Laserfiche WebLink
1 2 el 3 4 018 9 10 <br /> SUMMARY OF PROPOSED WORK: CONSTRUCTION NOTES: CONTACT INFORMATION: <br /> 1. INSTALLANEW300XD-DWAADJACENTTOWEl1S PROJECT MANAGER - MICHAEL BRADANINI (925)328-5691 <br /> MCDONAIDI4/150LI MCDONALD ISIANO OUTSIDE OF GENERAL REQUIREMENTS: ESTIMATOR/DESIGNER - CHRIS RODRIGUEZ (9251807-9078 <br /> THE ALLA40V-30 LINE. CORROSION ENGINEER - RYANWOOD (9251285-7838 <br /> 2. MOUNTEDANO EJU CFIEMOUNTEORECTIFIER ANO POLE 1. UNDERGR IND SM22726 ALERT: ll.TIE-IN FOLLOWING <br /> WOR PROCEDURES: BE PREPARED AND PERFORMED IN ACCORDANCE WITH LOCALCORROSION - MARCOSOCEGUERA (510)621-9204 <br /> MOUNTEDANODE JUNCTION BOX(AIB). CALL811(1-800-22]-2600)AMINIMUM OF BUSINESS DAYS(NOT INCLUDING INITIAL DAY OF THE FOLLOWING WORK PROCEDURES: SUPERVISOR <br /> 3. INSTALL 2-NEW CU GROUND RODS PER GS&50-11.1. CONTACT)IN ADVANCE FOR THE MARKING OF UNDERGROUND UTILITIES,INCLUDING ALL - <br /> 4. INSTALL2-NEWK6 CATHODE LEAD5T0057A-MISASCLOSE NON-UTILITIES BEFORE YOU DIG,GRADE,OR EXCAVATE, A.T041DOP-01,HOT AND COLD WORK METHODS FOR NATURAL GAS TRANSMISSION PIPELINE LOCAL CORROSION BILL BElASKI (20R)406-7844 <br /> E TO THE MCDONALD 14/15 FENCE LINE AS POSSIBLE SHUTDOWN ANDTIE-IN. E <br /> WITHOUT GOING WITHIN THE FENCE LINE.RUN THE(2%186 2. UTILITY NOTES: S.TO-44415.GAS CLEARANCE PROCEDURES FOR FACILITIES OPERATING OVER 60 PSIG. <br /> CATHODE LEADS TO THE POLE MOUNTE D RECTIFIER, A.DIMENSIONS SHOWN ON THESE DRAWINGS ARE BASED ON THE BEST AVAILABLE INFORMATION <br /> 5. INSTALLA NEW POLE MOUNTEDWATCHDOGSCOUTRMU. FROM SEVERAL SOURCES,AND SHALL BE VERIFIED IN THE FIELD BY CONSTRUCTION PERSONNEL 12. COATING REMOVAL <br /> 6. NOWORKTO BE COMPLETEDINSIDE STATION FENCING. PRIOR TO FABRICATION. <br /> 7. TWOELECTRICSERVICE POLES WILL BE REQUIRED TO GET B.THE INFORMATION SHOWN ON THESE DRAWINGS CONCERNING TYPE AND LOCATION OF A.PER FORM THE FOLLOWING STEPS,IN ACCORDANCE WITH 104711P-01,BEFORE REMOVING <br /> THE AC SERVICE FROM EXISTING SAP POLE ID 102057023.ALL UNDERGROUND UTIUTIES,PROPERTY LINES,AND OTHER SUBSTRUCTURES IS NOT GUARANTEED ASPHALTIC PIPE WRAP ON PIPELINES INSTALLED PRIOR 701972(BASED ON PG&E ANALYSIS, <br /> POLE MOUNTED EQUIPMENT WILL BE PLACED ON TO BE ACCURATE OR ALL-INCLUSIVE,UNLESS OTHERWISENOTED.CONSTRUCTION PERSONNEL PIPE INSTALLED IN 19720R LATER DOES NOT HAVE PIPE WRAP THAT CONTAINS ASBESTOS): <br /> PROPOSED SECONDARY POLE IDENTI FIED ADJACENT TO ARE RESPONSIBLE FOR MAKING ALL DETERMINATIONS AS TO THE TYPE AND LOCATION OF <br /> STATION FENCE.ALL POLE MOUNTED EQUIPMENT WILL BE UNDERGROUND UTILITIES AND OTH OR SUBSTRUCTURES AS NECESSARY TO AVOID DAMAGE OR 1.WH EN A PIPE WRAP SAMPLE IS REQUIRED TO BE ANALYZED FOR ASSEST05: <br /> PLACED ON PROPOSEDSECONDARY POLE IDENTIFIED ENCROACHMENTS. a.COLLECT SAMPLE PER TD-4711P-01 AND COMPLETE CHAIN OF CUSTODY FORM <br /> ADJACENT TO THE MCDONALD 14/15 FENCE LINE. C.PROSPECTING IS REQUIRED AHEAD OF WORK.ALLOFFSETSNEEDTOBE TD-4711P-01-FOl. <br /> APPROVED BY THE PG&E PROJECT ENGINEER(PED),AND REDLINED DETAILS SHOWN ON PROFILE b.FILE PINKCOPY OF THE CHAIN OF CUSTODY FORM AND FINAL LABORATORY RESULTS <br /> e. ELECTRIC NOTIFICATION 318454]42 WAS CREATED FOR THE ANDCONSTRUCTION DETAIL SHEETS Of EACH ADDITIONAL SUBSTRUCTURE. WITH THE AS-GUILTS. <br /> NEW AC SERVICEOTIFIATION 1/454742ND SECONDARY WAS. D.ALLEXCAVATIONS WITHIN EXISTING STATIONS SHALL BE NAND DUG OR EXCAVATED USING SOFT REFERENCE DRAWINGS: <br /> DIG METHODS(e.g.VACUUM EXCAVATIONS OR SIMILAR). 2.WHEN REMOVING PIPE WRAP THAT CONTAINS ASBESTOS,OR FOR EMERGENCY WORK, <br /> FOLLOW TD4711P-01"PIPE WRAP REMOVAL,HANDLING AND DISPOSAL". OPERATING MAPS <br /> 3. ELBOWS AND FIELD BENDS: -- 385172REV22 <br /> A.ALL BENDS ARE ELBOWS,EXCEPT WHERE SMOOTH FIELD BENDS ARE SHOWN,FIELD BENDS CATHODICPRO7ECTION NOTES: OPERATING DIAGRAMS <br /> SHALL BE MAGE IN ACCORDANCE WITH A-36,SECTION 4D.FIELD BENDS MAY BE USED IN LIEU - N/A <br /> OF ELBOWSWHEN PREAPPROVED BY THE PG&E PROJECT ENGINEER(PED). 1. FOLLOW TD-5100P-01 TO DOCUMENT INTERNAL CORROSION AND EXTERNAL CORROSION AS-BUILTS <br /> B.INORDERTOAVOID EXCESSIVE STRAIN ON THE PIPELINE,THERE SHALL BEA MINIMUM INSPECTION51 OP-01THE TO <br /> - N/A <br /> p SEPARATION OF 5 FEET BETWEEN A ROPED SECTION OF PIPELINE AND ANY ELBOWS OR FIELD D <br /> BENDS. 2. INSTALL ELECTROLYSIS TEST STATIONS IN ACCORDANCE WITH GAS DESIGN STANDARDS <br /> C ALLD CGUES ONDITIONS. <br /> IN THE PIAN AND PROFILE ARE APPROXIMATE ANDSHALL BECUT TOSUIT 0-10.0-10.1 AND 0-10.2. <br /> FIELD CONDITIONS. <br /> 4. SEPARATION FROM OTHER STRUCTURES: 3. UPON COMPLETION OF BORINGS,CONTACT THE CORROSION SUPERVISOR FOR THE LOCAL <br /> A.OROSSING UNDERGROUND FACILITIES:PG&E PIPELINE MUST BE INSTALLED WITH AT LEAST AREA/DIVISIONTO PERFORM CURRENT DRAIN TESTS ON THE PIPELINE SEGMENT THAT <br /> 24 INCHES OFCLEARANCE FROM ANY OTHER SUBSTRUCTURE/UTILITY NOT ASSOCIATED WITH WWELDING <br /> I INSTALLEONEITHE BORE. <br /> SIDE THE <br /> CURRENT <br /> OF THE DRAIN TEST MUST BE PERFORMED PRIOR TO IMPACTED RECORD DRAWINGS: <br /> THE PIPELINE UNLESS NOTED ON THE DRAWINGS. <br /> SEQUENCE OF OPERATIONS: 8.PARALLELING UNDERGROUND FACILITIES:THIS PIPELINE MUST BE INSTALLED WITH AT LEAST 4. FOR THE INSTALLATION OFTHE WATCHDOG RECTIFIER REMOTE MONITOR,CONTACT THE N/A <br /> 5 FEET OF CLEARANCE FROM ANY OTHER UNDERGROUND STRUCTURE/UTILITY NOT ASSOCIATED <br /> 1. IN MCDONALD <br /> 14/15N MCDOADIACELAND OUTSIDE <br /> WITH THE PI PEUN E UNLESS NOTED ON THE DRAWINGS. CORROSION SUPERVISOR FOR THE LOCALAREA/DIVISION. <br /> ESTATION <br /> 14/15 ON MCDONALD ISLAND OUTSIDE OF <br /> THE STATION FENCE UNE. 5. BONDING CABLES TO BE INSTALLED ACROSS PIPELINECUi-0L1T$AT ALL LOCATIONS THE <br /> 5. RESTORATION AN OF PUBLIC <br /> STREETS,LEAN UP; PIPELINE p SEVERED PRIOR TO REMOVAL.CHAIN CLAMPS,MAGNETIC CLAMPS,OR OTHER <br /> 2. INSTALLA 40V-30A CTION BOX(AJ RECTIFIER AND POLE A.RESTORATION WI PUBLIC CITY,COUNTY,OR AG ETC.ABOVEPIPERDS BEDDING SHALL BE IN CONSTRUCTION MANAGEMENT APPROVED CLAMPS AND#6(MIN)STRANDED CABLE SHALL <br /> MOUNTED ANODE JUNCTION ROD{AIB). ACCORDANCE HERE THE LATEST CITY,COUNTY,OR AGENCY STANDARDS. REUTILIZED.CLAMPS TO REMAIN IN PLACE UNTIL PIPELINE IS TIED IN. <br /> 3. INSTALL 2-NEW#6 CATHODE <br /> LEADS TO 057A-MIS AS B.WHERE EVEON SITEEREAREfl COMPLETION L SHALL <br /> BE HE MOVTOPSOIL <br /> TOAD EPTH OFRE AND <br /> 4. INSTALL 2-MCDONALD <br /> CATHODE LEA D5 TO 057A-MIS AS CLOSE TAKESTOREDCARE SITE.UPON COMPLETIONPS CONSTRUCTION,THE TOPSOIL SHALL BE RESTORED. RETIREM ENT PROCEDURE FOR EXISTING PIPE: <br /> TO WITHOUT <br /> TGOING WITHI15 THE <br /> CEEAS INE.RU(BLE TAKE CARE TO PREVENT MIXING OF TOPSOIL AND SUBSOIL. <br /> WRHODE GOD TO THE <br /> POLE MOUNTEDREC THE RECTIFIER. <br /> (2X)#6 1. GT&D UTILITY WORK PROCEDURE TO 9500P-16,'DEACTIVATION AND/OR RETIREMENT OF <br /> CATHODE NEWP LE M POLE MOUNTED RECTIFIER. 6. DESIGN NOTES: UNDERGROUND GAS FACILITIES,"SHALL BE FOLLOWED. <br /> 5. INSTALL NEW OLE MOUNTED WATCHDOGSCOUTFENCING. <br /> G. A.THIS ACCURACY <br /> INISSD PENDAS ENT CREATUPON D BYHES URGEEVI OCU ENT USLTDON THE EFRECORDS, <br /> 6. TWO ELECTRIC <br /> TO BE SERVICE <br /> POLES WILL STATIOIRENCI NG. BMW NGS.IS DEPENDENT UPON THE SOURCE DOCUMENT LISTED ON THE REFERENCE 2. THE EXISTING PIPE SECTIONS SHALL HAVE FREE LIQUIDS REMOVED AND BE 100%PURGED <br /> n ]. TWOEAC SEVICFROMEPOTING SL POU <br /> 102057 GET DRAWINGS. PER GAS DESIGN STANDARD A-38,"PROCEDURES FOR PURGING GAS FACILITIES." <br /> C THEAC SERVICE FROM EXISTING SAP POLE 10102057023.ALL B.PIPE&FIT TING SEPROCE UREFOITHEASTERISK I')RESOLUTION <br /> CONSERVATIVEASSUMEDVALUES C <br /> POLEMOUNTED EQUIPMENT WILL BEPLACEDON PER WORK DP-0TED IN HIS DRAWING RESOLUTION OF UNKNOWN PIPELINE FEATURES(PRUPF). 3. THE PIPE SHALL BE SECTIONALIZED AT INTERVALS AS SPECIFIED IN THE RETIREMENT PLAN. <br /> PROPOSED SECONDARY POLE IDENTIFIED ADJACENT TO [-ALL WORK DEPICTED IN THIS DRAWING ISTD BE AS-BUILT UNDER THE PRIMARY ORDER NUMBER. THE LOCATIONS CALLED OUT ARE APPROXIMATE AND ARE SUBJECT TO FIELD VERIFICATION TO <br /> STATION FENCE,ALL POLE MOUNTED EQUIPMENT WILL BE ]. WELDING REQUIREMENTS: IDENTIFY HE MOST OPTIMUM LOCATION IN THAT VICINITY.ACCURATE SURVEY DATA MAY <br /> PLACEDADJACENT <br /> T PROPOSED SECOMCDONALD <br /> Y P/15 FENCE <br /> A.ALL ARC WELDING IS TO BE PERFORMED IN ACCORDANCE WITH THE GAS WELDING CONTROL NOT BE AVAILABLE FOR THESE LOCATIONS SO USE CAUTION DURING EXCAVATION AND WHEN <br /> Ap1ACENT TO THE MCDONALD 14/15 FENCE LINE. MANUALTD4160M.REFER TO TD4160P-200R TD4160P-26 FOR GENERAL WELDING REQUIREMENTS. IDENTIFYING THE PIPELINE TO BE RETIRED.OTHER ACTIVE PIPELINES MAY BE IN THE AREA. <br /> 8. ELECTRIC NOTIFICATION 118454742 WASCREATED FOR THE B.PERFORM ALL IN-SERVICE WELDING PER UTILITY PROCEDURE TD-4160P40. 4. AT EACH SUCH LOCATION NOTED ABOVE,A PIECE Of PIPE AT LEAST 24-LONG SHALL BE <br /> NEW AC SERVICE AND SECONDARY POLES. C ALLCAN5 OR SPOOLS SHALL BEA MINIMUM LENGTH OF ONE PIPE DIAMETER,WHENEVER POSSIBLE. REMOVED.INSTALL A("HIGH PRESSURE SAVE-A-VALVE JH-17491,M022287J TO CHECK FOR <br /> D.WHEN INTERNAL MISALIGNM ENT AT GI RTHWELDS EXCEEDS 0.094-.BACON WHERE THERE IS PRODUCT AND PRESSURE PRIOR TO CUTTING INTO THE PIPELINE.THE OPEN ENDS OF THE <br /> ACCESS TO THE INSIDE OF THE WELD.WHERE THERE IS NO ACCESS TO THE INSIDE OF THE WELD, RETIRED PIPE SHALL BE SEALED BY THE MOST APPROPRIATE METHOD OUTLINED IN GT&D <br /> MACHINE BORING OR GRINDING IS REQUIRED.BACKWELDING,GRINDING,OR BORING MUST BE UTILITY WORK PROCEDURE TD-9500P-16.BACKFILL MUST BE THOROUGHLY COMPACTED IN <br /> DONE IN ACCORDANCE WITH MA160P-200R TD4160-26.AS APPROPRIATE. PLACE OF THE REMOVED SECTION OF PIPE. <br /> 8, STRENGTH TEST REQUI REM ENTS DESIGN CHANGE PROCEDURE <br /> A.STRENGTH TESTING SHALL MEET PRESSURE AND DURATION REQUIREMENTS OF GAS STANDARD <br /> A-34 AND SHALL BE CONDUCTED IN ACCORDANCE WITH UTILITY PROCEDURE TD4137S. MAINTENANCE AND CONSTRUCTION PERSONNEL MUST OBTAIN APPROVAL FROM THE PROJECT <br /> e.ALL WELDS THAT AVE NOT BEEN STRENGTH TESTED AND ALL FFTINGS SHALL BE SOAP TESTED AT ENGINEER(PED)BEFORE MAKI NO ANY DESIGN CHANGE TO GAS FACIUTI ES PER TD4014P-06. <br /> 100 PSI AND AT OPERATING PRESSURE BEFORE COATING CAN OCCUR. <br /> 9. COATING REQUIREMENTS: <br /> B <br /> A.ALL EXPOSED PIPE AND FITTINGS ARE TO BE COATED IN ACCORDANCE WITH GAS STANDARD B <br /> E-30.ALL COATING ON BURIED PIPE AND FITTINGS ARE TO BE APPLIED IN ACCORDANCE WITH <br /> GAS STANDARD E-35. <br /> 8.FOR COATING SELECTIONS ON BURIED PIPE,SEE DIRECT BURIAL COATING SELECTIONS TABLE. <br /> C CONTACT THE PROJECT ENGINEER(PED)TO REQUEST VARIANCE FROM THE <br /> APPROVED COATING PRODUCTS. <br /> 10. WNOF EXISTING PIPELINE: <br /> A.WHENEVER <br /> A.WHENEVER EXISTING BURIED GAS FACILITIES ARE EXCAVATED DURING ENGINEERING OR DURING <br /> CONSTRUCTION,FOLLOW TD-51OM-01 TO DOCUMENT PIPE INSPECTION.THIS APPLIES TO EXISTING <br /> AND TO BE RETIRED FACILITIES. J <br /> B.EXISTING GIRTH WELDS.AT TIE-IN LOCATIONS,SHALL BE IDENTIFIED AND REMOVED If PRACTICAL. GAS TRANSMISSION <br /> ESTIMATING&DESIGN <br /> C PRIOR TO TIE-IN,INSPECT COATING AND PIPE FOR DEFERS.IF DEFERS ARE FOUND, j <br /> CONTACT PROJECT ENGINEER(PED)FOR GUIDANCE. <br /> Q A5 <br /> WARNING: PIPELINE-CONSTRUCTION NOTES -sEETT <br /> TMI„ o�T�pTMDEEP WELL ANODE <br /> ; L-OS]A-MIS MP 0.00 P C 1550 <br /> ESOLE <br /> cT <br /> ® INSTALL a�pMpA,lc=.A`O STOCKTON,SAN JOAQUIN COUNTY <br /> CaI <br /> PX e <br /> mvoYivs Know wbnfK K01911L c. uwEo wxEmissxucnox cuTxN.smuswmaarTwwmory xEOxo. z a 7 Ens <br /> 05 A6Entt Ib810IB YOD 819. SAN FRANCISCO,CALIFORNIA PACIFIC GAS AND ELECTRIC COMPANY <br /> o 74031229 w0 <br /> uEY REVISIONS <br /> 0l <br /> 1 2 d 3 4 5 6 7 8 9 10 P 'xa <br />