Laserfiche WebLink
(5)the venting pipe shall be constructed with the ability to be connected to an induced draft exhaust system; <br /> (6)automatic methane gas sensors shall be installed within the permeable gas layer,and inside the building to trigger an <br /> audible alarm when methane gas concentrations are detected;and <br /> (7)periodic methane gas monitoring shall be conducted inside all buildings and underground utilities in accordance with <br /> Article 6,of Subchapter 4 of this chapter(section 20920 et seq.). <br /> Therefore, the site investigation must be completed prior to any change in site use takes <br /> place. The footprint of buried waste should be defined and hazards identified so that the <br /> proper mitigation can be employed to protect the Public Health and Safety and the <br /> environment. <br /> I hope this clarifies any questions you may have. Please contact me if needed. <br /> Jenni <br />