<br /> SUMMARY OF PROPOSED WORK: CONSTRUCTION NOTES: CONTACT INFORMATION:
<br /> 1. INSTALLANEW300XD-DWAADJACENTTOWEl1S PROJECT MANAGER - MICHAEL BRADANINI (925)328-5691
<br /> MCDONAIDI4/150LI MCDONALD ISIANO OUTSIDE OF GENERAL REQUIREMENTS: ESTIMATOR/DESIGNER - CHRIS RODRIGUEZ (9251807-9078
<br /> THE ALLA40V-30 LINE. CORROSION ENGINEER - RYANWOOD (9251285-7838
<br /> 2. MOUNTEDANO EJU CFIEMOUNTEORECTIFIER ANO POLE 1. UNDERGR IND SM22726 ALERT: ll.TIE-IN FOLLOWING
<br /> WOR PROCEDURES: BE PREPARED AND PERFORMED IN ACCORDANCE WITH LOCALCORROSION - MARCOSOCEGUERA (510)621-9204
<br /> MOUNTEDANODE JUNCTION BOX(AIB). CALL811(1-800-22]-2600)AMINIMUM OF BUSINESS DAYS(NOT INCLUDING INITIAL DAY OF THE FOLLOWING WORK PROCEDURES: SUPERVISOR
<br /> 3. INSTALL 2-NEW CU GROUND RODS PER GS&50-11.1. CONTACT)IN ADVANCE FOR THE MARKING OF UNDERGROUND UTILITIES,INCLUDING ALL -
<br /> 4. INSTALL2-NEWK6 CATHODE LEAD5T0057A-MISASCLOSE NON-UTILITIES BEFORE YOU DIG,GRADE,OR EXCAVATE, A.T041DOP-01,HOT AND COLD WORK METHODS FOR NATURAL GAS TRANSMISSION PIPELINE LOCAL CORROSION BILL BElASKI (20R)406-7844
<br /> E TO THE MCDONALD 14/15 FENCE LINE AS POSSIBLE SHUTDOWN ANDTIE-IN. E
<br /> WITHOUT GOING WITHIN THE FENCE LINE.RUN THE(2%186 2. UTILITY NOTES: S.TO-44415.GAS CLEARANCE PROCEDURES FOR FACILITIES OPERATING OVER 60 PSIG.
<br /> CATHODE LEADS TO THE POLE MOUNTE D RECTIFIER, A.DIMENSIONS SHOWN ON THESE DRAWINGS ARE BASED ON THE BEST AVAILABLE INFORMATION
<br /> 5. INSTALLA NEW POLE MOUNTEDWATCHDOGSCOUTRMU. FROM SEVERAL SOURCES,AND SHALL BE VERIFIED IN THE FIELD BY CONSTRUCTION PERSONNEL 12. COATING REMOVAL
<br /> 6. NOWORKTO BE COMPLETEDINSIDE STATION FENCING. PRIOR TO FABRICATION.
<br /> 7. TWOELECTRICSERVICE POLES WILL BE REQUIRED TO GET B.THE INFORMATION SHOWN ON THESE DRAWINGS CONCERNING TYPE AND LOCATION OF A.PER FORM THE FOLLOWING STEPS,IN ACCORDANCE WITH 104711P-01,BEFORE REMOVING
<br /> THE AC SERVICE FROM EXISTING SAP POLE ID 102057023.ALL UNDERGROUND UTIUTIES,PROPERTY LINES,AND OTHER SUBSTRUCTURES IS NOT GUARANTEED ASPHALTIC PIPE WRAP ON PIPELINES INSTALLED PRIOR 701972(BASED ON PG&E ANALYSIS,
<br /> POLE MOUNTED EQUIPMENT WILL BE PLACED ON TO BE ACCURATE OR ALL-INCLUSIVE,UNLESS OTHERWISENOTED.CONSTRUCTION PERSONNEL PIPE INSTALLED IN 19720R LATER DOES NOT HAVE PIPE WRAP THAT CONTAINS ASBESTOS):
<br /> PROPOSED SECONDARY POLE IDENTI FIED ADJACENT TO ARE RESPONSIBLE FOR MAKING ALL DETERMINATIONS AS TO THE TYPE AND LOCATION OF
<br /> STATION FENCE.ALL POLE MOUNTED EQUIPMENT WILL BE UNDERGROUND UTILITIES AND OTH OR SUBSTRUCTURES AS NECESSARY TO AVOID DAMAGE OR 1.WH EN A PIPE WRAP SAMPLE IS REQUIRED TO BE ANALYZED FOR ASSEST05:
<br /> PLACED ON PROPOSEDSECONDARY POLE IDENTIFIED ENCROACHMENTS. a.COLLECT SAMPLE PER TD-4711P-01 AND COMPLETE CHAIN OF CUSTODY FORM
<br /> ADJACENT TO THE MCDONALD 14/15 FENCE LINE. C.PROSPECTING IS REQUIRED AHEAD OF WORK.ALLOFFSETSNEEDTOBE TD-4711P-01-FOl.
<br /> APPROVED BY THE PG&E PROJECT ENGINEER(PED),AND REDLINED DETAILS SHOWN ON PROFILE b.FILE PINKCOPY OF THE CHAIN OF CUSTODY FORM AND FINAL LABORATORY RESULTS
<br /> e. ELECTRIC NOTIFICATION 318454]42 WAS CREATED FOR THE ANDCONSTRUCTION DETAIL SHEETS Of EACH ADDITIONAL SUBSTRUCTURE. WITH THE AS-GUILTS.
<br /> NEW AC SERVICEOTIFIATION 1/454742ND SECONDARY WAS. D.ALLEXCAVATIONS WITHIN EXISTING STATIONS SHALL BE NAND DUG OR EXCAVATED USING SOFT REFERENCE DRAWINGS:
<br /> DIG METHODS(e.g.VACUUM EXCAVATIONS OR SIMILAR). 2.WHEN REMOVING PIPE WRAP THAT CONTAINS ASBESTOS,OR FOR EMERGENCY WORK,
<br /> FOLLOW TD4711P-01"PIPE WRAP REMOVAL,HANDLING AND DISPOSAL". OPERATING MAPS
<br /> 3. ELBOWS AND FIELD BENDS: -- 385172REV22
<br /> A.ALL BENDS ARE ELBOWS,EXCEPT WHERE SMOOTH FIELD BENDS ARE SHOWN,FIELD BENDS CATHODICPRO7ECTION NOTES: OPERATING DIAGRAMS
<br /> SHALL BE MAGE IN ACCORDANCE WITH A-36,SECTION 4D.FIELD BENDS MAY BE USED IN LIEU - N/A
<br /> OF ELBOWSWHEN PREAPPROVED BY THE PG&E PROJECT ENGINEER(PED). 1. FOLLOW TD-5100P-01 TO DOCUMENT INTERNAL CORROSION AND EXTERNAL CORROSION AS-BUILTS
<br /> B.INORDERTOAVOID EXCESSIVE STRAIN ON THE PIPELINE,THERE SHALL BEA MINIMUM INSPECTION51 OP-01THE TO
<br /> - N/A
<br /> p SEPARATION OF 5 FEET BETWEEN A ROPED SECTION OF PIPELINE AND ANY ELBOWS OR FIELD D
<br /> BENDS. 2. INSTALL ELECTROLYSIS TEST STATIONS IN ACCORDANCE WITH GAS DESIGN STANDARDS
<br /> C ALLD CGUES ONDITIONS.
<br /> IN THE PIAN AND PROFILE ARE APPROXIMATE ANDSHALL BECUT TOSUIT 0-10.0-10.1 AND 0-10.2.
<br /> FIELD CONDITIONS.
<br /> 4. SEPARATION FROM OTHER STRUCTURES: 3. UPON COMPLETION OF BORINGS,CONTACT THE CORROSION SUPERVISOR FOR THE LOCAL
<br /> A.OROSSING UNDERGROUND FACILITIES:PG&E PIPELINE MUST BE INSTALLED WITH AT LEAST AREA/DIVISIONTO PERFORM CURRENT DRAIN TESTS ON THE PIPELINE SEGMENT THAT
<br /> 24 INCHES OFCLEARANCE FROM ANY OTHER SUBSTRUCTURE/UTILITY NOT ASSOCIATED WITH WWELDING
<br /> I INSTALLEONEITHE BORE.
<br /> SIDE THE
<br /> CURRENT
<br /> OF THE DRAIN TEST MUST BE PERFORMED PRIOR TO IMPACTED RECORD DRAWINGS:
<br /> THE PIPELINE UNLESS NOTED ON THE DRAWINGS.
<br /> SEQUENCE OF OPERATIONS: 8.PARALLELING UNDERGROUND FACILITIES:THIS PIPELINE MUST BE INSTALLED WITH AT LEAST 4. FOR THE INSTALLATION OFTHE WATCHDOG RECTIFIER REMOTE MONITOR,CONTACT THE N/A
<br /> 5 FEET OF CLEARANCE FROM ANY OTHER UNDERGROUND STRUCTURE/UTILITY NOT ASSOCIATED
<br /> 1. IN MCDONALD
<br /> 14/15N MCDOADIACELAND OUTSIDE
<br /> WITH THE PI PEUN E UNLESS NOTED ON THE DRAWINGS. CORROSION SUPERVISOR FOR THE LOCALAREA/DIVISION.
<br /> ESTATION
<br /> 14/15 ON MCDONALD ISLAND OUTSIDE OF
<br /> THE STATION FENCE UNE. 5. BONDING CABLES TO BE INSTALLED ACROSS PIPELINECUi-0L1T$AT ALL LOCATIONS THE
<br /> 5. RESTORATION AN OF PUBLIC
<br /> STREETS,LEAN UP; PIPELINE p SEVERED PRIOR TO REMOVAL.CHAIN CLAMPS,MAGNETIC CLAMPS,OR OTHER
<br /> 2. INSTALLA 40V-30A CTION BOX(AJ RECTIFIER AND POLE A.RESTORATION WI PUBLIC CITY,COUNTY,OR AG ETC.ABOVEPIPERDS BEDDING SHALL BE IN CONSTRUCTION MANAGEMENT APPROVED CLAMPS AND#6(MIN)STRANDED CABLE SHALL
<br /> MOUNTED ANODE JUNCTION ROD{AIB). ACCORDANCE HERE THE LATEST CITY,COUNTY,OR AGENCY STANDARDS. REUTILIZED.CLAMPS TO REMAIN IN PLACE UNTIL PIPELINE IS TIED IN.
<br /> 3. INSTALL 2-NEW#6 CATHODE
<br /> LEADS TO 057A-MIS AS B.WHERE EVEON SITEEREAREfl COMPLETION L SHALL
<br /> BE HE MOVTOPSOIL
<br /> TOAD EPTH OFRE AND
<br /> 4. INSTALL 2-MCDONALD
<br /> CATHODE LEA D5 TO 057A-MIS AS CLOSE TAKESTOREDCARE SITE.UPON COMPLETIONPS CONSTRUCTION,THE TOPSOIL SHALL BE RESTORED. RETIREM ENT PROCEDURE FOR EXISTING PIPE:
<br /> TO WITHOUT
<br /> TGOING WITHI15 THE
<br /> CEEAS INE.RU(BLE TAKE CARE TO PREVENT MIXING OF TOPSOIL AND SUBSOIL.
<br /> WRHODE GOD TO THE
<br /> POLE MOUNTEDREC THE RECTIFIER.
<br /> (2X)#6 1. GT&D UTILITY WORK PROCEDURE TO 9500P-16,'DEACTIVATION AND/OR RETIREMENT OF
<br /> CATHODE NEWP LE M POLE MOUNTED RECTIFIER. 6. DESIGN NOTES: UNDERGROUND GAS FACILITIES,"SHALL BE FOLLOWED.
<br /> 5. INSTALL NEW OLE MOUNTED WATCHDOGSCOUTFENCING.
<br /> G. A.THIS ACCURACY
<br /> INISSD PENDAS ENT CREATUPON D BYHES URGEEVI OCU ENT USLTDON THE EFRECORDS,
<br /> 6. TWO ELECTRIC
<br /> TO BE SERVICE
<br /> POLES WILL STATIOIRENCI NG. BMW NGS.IS DEPENDENT UPON THE SOURCE DOCUMENT LISTED ON THE REFERENCE 2. THE EXISTING PIPE SECTIONS SHALL HAVE FREE LIQUIDS REMOVED AND BE 100%PURGED
<br /> n ]. TWOEAC SEVICFROMEPOTING SL POU
<br /> 102057 GET DRAWINGS. PER GAS DESIGN STANDARD A-38,"PROCEDURES FOR PURGING GAS FACILITIES."
<br /> C THEAC SERVICE FROM EXISTING SAP POLE 10102057023.ALL B.PIPE&FIT TING SEPROCE UREFOITHEASTERISK I')RESOLUTION
<br /> CONSERVATIVEASSUMEDVALUES C
<br /> POLEMOUNTED EQUIPMENT WILL BEPLACEDON PER WORK DP-0TED IN HIS DRAWING RESOLUTION OF UNKNOWN PIPELINE FEATURES(PRUPF). 3. THE PIPE SHALL BE SECTIONALIZED AT INTERVALS AS SPECIFIED IN THE RETIREMENT PLAN.
<br /> PROPOSED SECONDARY POLE IDENTIFIED ADJACENT TO [-ALL WORK DEPICTED IN THIS DRAWING ISTD BE AS-BUILT UNDER THE PRIMARY ORDER NUMBER. THE LOCATIONS CALLED OUT ARE APPROXIMATE AND ARE SUBJECT TO FIELD VERIFICATION TO
<br /> STATION FENCE,ALL POLE MOUNTED EQUIPMENT WILL BE ]. WELDING REQUIREMENTS: IDENTIFY HE MOST OPTIMUM LOCATION IN THAT VICINITY.ACCURATE SURVEY DATA MAY
<br /> PLACEDADJACENT
<br /> T PROPOSED SECOMCDONALD
<br /> Y P/15 FENCE
<br /> A.ALL ARC WELDING IS TO BE PERFORMED IN ACCORDANCE WITH THE GAS WELDING CONTROL NOT BE AVAILABLE FOR THESE LOCATIONS SO USE CAUTION DURING EXCAVATION AND WHEN
<br /> Ap1ACENT TO THE MCDONALD 14/15 FENCE LINE. MANUALTD4160M.REFER TO TD4160P-200R TD4160P-26 FOR GENERAL WELDING REQUIREMENTS. IDENTIFYING THE PIPELINE TO BE RETIRED.OTHER ACTIVE PIPELINES MAY BE IN THE AREA.
<br /> 8. ELECTRIC NOTIFICATION 118454742 WASCREATED FOR THE B.PERFORM ALL IN-SERVICE WELDING PER UTILITY PROCEDURE TD-4160P40. 4. AT EACH SUCH LOCATION NOTED ABOVE,A PIECE Of PIPE AT LEAST 24-LONG SHALL BE
<br /> NEW AC SERVICE AND SECONDARY POLES. C ALLCAN5 OR SPOOLS SHALL BEA MINIMUM LENGTH OF ONE PIPE DIAMETER,WHENEVER POSSIBLE. REMOVED.INSTALL A("HIGH PRESSURE SAVE-A-VALVE JH-17491,M022287J TO CHECK FOR
<br /> D.WHEN INTERNAL MISALIGNM ENT AT GI RTHWELDS EXCEEDS 0.094-.BACON WHERE THERE IS PRODUCT AND PRESSURE PRIOR TO CUTTING INTO THE PIPELINE.THE OPEN ENDS OF THE
<br /> ACCESS TO THE INSIDE OF THE WELD.WHERE THERE IS NO ACCESS TO THE INSIDE OF THE WELD, RETIRED PIPE SHALL BE SEALED BY THE MOST APPROPRIATE METHOD OUTLINED IN GT&D
<br /> MACHINE BORING OR GRINDING IS REQUIRED.BACKWELDING,GRINDING,OR BORING MUST BE UTILITY WORK PROCEDURE TD-9500P-16.BACKFILL MUST BE THOROUGHLY COMPACTED IN
<br /> DONE IN ACCORDANCE WITH MA160P-200R TD4160-26.AS APPROPRIATE. PLACE OF THE REMOVED SECTION OF PIPE.
<br /> 8, STRENGTH TEST REQUI REM ENTS DESIGN CHANGE PROCEDURE
<br /> A.STRENGTH TESTING SHALL MEET PRESSURE AND DURATION REQUIREMENTS OF GAS STANDARD
<br /> A-34 AND SHALL BE CONDUCTED IN ACCORDANCE WITH UTILITY PROCEDURE TD4137S. MAINTENANCE AND CONSTRUCTION PERSONNEL MUST OBTAIN APPROVAL FROM THE PROJECT
<br /> e.ALL WELDS THAT AVE NOT BEEN STRENGTH TESTED AND ALL FFTINGS SHALL BE SOAP TESTED AT ENGINEER(PED)BEFORE MAKI NO ANY DESIGN CHANGE TO GAS FACIUTI ES PER TD4014P-06.
<br /> 100 PSI AND AT OPERATING PRESSURE BEFORE COATING CAN OCCUR.
<br /> 9. COATING REQUIREMENTS:
<br /> B
<br /> A.ALL EXPOSED PIPE AND FITTINGS ARE TO BE COATED IN ACCORDANCE WITH GAS STANDARD B
<br /> E-30.ALL COATING ON BURIED PIPE AND FITTINGS ARE TO BE APPLIED IN ACCORDANCE WITH
<br /> GAS STANDARD E-35.
<br /> 8.FOR COATING SELECTIONS ON BURIED PIPE,SEE DIRECT BURIAL COATING SELECTIONS TABLE.
<br /> C CONTACT THE PROJECT ENGINEER(PED)TO REQUEST VARIANCE FROM THE
<br /> APPROVED COATING PRODUCTS.
<br /> 10. WNOF EXISTING PIPELINE:
<br /> A.WHENEVER
<br /> A.WHENEVER EXISTING BURIED GAS FACILITIES ARE EXCAVATED DURING ENGINEERING OR DURING
<br /> CONSTRUCTION,FOLLOW TD-51OM-01 TO DOCUMENT PIPE INSPECTION.THIS APPLIES TO EXISTING
<br /> AND TO BE RETIRED FACILITIES. J
<br /> B.EXISTING GIRTH WELDS.AT TIE-IN LOCATIONS,SHALL BE IDENTIFIED AND REMOVED If PRACTICAL. GAS TRANSMISSION
<br /> ESTIMATING&DESIGN
<br /> C PRIOR TO TIE-IN,INSPECT COATING AND PIPE FOR DEFERS.IF DEFERS ARE FOUND, j
<br /> CONTACT PROJECT ENGINEER(PED)FOR GUIDANCE.
<br /> Q A5
<br /> WARNING: PIPELINE-CONSTRUCTION NOTES -sEETT
<br /> TMI„ o�T�pTMDEEP WELL ANODE
<br /> ; L-OS]A-MIS MP 0.00 P C 1550
<br /> ESOLE
<br /> cT
<br /> ® INSTALL a�pMpA,lc=.A`O STOCKTON,SAN JOAQUIN COUNTY
<br /> CaI
<br /> PX e
<br /> mvoYivs Know wbnfK K01911L c. uwEo wxEmissxucnox cuTxN.smuswmaarTwwmory xEOxo. z a 7 Ens
<br /> 05 A6Entt Ib810IB YOD 819. SAN FRANCISCO,CALIFORNIA PACIFIC GAS AND ELECTRIC COMPANY
<br /> o 74031229 w0
<br /> uEY REVISIONS
<br /> 0l