<br /> NRCC-MCH-E(Created 1/20) CALIFORNIA ENERGY COMMISSION 4W NRCC-MCH-E(Created 1/20) CALIFORNIA ENERGY COMMISSION NRCC-MCH-E(Created 1/20) CALIFORNIA EN ERGY COMMISSION NRCC-MCH-E(Created 1/20) CALIFORNIA ENERGY COMMISSION
<br /> aj O CERTIFICATE OF COMPLIANCE NRCC-MCH-E ICERTIFICATE OF COMPLIANCE NRCC-MCH-E1 CERTIFICATE OF COMPLIANCE NRCC-MCH-E ICERTIFICATE OF COMPLIANCE NRCC-MCH-E
<br /> T is ocument is use to emonstrate comp iance or mechanical systems that are within the scope of the permit application and are demonstrating compliance using the lProject Name: Dutch Bros.Coffee Report Page: Page 2 of 10 Project Name: Dutch Bros.Coffee Report Page: Page 3 of 10 Project Name: Dutch Bros.Coffee Report Page: Page 4 of 10
<br /> + prescriptive path outlined in 140.4 or§141.0(b)2for alterations.
<br /> Project Address: 1105 W.Yosemite Avenue-Manteca,CA95337 Date Prepared: 02/14/2020--1 lProject Address: 1105 W.Yosemite Avenue-Manteca,CA95337 Date Prepared: 02/14/2020 Project Address: 1105 W.Yosemite Avenue-Manteca,CA95337 Date Prepared: 02/14/2020
<br /> 0 0 Project Name: Dutch Bros.Coffee IReport Page: Page 1 of 10
<br /> 0Project Address: 1105 W.Yosemite Avenue-Manteca,CA 95337 Date Prepared: 02/14/2020 D.EXCEPTIONAL CONDITIONS Dry System Equipment Efficiency(other than Package Terminal Air Conditioners(PTAC)and Package Terminal Heat Pumps(PTHP)) J.VENTILATION AND INDOOR AIR QUALITY
<br /> O) N This table is auto filled with uneditable comments because of selections made or data entered in tables throughout theform. 01 02 03 1 04 1 OS 1 06 07 1 08 1 09 Table Instructions:Complete thefollowing Table to demonstrate compliance with mandatory ventilation requirements in 4120.1 and 4120.2U3B for all nonresidential,high-rise
<br /> A.GENERAL INFORMATION
<br /> residential and hotel motel occupancies. For alterations on ventilations stems beta altered within the scope o the ermita application need to be documented in this table.
<br /> O 0 Heating Mode Cooling Mode / P IY Y 9 P f P PP
<br /> 01 Project Location(city) Manteca 04 Total Conditioned Floor Area 630 Please review Table 1 for compliance:all fields which are not grey must be completed;either column 01 must indicate thatventilation calculations are attached to the permit In lieu of this table,the required outdoor ventilation rates and airflows may be shown on the plans or the calculations can be presented in a spreadsheet.
<br /> U Min Efficiency Min Efficiency
<br /> 02 Climate Zone 12 O5 Total Unconditioned Floor Area 0 application or each system must demonstrate that Airflow Air>Required Min.Outside Airflow. Name or Size Category
<br /> -0 0 el Y q Rating Condition Required per Design Required per Design 01 ❑ Check the box ifthe project is showing ventilation calculations on the plans,or attachingthe calculations instead of completing this table. D
<br /> i 03 Occupancy Types Within Project: 06 #of Stories Habitable Above Grade 1 Selections made in Table O have been changed by the permit applicant.See Table E.Additional Remarks for permit applicant's explanation. Item Tag (Btu/h) Efficiency Unit cy Efficiency Unit cy Dn n R
<br /> N p Y Yp 1 ( ) (°F) Tables 110.21 Efficiency Tables 110.2/ Efficiency 02 ❑ Check this box if the project includes new or altered high-rise residential dwelling units. v U
<br /> O C: ❑Office(B) ❑✓ Retail(M) ❑Non-refrigerated Warehouse(S) Title 20 Title 20
<br /> O E.ADDITIONAL REMARKS 03 E] Check the box if the project is using natural ventilation in any spaces to meet required ventilation rates per 120.1 c 2.
<br /> U
<br /> F]E]
<br /> Motel Guest Rooms(R-1) ❑School(F) ❑Healthcare Facility(H) SEER 13 15.2
<br /> This table includes remarks made by the permit applicant to the Authority Having Jurisdiction. RTU-1,2 <65,000 80 -- Nonresidential and Hotel)Motel Ventilation Systems
<br /> N E]High-Rise Residential(R-2/R-3) E]Relocatable Class Bldg(E) F]Other(Write In): 04 05 06 07
<br /> 'FOOTNOTES:Climate zone can be determined on the California Energy Commission's website at htto://www.energy.ca.goy/maps/renewable/building climate zones.html Reset
<br /> Air Filtration per§120.1(c)and 141.0 b 2'
<br /> i System Design OA System Design 0
<br /> System Name: g y g
<br /> O B.PROJECT SCOPE G.PUMPS = _ y CFM Air Flow': Transfer Air CFM:
<br /> E -o F.HVAC SYSTEM SUMMARY(DRY&WET SYSTEMS) � - -
<br /> - C Table Instructions:Include any mechanical systems that are within the scope of the permit application and are demonstrating compliance using the prescriptive path outlined in I This Section Does NotApply
<br /> 140.4 or 141.0 b 2 for alterations. Table Instructions:Complete the following equipment schedules to show compliance with mandatory requirements found in 110.1 and 110.2 a and prescriptive requirements 08 09 10 11 12 13 14 15 16
<br /> found in 140.4a 140.4b and140.4 k or 141.0 b2 for alterations.
<br /> N !n My project consists of(check all that apply) 'FOOTNOTE:Computer room economizers must meet requirements of 140.9 a and will be documented on the NRCC-PRC-E document. Mechanical Ventilation Required per§120.1(c)3s Exh.Vent.per 120.1 c 4
<br /> O Dry System Equipment Sizing(includes air conditioners,condensers,heat pumps,VRF,furnaces and unit heaters)
<br /> 01 02 03 'The unit used for HP must be consistentfor all fans within a system. Space Name or Conditioned #of Required Required DCV or Occupant Sensor Controls per
<br /> _ 01 02 03 04 05 T 06 1 07 1 08 1 09 1 10 1 11 4 #of Provided per Design s
<br /> Air System(s) Wet System Components Dry System Components Item Tag Occupancy Type Floor how filets s s Min OA Minimum §120.1(d}3.§120.i(d)5&§120.2(e)3
<br /> 0 � Equipment Sizing per Mechanical Schedule(Btu/h)§140.4(a&b) � Area(ft') toilets People CFM CFM CFM
<br /> O Heating Air System ❑Water Economizer ❑✓ Air Economizer I.SYSTEM CONTROLS
<br /> Heating Outputx-a Cooling Output',' Load Calculations'a
<br /> Cooling Air System ❑Pumps Electric Resistance Heat Table Instructions:Complete thefollowing Table to demonstrate compliance with mandato controls in 110.2 and 120.2 and prescriptive controls in 140.4 and n or NA:Not required per
<br /> Smallest Size Total p f g p D' p p �� � DCV §120.1(d)3
<br /> U yd ys Piping Fans stems Nameor Equipment Category per Equipment Type per t Sensible Su Sensible Total requirements in§141.062E oraltereds ace conditioning systems.
<br /> N Mechanical Controls H ronic5 tem Pi in y pp. () f p g y
<br /> � Available Sensible
<br /> -0 fl- item Tag Tables 110.2 Tables 110.2&TLi
<br /> itle 20 Per Rated Heating Per Rated Heating RTU-1,2 Coffee station 630 315
<br /> Mechanical Controls ❑Cooling Towers ❑✓ Ductwork 140.4 a g g Ol 02 03 04 05 06 07 08 09
<br /> il"
<br /> 0 Cooling NA:Continousl operated L
<br /> L O Chillers / Ventilation Design {kBtu/h) Output Design (kBtu/h) Load Load Conditioned Occ Sensor y p
<br /> ❑ ❑ Thermostats
<br /> (kBtu/h) (kBtu/h) (kBtu/h) (kBtu/h) Shut-Off Isolation Zone Supply Air Window per§120.2(e)3 exception
<br /> ❑Boilers Zonal S stems/Terminal Boxes (kBtu/h) Floor Area Demand Response
<br /> ❑ Y System Name System Zoning §110.20&(c)1 Controls Controls Temp.Reset Interlocks per
<br /> -0 i Being Served 110.12 and§120.2(b) Reset Add Occupancy Type Remove Last.
<br /> C p Unitary AC/ ftz §120.2(a)or§141.002E §120.2(e) 120.2 4140.4(f) v
<br /> 0 C.COMPLIANCE RESULTS RTU-1,2 Condensers AC,air cooled,package(3 phase) Yes 112 144 0 52.6 52.6 28.5 47.4 ( ) 17 Total System Required Min OA CFM 315 18 Ventilation for this System Complies. No
<br /> C
<br /> 7 Table Instructions:If any cellon this table says"DOESNOT COMPLY"or"COMPLIES with Exceptional Conditions"refer to Table D.for guidance. Auto NA:Single NA:Single NA:Auto- Reset F _Add System Remove Last:
<br /> C 01 02 03 04 05 06 07 08 09 RTU-1,2 single zone 5 25,000 ft' Setback Thermostat Timeswitch Zone DR Tstat per§110.12 Zone closing doors 'FOOTNOTES:System CFM should include both mechanical and natural ventilation for thezone/system.
<br /> Reset Remove Last
<br /> N
<br /> AJr filtration requirements a to thefollowing threes stem es per§120.1 c IA:s ace conditionin s stems utilizin ducts to su I air to occu fables ace•su on
<br /> � System System 1 FOOTNOTES:Equipmentshall be the smallestsize,within the available options of the desired equipmentlin e,necessary to meet the design heating and cooling loads of the 'FOOTNOTES.
<br /> q PPN f 9 Y tYp p (� P 9 Y 9 PPY P p , pPlY IY
<br /> E 0 Fans/ FOOTNOTES.Gravity gas wall heaters,gravity floor heaters,gravity room heaters,noncentral electric heaters,fireplaces or decorative gas appliances,wood stoves are not ventilation systems providing outside air to occupiable space;supply side of balanced ventilation systems including heat recovery and energy recovery ventilation systems
<br /> Summary Controls Terminal Box Distribution Cooling building per 4140.4(a). Healthcare facilities are excepted. required to have setback thermostats.
<br /> vJ m 110.1 AND Pumps AND Economizers AND 110.2 AND Ventilation AND Controls AND 120.3 AND Towers 'it is common practice to show rated output capacity on the equipment schedule. Sensible cooling output comes from specification sheet tables. q providing outside air to occupioblespoce.
<br /> +� 140.4 k 140.4 c 120.1 Compliance Results s *NOTES:Controls with a*require a note in the space below explaining how compliance is achieved. s Uniform Mechanical Code may have more stringent ventilation requirements;the most stringent code requirement takes precedence.
<br /> L 110.2 140.4 a 120.2 140.4 d 140.4 I §110.2(e)2 If equipment is heating only,leave cooling output and load blank. !f equipment is cooling only,leave heating output and load blank. EX.System 1:SA Tem Reset.Exempt because zones compliant with§140.4(d)'EXCEPTION 1 to 140.4 4
<br /> 0 140.4 140.4 f `Authority Having Jurisdiction may ask for load calculations used for compliance per4140.4(b). Y P p P § (fl See Standards Tables 120.1 A and 120.1-B.
<br /> L
<br /> m (See Table F) (See Table G) (See Table H) (See Table I) (See Table 1) (See Table K) (See Table L) (See Table M) Table Continued Reset Remove Last s For lecture halls with fixed seating,the expected number of occupants shall be determined in accordance with the California Building Code. GNICH
<br /> N ), a§120.2(e)3 requires systems serving rooms that are required by 130.1 c to have ligh ting occupancy sensing controls to also have occupancy sensing zone controls for ARCHITECTURE
<br /> +� Yes AND AND AND Yes AND No AND AND Yes AND DOES NOT COMPLY
<br /> N L ventilation. Examples of spaces which require lighting occupancy sensors include offices 250ft2 orsmaller,multipurpose rooms less than 1,000ft2,classrooms,conference
<br /> C- N Mandatory Measures Compliance(See Table Qfor Details) COMPLIES rooms,restrooms,aisles and open areas in warehouses,library bookstack aisles,corridors,stairwells,parking garages,and loading and unloading zones,unless excepted b
<br /> � a
<br /> P rY p g 9 9 9 9Y
<br /> ° S T U D I O
<br /> � 0
<br /> CA Building Ener Efficiency Standards-2019 Nonresidential Compliance:http://www.eneray.ca.pov/title24/2019standards/ January 2020 CA Building Ener Efficiency Standards-2019 Nonresidential Compliance:htto://www.enerav.ca.gov/title24/2019standards January 2020 CA Building Ener Efficient Standards-2019 Nonresidential Compliance:htto://www.energy.ca.povttitle24/2019standards January 2020 CA Building Ener Efficient Standards-2019 Nonresidential Compliance:htto://www.enersy.ca.pov/title24/2019standards January 2026
<br /> O Cl g gY cY P ry g gY cY P ry g gY Y P ry g gY Y P ry
<br /> 0
<br /> +' STATE OF CALIFORNIA STATE OF CALIFORNIA STATE OF CALIFORNIA STATE OF CALIFORNIA
<br /> Mechanical Systems Mechanical Systems Mechanical Systems AISMechanical Systems
<br /> C
<br /> E NRCC-MCH-E(Cmated 1/20) CALIFORNIA ENERGY COMMISSION NRCC-MCH-E(Created 1/20) CALIFORNIA EN ERGY COMMISSION NRCC-MCH-E(Created 1/20) CALIFORNIA ENERGY COMMISSION NRCC-MCH-E(Created 1/20) CALIFORNIA ENERGY COMMISSION
<br /> N
<br /> O CERTIFICATE OF COMPLIANCE NRCC-MCH-E CERTIFICATE OF COMPLIANCE NRCC-MCH-E CERTIFICATE OF COMPLIANCE NRCC-MCH-E CERTIFICATE OF COMPLIANCE NRCC-MCH-E
<br /> y Project Name: Dutch Bros.Coffee Report Page: Page 5 of 10 Project Name: Dutch Bros.Coffee Report Page: Page 6 of 10 Project Name: Dutch Bros.Coffee Report Page: Page 7 of 10 Project Name: Dutch Bros.Coffee Report Page: Page 8 of 10
<br /> 0 L Project Address: 1105 W.Yosemite Avenue-Manteca,CA95337 Date Prepared: 02/14/2020 Project Address: 1105 W.Yosemite Avenue-Manteca,CA95337 Date Prepared: 02/14/2020 Project Address: 1105 W.Yosemite Avenue-Manteca,CA95337 Date Prepared: 02/14/2020 Project Address: 1105 W.Yosemite Avenue-Manteca,CA95337 Date Prepared: 02/14/2020
<br /> ° 130.1 1001 SE SANDY BLVD, SUITE 100
<br /> O N.DECLARATION OF REQUIRED CERTIFICATES OF INSTALLATION NRCA-MCH-02-A Outdoor Air must be submitted for all newly installed HVAC units. P.DECLARATION OF REQUIRED CERTIFICATES OF VERIFICATION
<br /> N Table Instructions:Selections have been made based on information provided in previous tables of this document.If any selection needs to be changed,please explain why in (0- (' Note:MCH02-A can be performed in conjunction with MCH-07-A if Supply Fan VFD Acceptance( applicable)since testing El El Table Instructions:Selections have been made based on information provided in previous tables of this document.If any selection needs to be changed,please explain why in PORTLAND, OR 97214
<br /> ` Table E.Additional Remarks.These documents mustbe provided to the building inspector during construction and can befound online athttos://www.eneray.rn.aov/ activities overlap. Table E.Additional Remarks.These documents must be completed b a HERS Rater and provided to the building inspector during construction. The final documents must be
<br /> O P 9 P g f P Y P 9 P 9 f V. 503.552.9079
<br /> K.TERMINAL BOX CONTROLS NRCA-MCH-03-A Constant Volume Single Zone HVAC y registry, f f �, g p
<br /> \ title242019standards2019 tom liance documents onresidential Documents RC1 g created aHERSProvfdersre fist butdratscanbe ound online at htt s://www.ener ca. ov/title24/2019standards/2019 compliance documental F. 503.241.7055
<br /> 0 0 This Section Does Not Apply (0 ( NOTE:This form does not automatically move to"Yes". If Constant Volume Single Zone HVAC Systems are included in the ❑ ❑ Nonresidential Documents/NRCV
<br /> C Field Inspector ,sco eermita Ilcant should move this form to"Yes".
<br /> 0 YES NO Form/Title p p pp Field Inspector WWW.GNICHARCH.COM
<br /> L.DISTRIBUTION(DUCTWORK AND PIPING) Pass Fail (` (9- NRCA-MCH-04-A Air Distribution Duct Leakage ❑ ❑ YES NO Form/Title
<br /> + + Pass Fail
<br /> c Table Instructions:Complete the following tables to show compliance with mandatory pipe insulation requirements found in 120.3 and prescriptive requirements found in NRCI-MCH-01-E-Must be submitted for all buildings. ❑ ❑ NRCA-MCH-05-A Air Economizer Controls ❑ ❑
<br /> O N RCV-M CH-04-H Duct Leakage Test 02.14.2020
<br /> 140.4 I for dud leakage testing. NRCA-MCH-06-A Demand Control Ventilation Systems Acceptance must be submitted for all systems required to employ C� C� ❑ ❑
<br /> 0 Duct Leakage Sealing demand controlled ventilation refer to§120.1(c)3)can va outside ventilation flow rates based on maintaining interior NOTE.Must be completed by a HERS Rater
<br /> � a g g O.DECLARATION OF REQUIRED CERTIFICATES OF ACCEPTANCE � C (i ( vary g ❑ ❑
<br /> O The answers to the questions below Duct leakage testing triggered for carbon dioxide(CO2)concentration setpoints. NRCV-MCH-24 Enclosure Air Leakage Worksheet
<br /> RTU-1,2 No Table Instructions:Selections have been made based on information provided in previous tables of this document. If any selection needs to be changed,please explain why in ❑ ❑ ROFE
<br /> 0 apply to the following duct system(s): these systems? r a NRCA-MCH-07-A Supply Fan Variable Flow Controls ❑ ❑ NOTE.Must be completed by a HERS Rater p S
<br /> m Table E.Additional Remarks. These documents must be provided to the building inspector during construction and can be found online at httos://www.eneray.ca.aov/ �Q s�
<br /> N 11 No The scope of the project includes only duct systems serving healthcare facilites. title24 2019standards 2019 compliance documents onresidential Documents RCA C (91 NRCA-MCH-08-A Valve Leakage Test ❑ ❑ ( NRCV-MCH-27 High-rise Residential ❑ ❑ l,�V��LL RO
<br /> Q Y P p P g p g Y ( (9 NRCA-MCH-09-A Supply Water Temperature Reset Controls ❑ ❑ NOTE:Must be completed by a HERS Rater V
<br /> 0 12 Yes Duds stem provides conditioned air to an occu tables ace for a constant volume,single zone,s ace-wnditionin system.
<br /> Field Inspector
<br /> 13 Yes The space conditioning system serves less than 5,000 ft'of conditioned floor area. YES NO Form/Title NRCV-MCH-32 Local Mechanical Exhaust
<br /> N 0 P g Pass Fail 4 NRCA-MCH-10-A Hydronic System Variable Flow Controls ❑ ❑ ❑ ❑ 9
<br /> c aNRCA-MCH-11-A Automatic Demand Shed Controls El ElNOTE.Must be completed by a HERS Rater
<br /> 0 (' IL ■f��� fil
<br /> L LL' ■
<br /> � �0, 14 No The comb❑ined surface area of the ducts in the following locations is more than 2595 of the total surface area of the entire duct system: (�Outdoors (� (' NRCA-MCH-12-A FDD for Packaged Direct Expansion Units El ElQ* �. 1
<br /> 6 ElIn a space directly under a roof that has a U-factor greater than the U-factor of the ceiling,or if the roof does not meet the C (9- NRCA-MCH-13-A Automatic FDD for Air Handling Units and Zone Terminal Units Acceptance El ❑
<br /> - i requirements of§140.3(a)1B or if the roof has fixed vents or openings to the outside/unconditioned spaces NRCA-MCH-14-A Distributed Energy Storage DX AC Systems Acceptance ��
<br /> E ❑ In an unconditioned crawlspace NOTE.This form does not automatically move to"Yes". if Distributed Energy Storage DXACSystems are included in the scope, ❑ ❑ 9 ANIG
<br /> 0 N ❑ In other unconditioned spaces ermit applicantshould move thisform to"Yes". 0
<br /> CID 15 No 0 The scope of the project includes extending an existing duct system,which is constructed,insulated or sealed with asbestos. NRCA-MCH-15-A Thermal Energy Storage(TES)System Acceptance F CALIFd
<br /> i NOTE.This form does not automatically move to"Yes". if Chilled Water Storage,Ice-on-Coil internal Melt,Iceon-Coil External El El
<br /> scope of the project includes an existing duct system that is documented to have been previously sealed as confirmed through field verification and ( (�
<br /> C_ 16 No Melt,Ice Harvester,Brine,Ice-Slurry,Eutectic Salt,Clathrate Hydrate Slurry(CHS),Cryogenic or Encapulated(Ice Ball)Systems
<br /> diagnostic testing in accordance with procedures in the Reference Nonresidential Appendix NA2.
<br /> 0 � are included in thescope,permit applicant should move this form to"Yes".
<br /> 17 Duct system shall be sealed in accordance with the California Mechanical Code.
<br /> Remove Last C 4 NRCA-MCH-16-A Supply Air Temperature Reset Controls El El
<br /> L
<br /> T � (' ff: NRCA-MCH-17-A Condenser Water Temperature Reset Controls ❑ ❑
<br /> O M.COOLING TOWERS C4 NRCA-MCH-18 Energy Management Control Systems El E]
<br /> O U This Section Does NotApply C (0- NRCA-MCH-19 Occupancy Sensor Controls El El
<br /> C (9, NRCA-MCH-20 Multi-Family Ventilation ❑ ❑ r-
<br /> O �
<br /> C� NRCA-MCH-21 Multi-Family Envelope Leakage ❑ ❑ Q
<br /> N I
<br /> �oF
<br /> 0) N V
<br /> p Oo
<br /> E Q_ m
<br /> -0 N
<br /> 0
<br /> Is_ CA Building Energy Efficiency Standards-2019 Nonresidential Compliance:htto//www.enerev.ca. ov title24 2019standards January2026 CA Building Energy Efficiency Standards-2019 Nonresidential Compliance:htta//www.enerev.ca. ovh itle24 2019standards January2026 CA Building Energy Efficiency Standards-2019 Nonresidential Compliance:http:l/www.enerey.ca.pov/title24/2019standards Jan us ry2026 CA Building Energy Efficiency Standards-2019 Nonresidential Compliance:htto//www.enerev.ca. ov title24 2Ol9standards January2020
<br /> 4-
<br /> , Q
<br /> U U v^I
<br /> -0
<br /> C C STATE OF CALIFORNIA STATE OF CALIFORNIA
<br /> Mechanical Systems 1121L Mechanical Systems
<br /> JNRCC-MCH-E(Created 1/20) CALIFORNIA ENERGY COMMISSION NRCC-MCH-E(Created 1/20) CALIFORNIA ENERGY COMMISSION
<br /> J CERTIFICATE OF COMPLIANCE NRCC-MCH-E CERTIFICATE OF COMPLIANCE NRCC-MCH-E
<br /> Project Name: Dutch Bros.Coffee Report Page: Page 9 of 10
<br /> N Project Name: Dutch Bros.Coffee Report Page: Page 10 of 10
<br /> C U) lProject Address: 1105 W.Yosemite Avenue-Manteca,CA95337 Date Prepared: 02/14/2020 Project Address: 1105 W.Yosemite Avenue-Manteca,CA95337 Date Prepared: 02/14/2020 O
<br /> O 0
<br /> +' Q.MANDATORY MEASURES DOCUMENTATION LOCATION DOCUMENTATION AUTHOR'S DECLARATION STATEMENT � }
<br /> c
<br /> 0 Table Instructions:Indicate where mandatory measures are documented in the plan set or construction documentation.Forany mandatory measures that do notopply, mark 1.1 certify that this Certificate of Compliance documentation is accurate and complete. Co
<br /> (n
<br /> the plan sheet or construction document location as"N/A"any active cells that are left blank will result in non-compliance in Table C pROFESS/ O
<br /> -p 02 Documentation Author Name: Darrell Case Documentation Author Signature:
<br /> Ol pE1LR 6 (�l
<br /> j1 Plan sheet or construction document location Company: Case Engineering,Inc. Signature Date: 02/14/2020 IL J
<br /> 0 0Compliance with Mandatory Measures documented through Address: 796 Merus Court CEA/HERS Certification Identification(if applicable): r A�/�^1^m
<br /> MCH Mandatory Measures Note Block: No City/State/Zip: Fenton,MO 63026 Phone: 636-349-1600 �`�S1
<br /> NL 3Q 03 04 RESPONSIBLE PERSON'S DECLARATION STATEMENT 9�O CALF �" O
<br /> Mandatory Measure Plan sheet or construction document location I certify the following under penalty of perjury, r 1 0
<br /> -p fy g p y p j ry,under the laws of the State of California: V
<br /> Heating Equipment Efficiency per 110.1 M1.0 1.The information provided on this Certificate of Compliance is true and correct. 7
<br /> 0
<br /> Cooling Equipment Efficienc per 110.1 M1.0 L 4-
<br /> gY P 2.I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of
<br /> 0 N Furnace Standby Loss Control per 110.2 d N/A Compliance(responsible designer)
<br /> aJ
<br /> Duct Insulation per 120.4 M3.0 3.The energy features and performance specifications,materials,components,and manufactured devices forthe building design or system design identified on this
<br /> N Certificate of Compliance conform to the requirements of Title 24,Part 1 and Part 6 of the California Code of Regulations. (V
<br /> U) U Heating Hot Water Equipment Efficiency per 110.1 N/A P q g
<br /> 0 -
<br /> Cooling Chilled and Condenser Water Equipment Efficiency per 110.1 N/A 4.The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable //���
<br /> L W
<br /> L t'O � r-
<br /> compliance documents,worksheets,calculations,plans and specifications submitted to the enforcement agencyfor approval with this building permit application.
<br /> Open and Closed Circuit Cooling Towers conductivity of flow-based controls per 110.2 e 1 N/A Q
<br /> O S.I will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s)issued for the building,and made available / lV VJ
<br /> C) Open and Closed Circuit Cooling Towers Flow Meter with analog output per§110.2(e)3 N/A to the enforcement agency for all applicable inspections.I understand that a completed signed copy of this Certificate of Compliance is required to be included with the ` 0
<br /> C Open and Closed Circuit Cooling Towers Overflow Alarm per 110.2 e 4 N/A documentation the builder provides to the building owner at occupancy. ' `
<br /> Q LJO
<br /> N 0 Open and Closed Circuit Cooling Towers Efficient Drift Eliminators per§110.2(e)5 N/A Responsible Designer Name: Darrell Case Responsible Designer Signature: r�Q�t FeILL Ro v �I
<br /> Pipe Insulation per 120.3 b N/A Company: Case Engineering,Inc. Date Signed: 02/14/2020 �i~ r°y () W T� 00
<br /> O P Ygc3 / y �t U O N v O� Q
<br /> Combustion air shutoff,combustion air fan controls and stack design and controls for u� � m
<br /> -0 boilers per 120.9 N/A Address: 796 Merus Court License: M28031 * 8031 0 J O U
<br /> N
<br /> 3Heat Pump with Supplementary Electric Resistance Heater Controls per 110.2 b N/A City/State/Zip: Fenton,MO 63026 Phone: 636-349-1600 N9 C7iANIC * W m ! 2 r- i
<br /> O The air duct and plenum system is designed per§12 A a}-(f) M1.0,M3.0 �OFCALIf � J�xx iD
<br /> o O Kitchen range hoods shall be rated for sound in accordance with Section 7.2 of ASHRAE N/A e O W Q n
<br /> - 62.2 00
<br /> \.!
<br /> L. <- L O 0
<br /> E
<br /> C
<br /> o .� < Q
<br /> a�
<br /> C:
<br /> 0 =
<br /> ISSUED FOR PERMIT:
<br /> 41 02. 14.20
<br /> aJ T CA Building Energy Efficiency Standards-2019 Nonresidential Compliance:htto://www.enerav.ca.govAitle2412019standards January202O CA Building Energy Efficiency Standards-2019 Nonresidential Compliance:htto://www.enerLv.ca.aov/title24/2019standards January 2020
<br /> C -
<br /> Ut N
<br /> N 0
<br /> � U
<br /> N
<br /> O
<br /> U
<br /> U
<br /> U) REV: DATE: DESCRIPTION:
<br /> U_
<br /> � d
<br /> 0
<br /> M a
<br /> 0
<br /> 0
<br /> -0 g_
<br /> o
<br /> U 47
<br /> 0
<br /> m SHEET NAME:
<br /> 0 0
<br /> 0
<br /> MECHANICAL TITLE 24
<br /> CALCULATIONS
<br /> 0
<br /> m
<br /> U
<br /> H
<br /> CPLSE SHEET NUMBER:
<br /> Engineering Inc.
<br /> M4 . 0
<br /> 796 Merus Court T 636.349.1600
<br /> _O
<br /> St.Louis,MO 63026 F 636.349.1730
<br /> 2019 DB Franchising USA, LLC
<br />
|