Conditions of Approval 5 <br />