Laserfiche WebLink
STATE OF <br />REQUIRED ACCEPTANCE TESTS <br />4!`V IIA_C IOe..'va:l Mf10 <br />CALiFnaWIA EWER[1 r COMMISSION <br />CERTIFICATE OF COMPLIANCE NRCC-MCH-04-E. <br />Required Acceptance TestsPage 1 of 3 <br />oler[Namer Deli PrePar <br />TAO. LA:ESTRELLA-MANTECA-C45T0 SHOPPING CENTER 10-8-19 <br />AFUE60 <br />A. MECHANICAL COMPLIANCE FORMS& WORKSHEETS <br />les <br />indGrateifwor heetGsiruluded' <br />li <br />For detailed dnsiructions on the use of this and all Energy Standards. compliance documents 'refer to the 2016 Nonresidential Manual <br />Note: The: EnforcementAgencymay require all compliance documents to be incorporated: onto the building plans- The NRCC-MC14-04-E and A1RCC-MC14-05-E.are atimmot ve <br />compliance documents to NRCC- MCN -01-Fr NRC -MCH -02-E and NRCC- CH-O3-:Efor projects using only single lonepackaged HVACsYstems::. <br />YES <br />NO <br />Form Title <br />G <br />C <br />Re I <br />NRCC-MCH-04{ (1 of 2) 'Certificate of Compliance. Required on plans when used, <br />120.1(b). 300/400 <br />300/400. <br />NRCC-MCH-04{ (2 of 2) Mechanical- Acceptance Tests Required on pians. when used: <br />C+ <br />- 120.1(c)5, 120.2(e)3' NA <br />NRCC-MCH-05-E (1 of 2) HVAC Prescriptive Requirements. It is required on plans when used. <br />(,C <br />YES <br />NRCC-MCH-05 E (2 of2-.) Mechanical SWH Euipm ntSumma Summary required for allsubmGttaIswit :service water heat'nBPo fsor spas, s. lt±Is <br />required on plans where applicable. <br />CA Building:. Energy Efficiency Standards- 2016: Nonresidential Compliance January 2016 <br />STATE OF CAUFORNIA <br />REQUIREMENTS FOR PACKAGED SINGLE ZONE UNITS <br />CEGNRCC•MCH-05-E Revised 01118CALIFORNtAENER COMMISSION. <br />CERTIFICATE OF COMPLIANCE NRCC-MCH-05=E <br />I ""' TAt1LAESfRELtA-MANITE..CA-COSTOSHOPINGCENTER I "'¢" A- 10-8-19 I <br />Hwibmant Tadisi' I W I ACA. AC -2 I 1 .... "I <br />Heating Equipment Efficiency° <br />Cooling Equipment Efficieltc)° <br />Thermostats' <br />Furnace Standby Loss Control <br />Low Leakage AHU <br />Ventilation' <br />Demand Control Ventifationa <br />Occupant Sensor Ventilation Controls <br />Shutoff. and Reset Controls <br />Outdoor Air and Exhaust. Damper Control <br />Automatic Demand Shed Controls <br />Economizer FDD <br />Duct insulation <br />PRESCRIPTIVE MEASURES <br />Equipment 1s sized in conformance with <br />140.4 (a& b) <br />Economizer <br />Electric Resistan€e Heating ID <br />11-. r.-..L-.n.,.C..nl.-w.--. T --I-11 <br />. 1161 or 110.2(a) <br />AFUE80 <br />AFUE60 <br />110.1 or 1102(a) SEER 13 <br />SEER 13 <br />110.2(b), 1102(c) 7DAY <br />7DAY' <br />110.2(d) NA <br />NA <br />11D.2(f) NA <br />NA <br />120.1(b). 300/400 <br />300/400. <br />1201(c)4 NA. <br />NA S <br />- 120.1(c)5, 120.2(e)3' NA <br />NA <br />12D.Z(e) YES <br />YES <br />120.2f) YES <br />YES <br />120.2(h). NA. <br />NA <br />120.2(1) YES <br />.YES <br />120.4 R43 <br />R4.3. <br />city/st-W IP: Sacramento, CA <br />pi�nK 916-359-1818 <br />140.4(a & b). <br />140.4(e) <br />140.4(g) <br />FDO for <br />iAf Ah% <br />Energy <br />Notes: <br />1. Provide equipment tags (e.g. ACI orAC1 to 10)• Muhtpieeun/ts of the same make and model wfth thesame, application artd octessodes can be grouped together. <br />2. Enterthe following Information osapprolarlate., Unit Manufacturer; Unit Madellyumber (Incisiallaccessoneq;Descriptionoftheunit(e.g.gas-pack orheatpump;ratedhopringcapacity <br />(enter "NIA"ifnoheating), and, . rutedcoaltngcgponlyfenter"NiA"ffno: coding). For unit capacities include the units feg. katuh or tons). <br />3. For each requirement, enter the minimum regpdrementfnamtheStandardIn. the left column funder'Samdard Requirement").In the right column (under'As5chedufed"):enter the valuefar <br />the units as specified. <br />4. Where there Is more than one requirement (egg. full and partfood efficiency) enter both with theapproprlate labels (e.g. COP and (EER). <br />5. in the leftcolumn identffy the thermostatic rmqufrements from thestandard (e.g.. programmable setback thermostat or heatpump with electric hem),.. in the dghtcohumn fnddcatethe <br />capabilities ofthethermostatas scheduled. <br />6. if the unit has efamoce which Is rated at2 225,0072tah, of capacity, indicate the rated standby loss and Igtridon source (e.g. lfi*. if therets�nofuraacevr'theun7tLsraredfort225rtt00Htua <br />indicate "NIA". <br />7, in the left cofumn, enter both the required ventilation value from Table 120.1A andfar the number of occupants: times 15 cfm/persdxi_ in the right column enter the actual minfmu h <br />ventilation as scheduled. ffthespace is naturofy ventilated enter"NIA" in the feftcolumn cad "the space is naturally vantilamill hrthertght column.. <br />"4. if the space is required to have either DCV or Occupant Sensor Ventilation Control mcIcute"required"M the left column(otherwise Indicate ."NIA"in the kfiicolumn).Ife(LhNP,OCYar'Occupaat <br />Sensor Ventilation Cantrof is provided indicate ''provided" fn the right column (otherwise Indicate "NIA"in the right column) <br />9. in the feft column indicate the required time controis from the standard. In the right column Identify the device that provides this functionalltyy(e.g. EMCSor programmable timeclack). <br />I0. Fater NIA if there is no electric Beating. If the system has electric heating: Indicate which exception to 140.4(8) applies. <br />Energy Efficiency Standards - <br />STATE OF CALIFORNIA <br />REQUIRED ACCEPTANCE TESTS <br />Designer <br />This w P larce document Is to be used by designer and attached tothePons. Listed below are alithe acceptance testsfor mechanical systems. The designer r is required d W <br />check theapplicable boxes by all acceptance tests that apply and list all equipment that requiresen acceptance test. If all equipment of:a certain type requires a test, list the <br />ui entdescri tion and the r _, - c . <br />eq pm p e numbs of systems. The NA the Section m the Appendix of the Nonresidential Reference Appendices Manual that describes the <br />test. Since this compliance document will be part of the plans;complet(dnof this section will allow the responsible patty to: budget for thescope ofwork appropriately. <br />Enicrcement Agency: <br />ms Acceptance. Syste .pts Before oecupancypermit(sgrantedfpranewlyconstructedbuildingorspace,aranewspace-conditioning systemserYingabuildingorspaceisoperatadfor <br />normal use, all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance. <br />Systems. Acceptance. Before occupancy permit is granted all newly installed HVAC. equipment must be tested using the Acceptance Requirements. The NRCC-MCH-04-E compliance <br />documentisnot considered a completed document and is not be accepted b. requiring testing, <br />p to a p y the building department unless the boxes arechecked. The requ r g g, <br />person performing the test (Example: HVAC installer, TAB contractor,controls contractor, PE. in charge of project). and what. Acceptance test must be conducted. The following <br />checked -off forms are required for ALL new Installed and replaced p a ui equipment. In addition a Certificate of Acceptance compliance documents shall be submitted to the building <br />q h'9 P P. _. P g <br />department that certifiesplans, specifications; installation certificates, and operating and maintenance information meet the requirements of Section 10-103(b) and Title 24 Part 6: <br />The building inspector must receive the properly filled out and signed compliance documents before the building can receive final occupancy, <br />Test DescripPtion <br />MCH -Q-A <br />MCH -03-A <br />MCH -04-A <br />MCH -05-A <br />MCH-06-A,-06-A,MCH-07-A <br />agency for all applicable Inspections. I understand that a completed signed copy of this Certificate of Compliance is requi red to beincluded with the documentation the builder provides to the <br />MCH -11-A <br />MCH -127A <br />MCH -14-A <br />MCH -18-A <br />°are Signed` 10-8.19 <br />Equipment <br />urx„sn 37958 <br />city/st-W IP: Sacramento, CA <br />pi�nK 916-359-1818 <br />Air <br />Demand <br />Automatic <br />FDO for <br />Distributed <br />Energy <br />Requiring Testing <br />#of <br />Outdoor <br />Single Zone <br />Distribution <br />Economizer <br />Control <br />Supply fan <br />Demand <br />Packaged <br />Energy <br />Management <br />Test Performed By: <br />or Verification <br />Units <br />Air <br />Unitary <br />Ducts <br />Controls <br />Ventilation <br />VAV <br />Shed <br />DX Units <br />Storage DX <br />Control <br />(DCV) <br />Control <br />AC Systems <br />System <br />AC 1. <br />1 <br />0. <br />21 <br />El <br />0 <br />❑ <br />0 <br />® <br />1:1 <br />17 <br />1 <br />CONTRACTOR <br />(E)AC-2' <br />1 <br />i21 <br />13 <br />R71 <br />El <br />13 <br />® <br />❑ <br />® <br />[I <br />CONTRACTOR.. <br />EA Building. Energy Efficiency :Standards - 2016 Nonresidential Compliance January 2016 <br />REQUIREMENTS FOR PACKAGED SINGLE ZONE UNITS <br />£EGNR2CG-MCH-a6•E(Rewced 01116) CALIFORNIAENEROYCOMMiSSION <br />CERTIFICATE OF COMPLIANCE NRCC-MCH-05-E <br />I m¢rr"'4 10,&i9 <br />DOCUMENTATION AUTHOR'S DECLARATION STATEMENT <br />L. Icar,a, this Certificate of Compliance documentation isoccurate and compiem <br />Q0a`tahoo1""Naw' BERNAD'CHAN <br />°0wa"`M�01Ate1pr're'" BERNARD CHAN <br />cacany. SUN CONSTRUCTION AND ENGINEERING <br />'01itrie0 10-8-19 <br />Address: <br />2272 ATRISCO CIRCLE <br />teA/.MUG @tdaCMlbnidL4leLCatlIXI laaPgloblei: <br />'"'a'e"p; SACRAMENTO, CA <br />Phony, 916-359-1818 <br />RESPONSIBLE PERSON'S :DECARATION:STATEMENT <br />I certify the following: underpenalty of perium tinder the taws of the State of California: <br />L The information provided on thiscertificateof compliance1s true and correct. <br />2. 1 am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design idemfl ed. on thls Certlficate of Com pilance (responsible <br />designer). <br />3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identlfled. on this Cerdfic ate of Compliance <br />conform to the requirements of Title 24, Parti and Part 6 of the California Code ofRegulations. <br />4. The building design features or system design features Identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, <br />worksheets, calcdations, plans and specifications submitted to the enforcement agency for .approval with this building permit application. <br />5. 1 will ensure that aacom I enforcement <br />completed signed copy of this Certificate of Compliance shall be made the building permit(s) issued for the building, and made available to the en orcement <br />agency for all applicable Inspections. I understand that a completed signed copy of this Certificate of Compliance is requi red to beincluded with the documentation the builder provides to the <br />building owner at occupancy. <br />aespsriameoesignerNamr. BERNARD CHAN. <br />Responsibleaesiglersignawrr, BERNARD CHAN <br />co'nP`n'' SUN CONSTRUCTION AND ENGINEERING <br />°are Signed` 10-8.19 <br />Address' 2272 ATRISCO CIRCLE <br />urx„sn 37958 <br />city/st-W IP: Sacramento, CA <br />pi�nK 916-359-1818 <br />CA Building Energy Efficiency Standards - 2016 Nonresidential Compliance January 2016 <br />OF CALIFORNIA <br />TESTS: <br />10-8-19 <br />CONSTRUCTION AND ENGINEERING <br />ATRISCO CIRCLE <br />NRCC-MCH-04-E <br />Page 3 of 3 <br />1. The information provided on this Certificate of Compliance is true and correct. <br />2. 1 am eligible under Division 3 of this Business and: Professions Code to accept. responsibility forthe building design or system design identified on this Certificate ;of Compliance (responsible <br />designer). <br />3. The energy features and performance specification, materials,components, and manufactured deVicesforthe building design or system design Identiffeddn this Certificate of Compliance <br />conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations <br />C The building design features or system design features identified on this Certificate of Compliance are: consistent withthe information provided on other applicable compliance documents, <br />worksheets, calculations, plans and specifications submitted to the enforcement agency for: approval with this building permit application. <br />S. I will ensure that a completed signed copy of this Certificate, of Compliance shall be made available with the building permitls) issued for the building, and made available to theenforcement <br />agency for all applicable Inspections. I understand that a completed signed copy of this Certificate of Compliance is required to be Included with the documentation the builder providesto the <br />AND ENGINEERING <br />STAMP <br />REVISIONS <br />DESCRIPTION I DATE <br />Date Signed: October 9, 2019 <br />LA +-STRLLA► I <br />- TACOS A REAFOOD � <br />J <br />J <br />LU <br />W <br />J <br />W <br />M <br />0 <br />a <br />SHEET TITLE <br />MECHENMY <br />DO, PSIAM <br />DATE OCTOBER 8, 2019 <br />DRAWN BY EH <br />CHECKED BY BC <br />SCALE: as noted <br />SHEET <br />T24 <br />~I <br />M■A <br />L♦ <br />0) <br />JQ <br />W <br />L) <br />Z <br />Qa <br />00 <br />W <br />00 <br />Fm <br />N <br />Q <br />SHEET TITLE <br />MECHENMY <br />DO, PSIAM <br />DATE OCTOBER 8, 2019 <br />DRAWN BY EH <br />CHECKED BY BC <br />SCALE: as noted <br />SHEET <br />T24 <br />