Laserfiche WebLink
3 <br /> v <br /> c <br /> MECHANICAL SYMBOLS LEGEND MECHANICAL KEYED NOTES z PACKAGED HVAC EQUIPMENT SCHEDULE <br /> o HVAC SYSTEM o o_ <br /> 2 a T THERMOSTAT w SENSIBLE HEATING <br /> TOTAL AIRFLOW O.A. TOTAL TOTAL COOLING SUPPLY FAN ELECTRIC <br /> c O 24 HR, 7 DAY PROGRAMMABLE THERMOSTAT TO BE INSTALLED Z 0 U DESIGNATION MFR. TONNAGE SEER MODEL (CFM) AIRFLOW CAPACITY COOLING CAPACITY / BHP MCA MOCP SERVICE WEIGHT <br /> v ° 1 „ • O � CAPACITY TYPE <br /> 48 ABOVE THE FLOOR. N A <br /> TEMPERATURE SENSOR w 72 MBH <br /> CONSULTANTS / GROUP y m RTU-1,2 CARRIER 3 15.2 48HCDA04 1200 160 35.6 26.3 2-STAGE 1 .7 20 25 208/3/60 650 <br /> 0 v O2 FURNISH AND INSTALL ROOFTOP UNIT (RTU-1,2) ON ROOF. 0 V) / <br /> SD SMOKE DETECTOR ROUTECONDENSATE <br /> ROOF TO PIPING TO INDIRECTLY DRAINST ABOVE MOP SINK' OWHERE DRAWINGSASHOWN ARE FOR OR�PORA a EcoAsIDE ACCOUNT <br /> ONLSERVICES, <br /> sITE ISPECISFIC DESIGN Is00 0 <br /> NOTES: GAS D M D r 0 <br /> REQUIRED BY LOCAL AHJ. REQUIRED BY DUTCH BROS. AS A COURTESY, NCA CONSULTANTS PROVIDES SITE-SPECIFIC U <br /> 0 ,/W� FLEXIBLE DUCT 1 . FURNISH AND INSTALL NEW ROOFTOP UNIT AND NCA PLENUMIZED CURB. TO ORDER CALL TOLL-FREE (877)-530-0078. <br /> DESIGN WITH SITE-SPECIFIC PROFESSIONAL ENGINEER SEAL UNDER AN AGREEMENT BETWEEN <br /> NCA CONSULTANTS AND DUTCH BROS. rn Of 2. PROVIDE UNIT WITH ECONOMIZER WITH FAULT DETECTION & DIAGNOSTICS, BAROMETRIC RELIEF DAMPER, AND MERV 13 FILTERS. <br /> VOLUME DAMPER 3 FLEXIBLE AIR DUCTS SHALL BE TESTED IN ACCORDANCE WITH O <br /> LLL j 3. VERIFY ELECTRICAL REQUIREMENTS WITH ELECTRICAL CONTRACTOR PRIOR TO ORDERING EQUIPMENT. <br /> UL 181. SUCH DUCTS SHALL BE LISTED AND LABELED AS FOR SITE-SPECIFIC DESIGN, ARCHITECTS EMAIL REFLECTED CEILING PLAN, ELEVATIONS, KITCHEN Q o <br /> ° FD FIRE DAMPER o M <br /> a� CLASS 0 OR CLASS 1 FLEXIBLE AIR DUCTS AND SHALL BE PLANS, FLOOR PLAN, AND ROOF STRUCTURAL PLAN TO DESIGN®NCACONSULTANTS.COM <br /> C: INSTALLED IN ACCORDANCE WITH LOCAL MECHANICAL CODE. <br /> XL <br /> vCEILING SUPPLY AIR DIFFUSER TO CONTACT THE DESIGN DEPARTMENT BY PHONE CALL TOLL-FREE (877) 530-0078. z ELECTRIC HEATER SCHEDULE <br /> o PROVIDE WALL-MOUNTED ELECTRIC AIR CURTAIN ABOVE <br /> O4 <br /> _ - DOOR/WINDOW. SEE ARCHITECTURAL DRAWINGS FOR DESIGNATION TYPE MBH KW V/PH MANUFACTURER REMARKS <br /> ° C K-Al- CEILING RETURN AIR GRILLE ADDITIONAL INFORMATION. <br /> UPON COMMENCEMENT OF ROUGH-IN AS SCHEDULED BY NCA CONSULTANTS, THE EH-1,2 ARCHITECTURAL 5.1 1 .5 120/10 'QMARK' SMARTSERIES INTEGRAL <br /> WALL-HD HT1502SS THERMOSTAT <br /> = aSIDEWALL AIR DIFFUSER OR GRILLE OS <br /> 8"0 EXHAUST DUCT OUT THROUGH ROOF. MAINTAIN MINIMUM OF AIR CONDITIONING CONTRACTOR IS TO REMAIN ON THE JOB SITE FULL TIME UNTIL <br /> o E 10 FEET FROM ANY OUTSIDE ARE INTAKES. THE ROUGH-IN IS 100% COMPLETE. THE GENERAL CONTRACTOR'S SITE <br /> L_ 0 NEW DUCTWORK <br /> 6 INSTALL OWNER-PROVIDED WALK-IN COOLER CONDENSING UNIT <br /> O SUPERINTENDENT WILL VERIFY. <br /> ° •� EXISTING DUCTWORK ON ROOF. REFRIGERANT PIPING FROM COOLER TO REMOTE ON 62.1 O.A. CALCULATIONS <br /> - D - CONDENSATE DRAIN CONDENSER ON THE ROOF PROVIDED BY CONTRACTOR PER UPON COMMENCEMENT OF TRIM-OUT AS SCHEDULED BY NCA CONSULTANTS, THE AREA OCCUPANCY CFM/PERSON SUBTOTAL SQUARE FEET CFM/SQFT SUBTOTAL TOTAL CFM PROVIDED BY <br /> a MANUFACTURER'S RECOMMENDATIONS. VERIFY EXACT ROUTING AIR CONDITIONING CONTRACTOR IS TO REMAIN ON THE JOB SITE FULL TIME UNTIL <br /> - G - GAS PIPING AND ROOF PENETRATION LOCATION IN FIELD. THE TRIM-OUT IS 100% COMPLETE. THE GENERAL CONTRACTOR'S SITE <br /> U) U) D PIPE TURNING DOWN SUPERINTENDENT WILL VERIFY. PRODUCTION 9 7.5 67.50 575 0.18 103.5 171.0 RTU-1,2 <br /> oPIPE TURNING UP O7 INSTALL OWNER-PROVIDED ICE MAKER CONDENSING UNIT ON 1 <br /> L L ROOF. REFRIGERANT PIPING FROM ICE MAKER TO REMOTE <br /> GNICH <br /> U) T BALL VALVE CONDENSER ON THE ROOF PROVIDED BY CONTRACTOR PER <br /> GATE VALVE MANUFACTURER'S RECOMMENDATIONS. VERIFY EXACT ROUTING PLENUMIZED CURB INSTALLATION NOTES CITY COMMENTS ARCHITECTURE <br /> AND ROOF PENETRATION LOCATION IN FIELD. AIR BALANCE SCHEDULE S T U D O <br /> 0 a e CONNECTION OF NEW TO EXISTING 1. CAREFULLY LOCATE AND MARK ROOF CURB LOCATIONS SO THAT DUCT WORK CAN BE EXHAUST AIR FLOW <br /> 0 �� CHECK VALVE O8 FURNISH AND INSTALL ELECTRIC WALL HEATER, (EH-1,2). INSTALLED IN THE APPROXIMATE LOCATIONS AS SHOWN BY THE FLOOR PLAN. PAY THE HVAC SYSTEMS SHALL BE PROVIDED WITH MERV 13 EXHAUST UNIT (CFM) PROVIDED BY O.A. FLOW (CFM) <br /> VERIFY EXACT MOUNTING HEIGHT WITH ARCHITECT. ATTENTION TO THE LOCATION OF THE ROOF STRUCTURE IN ORDER TO ACCOMMODATE FILTERS PRIOR TO OCCUPANCY. ALL SYSTEMS HAVE *EF-1 75 RTU-1 100 <br /> a� GAS COCK THE DUCT DROPS. BEEN DESIGN TO PERFORM WITH MERV 13 FILTERS. <br /> � � �}� UNION O CONNECT AIR DEVICE RUN-OUT, SIZED PER AIR DEVICE - - RTU-2 100 <br /> - SCHEDULE THIS SHEET, TO BOTTOM OF PLENUMIZED CURB. 2. MARK THE EXACT LOCATION OF EACH ROOF CURB. LAY OUT ALL EQUIPMENT LOCATIONS TOTAL EXHAUST 75 TOTAL O.A. 200 <br /> 0PRESSURE GAUGE SEE DETAILS ON SHEET M-2.0. ALL DUCTWORK SHALL HAVE IN ORDER TO MAINTAIN PROPER CLEARANCES FROM EXHAUST FANS AND VENTS AS WELL <br /> MINIMUM R-6 INSULATION. AS PROVIDING FOR PROPER SERVICE CLEARANCES. * FAN TO OPERATE ON AN INTERMITTENT BASIS. 1001 SE SANDY BLVD, SUITE 100 <br /> `° 0 STRAINER PORTLAND, OR 97214 <br /> 0 AFF ABOVE FINISHED FLOOR 10 UNDERCUT DOOR 1" FOR MAKEUP AIR. 3. GENERAL CONTRACTOR SHALL CUT ROOF DECKING MATERIAL TAKING CARE TO AVOID V. 503.552.9079 <br /> 0AIR DEVICE # S - SUPPLY CUTTING ANY STRUCTURAL COMPONENTS. GENERAL CONTRACTOR SHALL ALSO INSTALL AIR DEVICE SCHEDULE F. 503.241.7055 <br /> S1 11 PROVIDE 3 0 FLUE AND COMBUSTION PIPING FOR WATER ANY NECESSARY FRAMING OR BLOCKING AT OPENINGS. <br /> -v R - RETURN SYMBOL S1 S2 R1 WWW•GNICHARCH.COM <br /> CFM E - EXHAUST HEATERS THROUGH ROOF WITH CONCENTRIC KIT. TYPICAL FOR <br /> E ° (2) WATER HEATERS. 4. WITH ROOF CURB UPSIDE DOWN (SOLID METAL BOTTOM UP) MEASURE AND MARK THE DUCT SIZE 10"o 6"0 16"0 04.29.2020 <br /> o LOCATION OF ANY JOISTS OR OTHER FRAMING MEMBERS THAT MUST BE AVOIDED. <br /> 0 MEASURE AND MARK THE LOCATION OF ALL THE DUCT TAPS. BOOT SIZE 10"o 6"0 22"x22" �pROFESS/ <br /> FACE SIZE 24"x24" 12"x12" 24"x24" Q- <br /> � � 5. CUT ALL DUCT TAPS INTO THE BOTTOM PANEL OF THE ROOF CURB. BE CAREFUL NOT �CtELt ROy <br /> TO DAMAGE THE ROOFING SURFACE WHILE MAKING THESE CUTS. DESIGN MFG. TITUS TITUS TITUS �j C' ► <br /> 0 MODEL NO TMS TMS 350RL cS 9 <br /> 16 0 6. INSTALL DUCT TAP FITTINGS AND MANUAL DAMPERS INTO THE OPENINGS PREVIOUSLY FINISH WHITE WHITE WHITE AQ�31 <br /> 6 CUT. SEAL ALL CONNECTIONS ON BOTH THE BOTTOM AND THE TOP SIDES OF THE TAPS. �Ir �.6 <br /> ° LEVEL CURB BETWEEN BOTTOM OF CURB AND DECK AIR CURTAIN SCHEDULE c!'yl�. �'/lgN1 <br /> 7. TURN CURB RIGHT SIDE UP, , <br /> a INSTALL IN ROOF OPENING. SECURE CURB TO ROOF FRAMING AS REQUIRED. �FOALI� <br /> 00 DESIGNATION AC-1,2,3 A-4 <br /> 8. GENERAL CONTRACTOR OR ROOFING CONTRACTOR SHALL FLASH AND ROOF IN THE CURB <br /> o � <br /> AS DETAILED ON THE DRAWINGS. LENGTH 36" 48" <br /> a 9. DUCT RUNS SHALL BE INSTALLED FROM THE TAPS TO THE DIFFUSER LOCATIONS AS MANUFACTURER GLOBAL IND. GLOBAL IND. <br /> (D ° SHOWN ON THE PLANS. <br /> MODEL FM-1209-2-246608 FM-1212-2-246609 <br /> 10. WRAP RIGID DUCT WORK AND DUCT TAPS WITH SPECIFIED DUCT INSULATION. SEAL AND <br /> ° a AIR FLOW (CFM) 670/815 670/815 Q <br /> TAPE INSULATION AROUND EACH DUCT TAP AND TO THE BOTTOM OF THE CURB. <br /> O <br /> U <br /> 0 oL. VOLTAGE 120/10 120/10 <br /> E Q m <br /> -v MOTOR (WATTS) 255 320 0 <br /> V) <br /> AMPS 2.1 2.65 <br /> ami o EH 0) <br /> J / / \ (ix <br /> 1 1 8 WEIGHT 28.5 28.5 <br /> J <br /> � Q - \ 0 O PROVIDE FACTORY PROVIDE FACTORY <br /> o <br /> REMOTE CONTROL, <br /> REMOTE CONTROL, O <br /> ACCESSORIES 2-SPEED BLOWER 2-SPEED BLOWER <br /> ° �' / MOTOR, AND FACTORY MOTOR, AND FACTORYco <br /> AC MOUNTING ACCESSORIES MOUNTING ACCESSORIES <br /> >1 IL <br /> O J <br /> C <br /> a �° ® / 3 4 LL J <br /> v m ® o \ VENTILATION FAN SCHEDULE 3 O <br /> s1 Q U <br /> DESIGNATION EF-1 <br /> Z <br /> 0 �co ®® I S1 EF <br /> R10'-0' 350 '�hJ ^ 5 APPLICATION BATHROOM EXHAUST <br /> O I IBL > <br /> RESTROO1 ELEC. MANUFACTURER COOK 0 Q v <br /> 0 O 1 �I ROOM 4- <br /> 0 O <br /> a R U S2 0 LO > M <br /> ° I 50 MODEL GC-148 U O� ELO <br /> v 0 <br /> o \ - / S1 I AIR FLOW (CFM) 75 v) U 00 Q <br /> \ 300 <br /> 10 U O J< I <br /> 0 0 U <br /> ° 3 / RTU I O STATIC PRESSURE 0.4 n 1 m O <br /> 0 eXD <br /> \ • .• (� <br /> C a� 1 MOTOR (HP OR WATTS) 29W > N O� 0 4- <br /> v <br /> v <br /> / \ RTU-1,2 0 � LO m <br /> E <br /> \ \ 1 T WEIGHT 12 ^^L O O 3 <br /> ° v <br /> EXD <br /> MCA O Q <br /> / \ <br /> dR1o / O NOTES: PROVIDE SPEED ISSUED FOR PERMIT: <br /> R1 AC CONTROL SWITCH AND <br /> U) / 1 1100 4 4 CONTROL NOTES MECHANICALLY 02. 4.20 <br /> � I ACTUATED, LOW LEAK <br /> S1 S1 S1 DAMPER <br /> 77) <br /> U U <br /> °' R10'-0' O 30 TYPICAL 300 400 400 <br /> 2: ° 11 TYPICAL 11 <br /> U O I I <br /> 1�' <br /> U) REV: DATE: DESCRIPTION: <br /> v <br /> -° \ 1 04.29.20 CITY COMMENTS <br /> C a- <br /> 0 <br /> 0 / <br /> -0 <br /> ' <br /> ° ACtEo vF" MECHANICAL ROOF PLAN 4 2 $ MECHANICAL PLAN <br /> O <br /> 1 SCALE; 1/4' = V-0' / 1 SCALE: 1/4' = 1'-0' <br /> \ / SHEET NAME: <br /> ° 0 \ <br /> - - - ' MECHANICAL PLAN <br /> o <br /> m <br /> ❑o 701 ❑o <br /> CALSE SHEET NUMBER: <br /> - � <br /> Engineering Inc. <br /> M1 . 0 <br /> 796 Merus Court T 636.349.1600 <br /> oil St.Louis,MO 63026 F 636.349.1730 <br /> 2019 DB Franchising USA, LLC <br />