My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2013
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
88 (STATE ROUTE 88)
>
17405
>
2300 - Underground Storage Tank Program
>
PR0537996
>
REMOVAL_2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:21:42 AM
Creation date
12/30/2020 11:25:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2013
RECORD_ID
PR0537996
PE
2361
FACILITY_ID
FA0021934
FACILITY_NAME
FRUIT STAND
STREET_NUMBER
17405
Direction
N
STREET_NAME
STATE ROUTE 88
City
LOCKEFORD
Zip
95237
APN
05125042
CURRENT_STATUS
02
SITE_LOCATION
17405 N HWY 88
P_LOCATION
98
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0537996_17405 N HWY 88_.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAMPLING PROTOCOL FOR ROUTINE TANK REMOVALS <br /> The following represents minimum sampling criterion required for closure compliance. Soil samples collected shall be representative of <br /> native soils beneath the tank's invert(tank's bottom)at a collection depth not to exceed 2-4 feet. If contamination is documented <br /> during closure,an Unauthorized Release Notification must be completed and submitted within five(5)working days pursuant to <br /> California Health&Safety Code,Section 25295. <br /> WATER NOT PRESENT IN THE TANK PIT <br /> FTNK TANK SIZE MINIMUM NUMBER LOCATION OF SOIL SAMPLES <br /> 55yf (Gallons) of SOIL SAMPLES <br /> <1,000 1 oer Tank Fill OR Pump End of Tank <br /> 1,000-10,000 2per Tank 1 at each End of Tank <br /> >10,000 3 or More Ends and Middle OR generally <br /> per Tank spaced along the length of the Tank <br /> PIPING AND STOCKPILE <br /> PIPING SOIL SAMPLES 1 Sample eve 20 lineal feet <br /> TANK&PIPING STOCKPILE SAMPLES 2 Samples every 50 cubic yards <br /> To r, To f)Qj LP �' AA <br /> WATER IS PRESENT IN TANK PIT <br /> TANK TANK SIZE MINIMUM NUMBER of LOCATION of SOIL MINIMUM NUMBER of <br /> # (Gallons) SOIL SAMPLES SAMPLES WATER SAMPLES <br /> <10,000 2 from wall next to tank <br /> Single Tank 3 ends at soil/groundwater 1 <br /> Interface&1 below tank <br /> 4 from wall next to tank <br /> >10,000 OR ends at soil/groundwater <br /> Tank Cluster 5 or more interface&1 below each 1 <br /> tank <br /> SLAB PRESENT IN THE TANK PIT <br /> Soil samples shall be obtained beneath the slab within native soils. Penetration through the obstruction will be required in order to <br /> collect the samples. (Physical removal of the obstruction will allow sampling according to the above conditions.) <br /> TANK TANK SIZE MINIMUM NUMBER LOCATION of SOIL SAMPLES <br /> # (Gallons) of SOIL SAMPLES <br /> <1,000 3 per Tank Center and Ends OR Sides of Tank <br /> 1,000-10,000 5 perTank Center and Ends OR Sides of Tank <br /> >10,000 5 OR More per Tank Ends and Middle and generally spaced <br /> along the length of the Tank <br /> Tri-Regional Recommendations <br /> Appendix A <br /> BH 23 046 (Revised 8/1/11) g <br />
The URL can be used to link to this page
Your browser does not support the video tag.