Laserfiche WebLink
---_-_-------- -------_------------------------------ --------------------_-__----_---- --------------- <br /> an mil <br /> E: <br /> ---------------- ------------------------------- ------ <br /> SICK <br /> REV. PER SJC-,.,EHD <br /> ........... <br /> )YO BALL. VALVE (VAPOR LINE ONLY) & 04/11/2012 ER <br /> "'---'\ SUMP SENSOR (AT LOWEST SLEEVE W/ BRACKET SENSOR <br /> 9 Z, 3/4"0 CONDUIT LOOP <br /> __,,.O <br /> �j�)POINT IN SUMP) 6�BALL DRAIN VALVE (_FYP, SUPPORT (GLUED TO THE SUMP)(. B)SUMFD� SENSOR (AF LOWEST 81 Ag <br /> 3" S_EEVE W/ BRACKET SENSOR POINT OF SUMP) - <br /> 0 THE SUMP) SAFE CIRCUITgym - 3"0 SECONDARY OVER 2"0 <br /> SUPPORT (GLUED J-, ON TANK SUMPS) YOX90' ELBOW ---------C�21 <br /> 1"0 CONDUIT HOME RUN VAPOR LINE 4)� 3"o FLANGE CLAMP 4 PRIMARY FIBERGLASS PIPE AA_ .......... <br /> ),Y4"O CONDUIT __Q�_)TO TLS 350 PRODUCT LINE <br /> YO SECONDARY OVER 2"0 5 <br /> HOME RUN TO06 <br /> PRIMARY FIBERGLASS PIPE TO <br /> YX4" CLAMPSHELL. <br /> _YP <br /> REDUCER (T <br /> EXPLOSION PROOF' TLS 350 42" FIBREL.I*T'E FI-90 GRAY <br /> JUNCTION BOX T COVER -3/4"0 CONDUIT BACK TO VEN T RISER <br /> MULTI---POR TURBINE SENSOR <br /> 2!6�Q-79----------- EXPLOSION PROOF" <br /> "�5) AL <br /> TEM ONE CONDUH 4 JUNCTION BOX <br /> SYS BALL. CHECK <br /> TING <br /> r0 Toa <br /> 'P'E' NE[RATION F-I T �9 <br /> VALVE BALL, CIFIECK VALVE A\ <br /> 4" SYSTEM ONE CONDUIT 4?) <br /> TION FITTING 2"0 FIBERGLASS ...... ------ <br /> X PENEFRA <br /> 25"0 BRINE 89 ------------ Aa <br /> SHROUD BOOT TOP 0/ MALE THRE VACUUM MONITORING <br /> RESERVOIR LOWER CLAMPS ADAPTER SYSTEM TUBING (-TYPICAL) <br /> I O ' ON PROOF MINI HYDROSTATIC SENSOR <br /> 79 <br /> �_92-_) <br /> (9 JUNG I ION BOX 2"0 FLANGE CLAMP <br /> ---------- E­ --------------------- <br /> ...... SAFE CIRCUIT 00 <br /> 2"OX2,3 FLEX (63)----------------- <br /> 'TANK TANK 0 --------- <br /> - -----_------- ------ ------------ <br /> ------ HOSE <br /> . .. .................... 0 <br /> ADAPTER, VAPOR TOP 1,m0 CONDUI F HOME RUN <br /> HYDROSTATIC SENSOF Ll YD R 0 S FA T1 C CAP & TANK GAGE <br /> MINI <br /> SEAL CAP 2 <br /> TER <br /> SENSOR ADAP <br /> -- ---------�t � ­ -_ - ------ T PIPE SUMP <br /> J, -3 4" CONDUI <br /> ---------- ENTRY FITTING <br /> \0 SPEED TURBINE PUMP <br /> zz_= <br /> ADAPTER, FILL TOP SEAL 2" BALL VALVE <br /> PLILD CON TROLLER <br /> -TO VENT- LINE ......... ---------(8 D3 <br /> [RISER SUPPORT C A P <br /> PROBE CAP AND BRACKE r OPW ---------- <br /> INSTALLATION KIT 3"Okl 8" FLEX HOSE(�2)­­­­_.­.l",, <br /> (VAPOR LINE ONLY <br /> 4' PIPE CAP, TANK BELOW 61 <br /> 11 , J­___----, 1. � FLANGE X,3" F-IEX FEMALE NPT <br /> ATG CAP & \_ ��- .- - _/ 11", <br /> ...... 48" DOUBLE WALL. <br /> 64 <br /> _ER KI_ .­ Q <br /> ADAPT r CONTAINMENT Y0 FIBERGLASS MALE THREADED <br /> ENT <br /> 6, ....... <br /> TURBINE SUMP QL36)___ ­­­­------- ADAPTER (VAPOR LINE ONLY) <br /> 48" DOUBLE WALL U) FIBERGLASS ENTRY ------ <br /> rK m 96 BALL VALVE <br /> OR cr <br /> CONTAINMENT FILL tij -1-1-ING (TYP, VAPOR QD--------- VENT AND Of 0 FI <br /> 00 _j " )4"0 SECONDARY OVER Ql�l NOTE. LINE) 2�j V F_ <br /> SUMP R YO O'E' Ry I A <br /> > cr" CL < __COV_ -IN S <br /> TK 2 --- I F 0 k -ASS IPE 17 <br /> DE <br /> �E� <br /> 1EET PRIMARY FIBERGI P <br /> SEE Sl 4"X5" FIBERGLASS FITTING 29 VAPOR LINE M NEI F(F <br /> 8" - I - Q,9) 18" REF. <br /> Q�VEOU I P MEQ{I JSJ CONCENTRIC REDUCER <br /> y p <br /> z 1) <br /> TANKS HYDROS-l'A"TIC MONITORING RESERVOIR I I SUMP PLAN ( UNLEADED AND PREMIUM TA N K <br /> SUMF D PLAN ( UNI.-EAD1. D T-ANK ONLY� <br /> ------------ NO <br /> u ui <br /> N 0 JE. 9-V SEE SHEE-v -FK2---.-1 FOR 0 <br /> SCALE 1 <br /> _LA TY—FTI 7,7T. SCALE 1"=V-0" SC;LE z <br /> ,-"---,SEE SllEET' TK __.l FOF� &)EQUIPMEN -1- LIST z in <br /> m <br /> �X)EOIJIPIVIENT LIST <br /> ------------------- ----------------- —--------------------------------__---------------------------------- CD z <br /> cv <br /> Ld 0 <br /> ADAPTER, VAPOR -TOP m <br /> )TANK PROBE, PIPE CAP, ATG -OR <br /> CAP, & ADAPTER KIT SIPHON CHECK VALVE F <br /> SEAL CAP - NE" :lLEiRZF'lGHT T,_V_A""P"'0RrIG�-" <br /> _E Fl. 1 PER TURBI WATER IT LID WITH G�A�SKE_T� < :D Lj -*z <br /> 42" FIBREL11 -90 GRAY VACUUM <br /> Lh <br /> 18" MAN HOLE OPW ADAPTER, FILL TOP SEAL Lj_j F� x <br /> (20)- 1GFT 42" DIA. RAISED <br /> EXPLOSION 9 B) ------------- ------ 83')PLILD CONTROLLER V) <br /> MULTI--PORT COVER CAP � 2 Ll 7- <br /> _'9)PROOF JUNCTIONcn <br /> CL <br /> 2i) <br /> BOX 19C) VAP0=RIlGHT', MANHOLE COVER TITIAL PROBE SUMP z (83 ci <br /> OF INlERS u� <' <br /> C9 2� (� <br /> NEW 8" THK, CONC. NEW 8" T'11K, CONC, 19F fK\ z CD 0 0,� <br /> SLAB MIN. SEE MULFI PORT WATER SHROUD SLAB MIN, SEE < z ?=' <br /> 1YDROSTATIC SENSOR cr 16 0 0 <br /> NEW 8" THK, GOING. <br /> SLAB MIN. SEE 1(2__�z �) --(8A�l <br /> _YPICAL <br /> PLAN PLAN SYSTEM W/ BOOT AND CLAMPS PLAN --------PROVIDF' 'I" CROWN (I CL LU (�Lj <br /> ALL TANK SUMPS) z>_� C'4 <br /> ....... QW X�l E R T I G I'iT:&:VAPOR` T IGH T, K_ < <br /> 0 <br /> 4 4 ------- <br /> --------- --------------------------------------------- ----j ­._ <br /> ---------- <br /> I jj <br /> 4�. 1 4: A -D <br /> xsx <br /> A 4 44 z 0 <br /> A. 44 C.) <br /> 4 ............ <br /> 4 z U <br /> .4 4 44� 4 A z <br /> 4 A <br /> Z If)0 uj <br /> A <br /> —-------- z CD>- Z <br /> —---------- ------- <br /> A <br /> 4 < -I.: <br /> VARIABLE SPEED <br /> '_�)FIBRELITE FIBERGLASS SKIRT 0- o4 0 D_ <br /> NEW THICKEN <br /> -Aij (SK12) BONDED 'TO FL90 FRAME NEW THICKEN ---------- ------ TURBINE PUMP <br /> SLAB @ BOXES 1-0 SLAB @ BOXES TO <br /> ,-<]l G) __C�DEXPLOSION PROOF <br /> NEW THICKEN 12" MAXIMUM (TYP.) INTERSTITIAL PROBE­SUMP, 12" MAXIMUM (FYP.) JUNCTION BOX <br /> SLAB @ BOXES TO cl� <br /> 2 <br /> HYDROSTAFIC SENSOR <br /> 12" MAXIMUM (Typ.) -Y4"O CONDUIT CONFAINM ------- TO ----------SEAL OFF' REQUIRED PRIOR <br /> HOME RUN TO _�)EXPLOSION PROOF TURBINE <br /> 2" BALL VALVE <br /> 48"X36' Tops (:9. <br /> A TO (E) HAZARDOUS AREA <br /> HYDROSTATIC RISER FL-9 350 I -a JUNCTION BOX Il- I i <br /> ADAP TER, VAPOR <br /> CAP SWIVEL., BRONZE BALL CHECK oe <br /> VACUUM SENSING SYSTEM <br /> ­­-SEAL OFF' REQUIRED PRIOR SECONDARY CONTAINMENT <br /> TO (E) HAZARDOUS AREA VALVE <br /> VAPOR 4" NIPPLE, C9 <br /> 1Q"Z <br /> (A;0-�_- r v, <br /> Q <br /> 7" LENGTH )1"0 CONDUIT HOME RUN <br /> YO SECONDARY OVER 20 0 CONDUIT PIPE SUMP <br /> FY FITTING <br /> SEAL OFF REQUIRED Tl IREADED RISER }�TICC)NDUIT <br /> -E ENTPRIMARY FIBERGLASS PIP . ......... .......... -1-1--1.1- — ;PRIOR -TO (Emo c �u,7TADAPERGDTO VENT RISER Y,"O CONDUIT LOOPYBACK 10 <br /> OR WHITE PVC <br /> ----4 2 1 0 -TURBINE HOME RON TsFOti F , <br /> BRACKET <br /> HAZARDOUS AREA ---_--- <br /> 4" FIBERGLASS TURBINE SENSOR C,y,,5,?A!12) <br /> RISER <br /> 2"0 FIBERGLASS MALE <br /> 4" GA, IRON SYSTEM ONE CONDUIT ------ <br /> __ b C2'4)YO SECONDARY OVER 2"0 <br /> NETRATION FITTING THREADED ADAPTER <br /> PIPE RISER <br /> Trii ii i I PRIMARY FIBERGLASS PIPE <br /> 3/4" SYSTEM ONE CONDUIT �89) 11-11' 1 -,-. - <br /> I :ry <br /> t L5)PRODUCT LINE <br /> 48" DOUBLE WALL Al _u- i P ENETRATION FITTING 0 <br /> 25"0 BRINE 2" FLANGE <br /> BALL VALVE <br /> CONTAINMENT- --------- OQ 09 ll_� lll� <br /> TURB �54- - <br /> RESERVOIR 4" GA. IRON PIPE RISER HEX FEMALE NPT 238 C-) <br /> TOP OF MANWAY <br /> Ld ------------ <br /> 4"X4"X2" VAPOR­ ------------- <br /> TR A C TO R 2"OX23" FLEX (,,!3 54 <br /> HYDROSTATIC SENSO Z, EX 4" GA, IRON PIPE RISER <br /> F -1 TI N G 4� TOP OF TANK HOSE <br /> I W/ <br /> ------ cr, <br /> PLUGS <br /> SUPPORT' <br /> TANK INSIDE MP SENSOR (AT- -----ClIXlD TANK INSIDE U <br /> -Q7)TANK INSIDE <br /> (D <br /> W <br /> MAG SU BRACKET <br /> T POINT IN SUMP) <br /> LOWES 61 2'0 90 DEGREE ELBOW <br /> BALL DRAIN VALVE (TYP. ON <br /> ---------------_- > <br /> -----_---- 6 ), VAPOR LINE EXTRACTOR M <br /> 17 Q-1-1, TANK SUMPS) BEHIND FUEL LEVEL BALL DRAIN VALVE (TYP. 00 <br /> FUEL LEVEL FUEL LEVEL CROSS FITTING P6 ON TANK SUMPS) BEHIND <br /> 20,000 GAL. 'TANK C�d <br /> '12 000 GAL. PREMIUM -TANK) SUMP SENSOR (AT I-OWES" <br /> 12,000 GAL, PRIEMIUM < c\j <br /> SET @ 98% TANK D TANK) <br /> UNLEADED -TANK) 20,000 GA UNLEADED 20,000 GAL CAPACITY 0 POINT OF SUMP) <br /> Q) <br /> /2 0 <br /> ACTIVE SHUT---OFF @ 98% < <br /> 0 �r <br /> FLAPPER VALVE TO BE MAX, TANK CAPACITY TURBINE n <br /> GASOLINE FLOAT INSTALLED @ 95% TANK (OPTIONAL) Y <br /> co V) C) <br /> oo < CA- <br /> CAPACI FY j, D <br /> (20,000 GALLON NOI ALL PRODUCT, VAPOR & f co Ld ( <br /> C6 I'RIES MUST BE T -,- , c\j Lj_ <br /> VENT EN 0- 1.0 Ld <br /> -ANK T- UNLEADED U.G. CLOS TOGETHER AS MUCH rX-0 x <br /> TYPICAL. 20,000 UNLEADED --- INI YPICAL 20,000 12,000 STORAGETANK) E 0 ch� <br /> 20,000 CALLON (12,000--8,000 PROBES W/ GALLON UNLEADED --- PREMIUM AS POSSIBLE FOR V) 0 W, n o <br /> FLOAT KI T <br /> o cy _j <br /> SPLIT) PREMIUM AND DIESEL U,G, STORAGE TANK) MONITORING PURPOSES, 6' N <br /> _j <br /> U.G. STORAGE TANK 41 V) <br /> TANK ALUM, DROP -----------------____-—------- Q) C <br /> WATER FLOAT' 0 fx V) <br /> TUBE FOR 6'-6" -RAPPER NOTE: Y4"O VACUUM MONITORING Lli <br /> TURBINE I <br /> (f) <br /> STEEL PLATES UNDER SCREEN o < rf- cr <br /> TUBING SHOULD BE EXTEND <br /> TANK BURIAL) <br /> a) P- 2 c: 0 0 <br /> -TANK LONG ENOUGH FOR TESTING F_._ 6; Q _C Er- 0 <br /> EACH OPENING BY PURPOSES AND NOT BEING < - V) LL 0- < <br /> MANUFACTURING STEEL, PLATES UNDER ------- <br /> ------------ <br /> ED BY ANY OF <br /> EACH OPENING BY TANK OBS TRUC I <br /> MANUFACTURING [HE COMPONENTS, <br /> .2 <br /> ----------—-------------- ------ <br /> DRAWN <br /> ER <br /> -—---------- <br /> 0 6"HECKED <br /> 0 o 12" MINIMUM <br /> 12" MINIMUM 12" MINIMUM <br /> SAND OR PEA ------- ----------------------- <br /> ---------------- <br /> SAND OR PEA SAND OR PEA <br /> GRAVEL, GRAVEL. NOTE: GRAVEL N 0 TE: <br /> ---------- ------- -------------- —------- )SEE SHEEl- TK2----1 FOI-_� ............ <br /> SHEET TK2- 1 FOF %HT. TITLE <br /> EQUIPMENT LIST FILL & TURBINE SUMP DETAIL <br /> DEQUIPIVIENT LIST <br /> (UNLEADED TANK #17) <br /> MBER <br /> N 0_I­E TANKS I--IYDR0Sl_A1_IC MONITORING RESERVOIR _TU _N <br /> ..........___­ ............. SUMP SEC-TION AND UNL PREMIUM __FANK _FYP . ) RBINE S-UMP SE-C".TION ( (,JN1__EADED J"ANK ONLY).- <br /> TK2---- I FOF ........ s-H <br /> S E E S[--I E E_r F ECTI N_ _( l­YPc­Af_� _­____ SCALE D SCALE 1"=V-0" <br /> .-olp B <br /> !VEQUIPIVIEN I LIST s 0 SCALE 1"=l'­­0" <br /> __--------------—-__ ------------ ---------------------------------- ------------- ------- ----7 <br /> ---------- 4 <br /> 89 <br /> 201000 (3?A[._I_.ON UNLEADED U , (,',, Sl_'0RAC_')E+', TANK PLAN AND SECHON DEI--A I I__S 2 <br /> --__----- <br /> ............ . <br /> ....... ............... - <br />