<br /> PLUMBING SYMBOLS LEGEND
<br /> - G - GAS PIPING PLUMBING FIXTURE SCHEDULE KITCHEN FIXTURE SCHEDULE
<br /> o a
<br /> 0 C -CD- CONDENSATE DRAIN PIPING COLD HOT VENT FILTERED
<br /> DESIGNATION MODEL NUMBER MFR. WASTE REMARKS COLD HOT VENT
<br /> 0) - - - COLD WATER PIPING WATER WATER SIZE DESIGNATION MFR. AND MODEL NUMBER COLD WASTE REMARKS
<br /> WATER
<br /> WATER CLOSET WATER WATER SIZE
<br /> C: a -__- 18" HIGH BOWL CSEAT AND CAP BOLTS. 1.28 GAL PER
<br /> HOT WATER PIPING (140°) K-3619
<br /> ° P-1 ADA COMPLIANT ELONGATED KOHLER %2" - 4" 2" FLUSH INSTALL WITH ANGLE STOP. PROVIDE "WHITE"
<br /> ;n --- -- HOT WATER RECIRCULATING PIPING BOWL COLOR SELECTION FOR CHINA. LD)UVdflD0 -= -SAN- SANITARY WASTE PIPING ESPRESSO MACHINE CONTRACTOR TO PROVIDE2" FW LINE WITH BRAIDED FLEX HOSE AND BALL
<br /> o DELTA FAUCET 501 LF-HGMHDF SINGLE LEVER WITH 0.5 1 s
<br /> ° EQ-1 (3 MACHINE GROUP) - (4)/2" - (3)/4" - VALVE SHUT-OFF. PROVIDE 3" INDIRECT WASTE LINE TO FLOOR SINK BELOW.
<br /> -FW- FILTERED WATER PIPING LAVATORY SINK GPM VANDAL RESISTANT AERATOR, GRID STRAINER BY OWNER4
<br /> TAILPIECE, OFFSET WHEELCHAIR TRAP LOOSE KEY STOP. TYPICAL OF 3 MACHINES IN GROUP.
<br /> o, -140°- 140°WATER PIPING P-2 K-2032 KOHLER %2" 2" 2"
<br /> ° Q) ADA COMPLIANT INSTALL HANDLE LIMIT STOP KIT WITHIN SINGLE LEVEL
<br /> E a -GVH GREASE WASTE PIPING MIXING FAUCET TO LIMIT OUTLET HOT WATER SUPPLY TO
<br /> ° ------ SANITARY VENT PIPING 110°F.
<br /> X SET INTO PRE-CUT HOLE IN COUNTER. CONNECT CW BRAIDED
<br /> VTR VENT THROUGH ROOF MOP SERVICE BASIN WITH 10" HIGH WALLS 3" DRAIN
<br /> � MOP SINK STAINLESS TO FAUCET AND PVC DRAIN TO WELL. PIPE DRAIN STRAIGHT
<br /> o - P-3 ZURN %4" %4" 3" 2" 830-AA SERVICE FAUCETS WITH VACUUM BREAKER, EQ-4
<br /> DIPPERWELL FAUCET& �2„ _ _ ACK TO WALL, DOWN WALL, THEN FORWARD BETWEEN WHEELS OF ICE
<br /> C: JO PLUMBING TRAP 21996-24 INTEGRAL STOPS AND HOSE WITH HOSE BRACKET. SINK ASSEMBLY
<br /> IN BRACED TO FLOOR WITH UNISTRUT ANDA 1" AIR GAP OVER FLOOR
<br /> +' PIPE TURNING DOWN INK
<br /> °
<br /> _0 ° ____O PIPE TURNING UP FLOOR SINK 12"X 12"X 6" DEEP CAST IRON BODY WITH WHITE
<br /> o E P-4 ZURN - - 4" 2"
<br /> GL ° CHECK VALVE Z1900 PORCELAIN ENAMEL
<br /> ° �~ CONTRACTOR TO PROVIDE 2" FW LINE WITH BALL VALVE SHUT-OFF AND PROVIDE
<br /> -° L
<br /> C: �I� UNION POLISHED BRASS STRAINER, AND TRAP PRIMER. LOCATE ICE MACHINE 1 FINAL COLD WATER CONNECTION TO ICE MACHINE. PROVIDE 2" INDIRECT WASTE
<br /> AFF ABOVE FINISHED FLOOR P 7 FLOOR DRAIN ZURN - - 2" 2" PRIMER WITH SHUT-OFF VALVE AND ACCESS PANEL IN EQ-9 BY OWNER (2)/2 - �4, - LINE TO FLOOR SINK BELOW. BACKFLOW ON FILTER ASSEMBLY IF REQUIRED.
<br /> c -0 FD2201 WALL. COORDINATE WITH GENERAL CONTRACTOR. NOTE: PC AND EC TO PROVIDE ADDITIONAL OUTLET AND WATERLINE STOP FOR
<br /> ° CO CLEAN OUT
<br /> E o FUTURE 2ND ICE MACHINE.
<br /> PRESSURE REGULATING VALVE (PRV) (50 PSI)
<br /> GREASE INTERCEPTOR SCHIER GB-50 50GPM BELOW-GRADE GREASE
<br /> o Q, BALL VALVE P-9 SCHIER - - 4" 2"
<br /> GB-50 INTERCEPTOR
<br /> BALANCE VALVEGNICH
<br /> EQ-10 BYEOWNERGE BIN _ _ Y4, - PROVIDE 4" INDIRECT WASTE LINE TO FLOOR SINK BELOW.
<br /> a EWF ELECTRIC WATER FOUNTAIN
<br /> 199,000 BTU TANKLESS WATER HEATER. PROVIDE T&P ARCHITECTURE
<br /> O
<br /> O d GCO GRADE CLEAN OUT RELIEF VALVE, BRASS DRAIN VALVE FOAM INSULATION S T U D I O
<br /> L
<br /> oP-10 WATER HEATER RINNAI 1" 1" _ 3.. PER ASHRAE STANDARD, GAS PRESSURE REGULATOR
<br /> ° CIRCUIT SETTER BALANCE VALVE RUR1991N AND ANODE ROD. PROVIDE AND INSTALL INTAKE AND
<br /> EXHAUST AIR FLUES IN ACCORDANCE WITH 1
<br /> ie POINT OF CONNECTION EQ-11 BUNN WATER DISPENSER (4)/2„ CONTRACTOR TO PROVIDE 2" FW WITH BALL VALVE SHUT-OFF. SUPPLIED WITH
<br /> ° MANUFACTURE'S INSTALLATION INSTRUCTIONS. BY OWNER ASSE 1022 INLINE CARTRIDGE BACKFLOW.
<br /> OF BELOW FLOOR
<br /> O L
<br /> OC ABOVE CEILING P-11 WALL HYDRANT WATTS 1/2" - _ NON-FREEZE WALL HYDRANT, MOUNT AT 24"A.F.F. AT 1001 SE SANDY BLVD, SUITE 100
<br /> ° ° HY-420-8 REAR ELEVATION. 1 PORTLAND, OR 97214
<br /> -PD- PUMP DISCHARGE PLUMBING CONTRACTOR TO PROVIDE-!" HW LINE WITH BALL VALVE SHUT-OFF.
<br /> L_ V. 503.552.9079
<br /> RAPID RINSE STATION s PROVIDE FINAL COLD WATER CONNECTION TO RAPID RINSE STATION. PROVIDE 4"
<br /> o a EQ-12 - - - /4 - F. 503.241.7055
<br /> ° GENERAL NOTES: BY OWNER INDIRECT WASTE LINE TO FLOOR SINK BELOW. (PROVIDE RPZ IF REQUIRED BY WWW.GNICHARCH.COM
<br /> ° YARD HYDRANT LOCAL CODE)
<br /> 1. EXACT LOCATION OF PLUMBING FIXTURES SHALL BE P-12 WATTS 1/2" - - - FROST PRROF 2FT. BURY DEPTH
<br /> DETERMINED FROM ARCHITECTURAL DRAWINGS. EVERBILT
<br /> GLASS FILLER 1 1 04.29.2020
<br /> 2. BEFORE SUBMITTING BID, THE PLUMBING CONTRACTOR EQ-19 BY OWNER - (4)/2 - - - z ' FILTER WATER SUPPLY- NO DRAIN REQUIRED
<br /> ° SHALL REVIEW THE ARCHITECTURAL DRAWINGS AND �pROFEJ
<br /> INCLUDE IN HIS BID AN AMOUNT TO FURNISH AND INSTALL HAND SINK ADVANCE
<br /> ° ANY FIXTURES WHICH ARE SHOWN IN ADDITION TO P-13 %2" %" 2" 2" PROVIDED BY DBC, INSTALLED BY GC. GENERAL NOTES: Q' �I.L R
<br /> a 7-PS-56 TABCO Dy
<br /> ° FIXTURES SHOWN ON THE PLUMBING DRAWINGS. 1. PLUMBING CONTRACTOR SHALL STRAP UP ALL SUPPLY LINES TIGHT TO STAINLESS TABLES WITH ZIPTIES SO THAT UNDER COUNTER EQUIPMENT CAN BE REMOVED
<br /> WITHOUT GETTING CAUGHT IN THE BRAIDED STAINLESS SUPPLY LINES. c�
<br /> ° 3. CONTRACTOR SHALL VERIFY INVERT ELEVATION OF 2. PLUMBING CONTRACTOR SHALL RUN DRAINS OFF OF STAINLESS TABLES AND DRINK EQUIPMENT IN RIGID ABS OR PVC PIPE. DRAINS ARE TO BE RUN TOWARD THE8U31 m
<br /> ` SEWERS TO WHICH NEW WASTE LINES ARE TO BE 1 1
<br /> ° PLUMBING CONTRACTOR TO PROVIDE-" CW AND-" HW CENTER OF THE FLOOR SINK BENEATH EACH TABLE. DRAINS WILL FIT BETWEEN THE WHEELS OF THE ROLLING ICE BINS. PC TO STRAP DRAINS TO FLOOR WITH
<br /> E L CONNECTED BEFORE MAKING UP OR INSTALLATION OF NEW 2 2 (P
<br /> °
<br /> WASTE SYSTEM. P-14 3 COMPARTMENT SINK SUPPLY LINES WITH ANGLE VALVE SHUOFF AND SUPPLY UNISTRUT OR SIMILAR.
<br /> q) EY2„ )/2" (3)2" - STOPS TO SINK FAUCET. PLUMBING CONTRACTOR TO 9 ANIC,�I
<br /> CO v 4. CONTRACTOR SHALL VERIFY AND COORDINATE LOCATION BY OWNER PROVIDE (3)2"WASTE LINES FROM EACH BAY AND �FCAI.IFV''
<br /> OF ALL PLUMBING LINES WITH DUCTWORK AND ELECTRICAL INDIRECT WASTE TO FLOOR SINK BELOW.
<br /> SERVICES.
<br /> 5. THE INSTALLATION OF ALL VALVES, UNIONS,
<br /> L
<br /> a THERMOMETERS, GAUGES, OR OTHER INDICATING OR T&S
<br /> ° o RECORDING EQUIPMENT, OR SPECIALTIES REQUIRING P-15 PULL-OUT SPRAYER HANDLE (T&SBRASS.0 %2" _ TO BE INSTALLED IN DB PROVIDED STAINLESS STEEL
<br /> FREQUENT READING, REPAIRS, ADJUSTMENT, INSPECTION, TABLE
<br /> o REMOVAL OR REPLACEMENT SHALL BE CONVENIENTLY AND OM) -
<br /> o ACCESSIBLY LOCATED WITH REFERENCE TO THE FINISHED Q
<br /> °
<br /> a; BUILDING.
<br /> O
<br /> U
<br /> 0 6. WHERE POSSIBLE, THE VENTS TOGETHER SO THAT A PLUMBING CONTRACTOR SHALL INSTALL WATER FILTER O
<br /> MINIMUM NUMBER TERMINATE THROUGH THE ROOF.
<br /> E 0- P 16 WATER FILTER EVERPURE 1%" SUPPLIED BY OWNER. PROVIDE WITH BALL ISOLATION L CV
<br /> m
<br /> ° a) 7. WATER CLOSETS IN PUBLIC TOILET ROOMS SHALL CENTER BY OWNER VALVE AND UNION ON BOTH ENDS OF ALL CONNECTIONS. I Q
<br /> ON THE FINAL LAYOUT OF TOILET PARTITIONS. PROVIDE RPZ WITH DRAIN CUP IF REQUIRED BY CODE. C�
<br /> a
<br /> 0 8. ALL VENTS THROUGH ROOF SHALL BE AT LEAST 10'
<br /> Q) v REMOVED FROM ALL AIR INTAKES, EVAP. COOLERS.
<br /> t _j CIRCULATING PUMP 115V, 3250 RPM, PROVIDE WITH AQUASTAT AND/OR TIMER
<br /> 0 J 9. CONTRACTOR SHALL NOT CUT HOLES IN STRUCTURAL CP-1 0010 TACO - - - - AS REQUIRED.
<br /> N MEMBERS WITHOUT FIRST SECURING WRITTEN APPROVAL O
<br /> ° FROM ARCHITECT.
<br /> C: °, 1 HP VARIABLE SPEED CONTROLLER, 115V INPUT, 30 GPM '~
<br /> ° c � ;
<br /> 10.CONTRACTOR SHALL INSTALL DIELECTRIC UNIONS AT BOOSTER PUMP BP-1 AQUAVAR BAQUABII AQUAVAR 1-1/4" - _ _ @ 35 PSI BOOST. PROVIDE ALL NECESSARY VALVES AND O
<br /> CONNECTION OF DISSIMILAR METALS. ACCESSORIES RECOMMENDED BY MANUFACTURER FOR U
<br /> T 1151AB25HM03 A COMPLETE SYSTEM. FORMULA FOR SIZING GREASE INTERCEPTORS Q)
<br /> ° ° 11.CONTRACTOR SHALL ROUGH-IN ALL WASTE AND SUPPLIES WATER PRESSURE CALCULATION
<br /> ILL
<br /> in � TO SPECIAL EQUIP. ACCORDING TO MANUFACTURERS SHOP 1 INTERIOR/EXTERIOR IN-FLOOR GREASE INTERCEPTORS < �� 0
<br /> Q
<br /> o DRAWINGS AND MAKE FINAL CONNECTIONS ALL SUPPLIES GENERAL NOTES: Length XWidth XDepth/231= Gallons X .75 Fill Factor X Number of Compartments= Size of Grease Interceptor(GPM)
<br /> SHALL BE VALVED. 1. ALL PLUMBING FIXTURES, FITTINGS, PIPES, ETC SHALL BE IAPMO APPROVED OR LISTED BY A NATIONALLY RECOGNIZED TESTING LABORATORY (NRTL).
<br /> � � V
<br /> 12.ASSUMED WATER PRESSURE-CONTRACTOR SHALL VERIFY STATIC PRESSURE 60PS1 Discharge from 3-Compartment Sink z
<br /> o ACTUAL WATER PRESSURES PRIOR TO CONSTRUCTION. IFPRESSURE DROP THRU FRICTION LOSS FROM MAIN Compartment Deminsions: i
<br /> PRESSURE IS LESS THAN 60 PSI, CONTRACTOR SHALL OPSI 16" X 14" X 14" / 231 = 20 X .75 Fill Factor X 3Com artments = 31 Gal Q)
<br /> C TO METER (12"WATER LINE) p
<br /> CONTACT THE ENGINEER FOR PIPE SIZING EVALUATION. IF
<br /> o - PRESSURE EXCEEDS 80 PSI, A PRESSURE REDUCING VALVE PRESSURE DROP THRU METER 5PS1 Total GPM / Retention Time Q)
<br /> Q) SHALL BE PROVIDED. PIPING VELOCITY SHALL NOT EXCEED
<br /> ° PRESSURE DROP THRU FRICTION LOSS FROM 31 Gal / 1 Min = 31 GPM GREASE WASTE SIZE: 4" O Q O
<br /> ° 8 FPS AND HOT WATER VELOCITY SHALL NOT EXCEED 5FPS. 5.2PS1
<br /> E a METER TO BACKFLOW {'
<br /> O` L0
<br /> ° PRESSURE DROP THRU BACKFLOW AND STRAINER 15PS1 v Q
<br /> o FIELD VERIFICATION NOTES: FIXTURE x NUMBER OF x FIXTURE TOTAL FIXTURES / 2 DFU = FLOW RATING GPM V) Q) U 00 Q
<br /> PRESSURE DROP DUE TO ELEVATION TO PUMP 4.3PS1 FIXTURES VALUE UNIT UNITS PER GPM Q O� U
<br /> 1. THE PLUMBING CONTRACTOR SHALL VISIT THE SITE PRIOR TO L O J O
<br /> ° CBID TO FIELD VERIFY ALL EXISTING CONDITIONS WHICH MAY SANITARY SIZING CALCULATION PRESSURE AVAILABLE @ PUMP 22.5PS1 Q) X
<br /> C: FLOOR FIXTURES x 7 x 3 24 2 12
<br /> o AFFECT HIS BID. THE FOLLOWING ITEMS SHALL BE VERIFIED.
<br /> = / = 1 -�
<br /> o ° 1.A.EXACT PLACEMENT SIZE CAPACITY MANUFACTURER AND o�
<br /> o CONDITION OF ALL EXISTING PLUMBING EQUIPMENT WITHIN DFU PRESSURE AVAILABLE AFTER PUMP 57.5PS1 _ = O U -+- CQ
<br /> ° FIXTURE DESIGNATION QUANTITY TOTAL HAND SINKS x 2 x 2 4 / 2 2.0 .� Lo r
<br /> E SCOPE OF WORK, WHETHER SPECIFICALLY SHOWN OR NOT. WASTE PRESSURE NEEDED AT FIXTURES 35PS1 O i
<br /> SERVICE BASIN 1 = / = ,� O 0
<br /> 0 'cn x x 3 2 1.5
<br /> 3 1-
<br /> 1.B.SIZE AND LOCATION OF ALL EXISTING WASTE, GREASE Q
<br /> WASTE, VENT AND WATER PIPING. Q
<br /> C: -1 4 1 4 PRESSURE DROP DUE TO ELEVATION 4PS1
<br /> °
<br /> o TOTAL REQUIRED FLOW RATING GPM = 46.5
<br /> 2. ALL REFERENCES ON THESE DRAWINGS TO EXISTING LAVATORY P-2 1 1 1 REMAINING PRESSURE 26.5PS1 ISSUED FOR PERMIT.
<br /> EQUIPMENT0 (D , WATER IS THE RESPONSIBILITY OF THE NATURAL GAS SYSTEM LENGTH 150FT *FLOOR SINKS RECEIVING DISCHARGE FROM COMPARTMENT SINK(S), NOT COUNTED. REFER TO VOLUME CALCULATION FOR SINKS IN
<br /> CONTRACTOR TO VERIFY ALL THESE ITEMS PRIOR TO BID AND FLOOR DRAIN P-7 5 2 10 THIS TABLE. 02. 14.20
<br /> INCLUDE IN HIS BID ANY AND ALL AMOUNTS REQUIRED TO CALCULATION EQUIVALENT PIPE LENGTH 187.50
<br /> ACCOMMODATE EXISTING CONDITIONS.
<br /> 3 COMP SINK P-14 6 1 6 DEMAND ALLOWABLE LOSS PER 100FT OF PIPE: 26.5PS1 X 10OFT 14.1 PSI
<br /> 3. NO ALLOWANCES WILL BE MADE AFTER THE PROJECT HAS APPLIANCES (MBH) 187.50 FT
<br /> °
<br /> BEEN AWARDED FOR FAILURE TO VERIFY EXISTING
<br /> RTU-1 115.0
<br /> CONDITIONS. FLOOR SINK P-4 6 6 6 RTU-2 115.0 FIXTURE UNITS DOMESTIC WATER
<br /> U) o WATER HEATER 398.0 HOT REV: DATE: DESCRIPTION:
<br /> 4. ANY DISCREPANCIES WHICH MAY AFFECT THE CONTRACTOR HAND SINK P-13 2 2 4 FIXTURES QUANTITY COLD WATER
<br /> ° BID SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER TOTAL BTU LOAD 628 WATER 1 04.29.20 CITY COMMENTS
<br /> U AND ARCHITECT FOR DIRECTION. MOP SINK P-3 3 1 3
<br /> -0 i HAND SINK 1 1 1
<br /> o
<br /> _ ° SYSTEM LENGTH 48
<br /> _0 5. PLUMBING ROUTINGS BASED ON OWNER'S SCHEMATICS OF LAVATORIES 1 1 1
<br /> a� LOCATION OF EXISTING FIXTURES AND SHELL DRAWINGS. 1 PER 2019 CALIFORNIA PLUMBING CODE TOTAL (DFU) 64 DEVELOPED PIPE LENGTH 60
<br /> ° o CONTRACTOR RESPONSIBLE FOR VERIFICATION OF ACTUAL WATER CLOSETS 1 2.5 0.0
<br /> 0 0,LOCATION OF SUPPLY LINES AND MAKING APPROPRIATE SHEET NAME:
<br /> M ADJUSTMENTS TO ACTUAL CONDITIONS IN THE FIELD. KITCHEN SINK 2 6 6
<br /> o 6. PRIOR TO CONSTRUCTION, VERIFY THE LOCATION OF THE MOP SINK 1 2 2 PLUMBING
<br /> HVAC/WALK-IN CONDENSATE FLOOR SINK. IF SLOPE AND
<br /> o DISTANCE OR IF IT IS INFEASIBLE TO DISPOSE OF WALK-IN WATER DISPENSER 4 4 0 SPECIFICATIONS &
<br /> COOLER CONDENSATE. USE A CONDENSATE PUMP. ESPRESSO MACHINE (3 SCHEDULES
<br /> m 4 12 0.0
<br /> MACHINE GROUP) CAkSE
<br /> ICE MAKER 1 1.0 0.0
<br /> -�
<br /> o RAPID RINSE 5 5.0 0.0 0
<br /> SHEET NUMBER:
<br /> Engineering Inc.
<br /> s
<br /> E E gi TOTAL 34.5000 10.0000 Pi . O
<br /> �
<br /> c
<br /> N GPM 20 8 796 Merus Court T 636.349.1600
<br /> St.Louis,MO 63026 F 636.349.1730
<br /> 02019 DB Franchising USA, LLC
<br />
|