Laserfiche WebLink
3 <br /> ° <br /> C <br /> L <br /> � O <br /> C <br /> O ° <br /> + C <br /> ° ° <br /> L <br /> 0 <br /> °1 � <br /> C ° <br /> O <br /> L <br /> o ' ' <br /> of <br /> U � <br /> N <br /> fll L <br /> 0 L <br /> ° <br /> E <br /> X <br /> X � <br /> � 3 <br /> ° <br /> o C <br /> 0 <br /> vi + <br /> U N <br /> 7 d <br /> O E <br /> L 0 <br /> -° L <br /> C ° <br /> ° � <br /> C 11 1 <br /> (n 0 <br /> C <br /> E ° <br /> GNICHcn L <br /> NOTE: <br /> 1` ARCHITECTURE <br /> oAN APPROVED BACKFL N DEVICE IS REQUIRED FOR BEVERAGE MACHINES CONNECTED TC <br /> E31 S T D I 0 <br /> o a O O THE WATER SUPPLYR 2019 CPC. <br /> 1 <br /> TANK-LESS WATER HEATERS SHALL BE NATIONALLY LISTED AND BE INSTALLED IN ACCORDANCE WITH <br /> THE INSTALLATION INSTRUCTIONS THAT WERE APPROVED AS PART OF THEIR LISTING. THE GAS PIPING <br /> c SERVING THIS APPLIANCE MUST BE SIZED IN COMPLIANCE WITH THE WATER HEATER'S LISTED <br /> ° EQ- 1 INSTALLATION INSTRUCTIONS PER 2015 IPC. <br /> o EQ-12 STUB-OUTS FOR COFFEE EQUIPMENT AT TABLE SHALL BE 24"A.F.F. 1001 SE SANDY BLVD, SUITE 100 <br /> PORTLAND, OR 97214 <br /> -CF-EQ-19 <br /> oV. 503.552.9079 <br /> o a F. 503.241.7055 <br /> o WWW.GNICHARCH.COM <br /> •E .�' <br /> EQ-1 <br /> 04.29.2020 <br /> o ° Q-4 �}?R0FEjc. <br /> �I.L R <br /> ® P-1 UNISEX ° <br /> ° o I <br /> RTU ACCESSIBLE �3t <br /> U <br /> RESTROOM ELEC. � <br /> 0 2 O O P-7 ROOM �9ANiG <br /> EQ-4 EQ-1 PLUMBING KEYED NOTES <br /> C ; COOLER <br /> U <br /> 4 FW —CW <br /> EQ-19 O ROUTE NEW 1-1/2"WATER PIPING TO CONNECT TO WATER METER AND MAIN. VERIFY EXACT SIZE AND LOCATION IN FIELD. <br /> a CW ° — VERIFY WITH WATER COMPANY AND LANDLORD EXACT CONNECTION, DELIVERY PRESSURE AND METER REQUIREMENTS <br /> EQ-12 <br /> HW <br /> ° PRIOR TO WORK. WATER PIPING SIZE BASED ON 52 PSI INCOMING STATIC WATER PRESSURE. PROVIDE PRESSURE <br /> REDUCING VALVE IF PRESSURE IS OVER 80 PSI. CONTACT ENGINEER IMMEDIATELY IF LOW PRESSURE (BELOW 60 PSI) OR <br /> ° RT P-2 I DISCREPANCIES ARE FOUND FOR PIPING CHANGES. <br /> ° a I I E6-11 I Q <br /> a00i 1 P-15 - PROVIDE WATTS LF009 BACKFLOW PREVENTER ABOVE MOP SINK. ROUTE RELIEF PIPES TO DISCHARGE INDIRECTLY TO <br /> -o o P-13 I I MOP SINK. n` O <br /> E N <br /> a I O3 WATER FILTRATION SYSTEM TO BE PROVIDED AND INSTALLED BY SELECTED WATER FILTRATION MANUFACTURER. m <br /> c EQ-12 U I PLUMBING CONTRACTOR TO INSTALL BYPASS PIPING TO WATER FILTRATION SYSTEM. -�- <br /> ° <br /> _0 <br /> C O4 DROP 1/2" CW AND 1/2" FW LINES DOWN IN WALL ON WARM SIDE OF INSULATION TO BE RAN UNDER COUNTER TO SERVE <br /> L_ v ® 16 FIXTURES. <br /> L J = <br /> _0 J � EQ-4 OS PROVIDE FULL SIZED BYPASS VALVES FOR THE MAIN CW LINE SERVING THE WATER FILTRATION SYSTEM. <br /> o Cl) U I I I PRODUCTION <br /> I ROUTE TO CONNECT TO NEW GAS METER. GAS METER'S NEW DEMAND = 628MBH FIELD VERIFY ACTUAL LOCATION O <br /> C: <br /> I MS-1 O ( ) (DO -� <br /> = -_ I = I APPROXIMATE LENGTH FROM FURTHEST FIXTURE TO METER BANK 60'-0". CONTRACTOR TO VERIFY EXACT LENGTH, .J <br /> o C EQ-1 L AVAILABLE PRESSURE AND INSTALLATION LOCATION IN FIELD. VERIFY WITH GAS COMPANY FOR EXACT CONNECTION <br /> - --FW - , - - FW - - - 5 I 1 AND METER INSTALLATION GUIDELINES AND REQUIREMENTS PRIOR TO ANY WORK. O Q) J <br /> 0 0 10 - -- ---HW -- -- -- - HW -- -- -- HW J <br /> E -12 I -HW 1 HW O7 PROVIDE CIRCULATING PUMP. SEE PLUMBING FIXTURE SCHEDULE ON DRAWING P1.0 FOR ADDITIONAL INFORMATION. <br /> I � <br /> -0 m -—CW - - --CW - - CW - <br /> o + <br /> CW O8 NOT USED. 0 <br /> _0 - EQ-4 <br /> EQ-19 P-13 P-14 P-10 U 7 D_ <br /> EQ-11 Q-19 = U O COLD WATER DOWN FROM TRAP PRIMER TO FLOOR DRAIN. SEE DETAIL ON DRAWING P3.0 FOR MORE INFORMATION. L '~ <br /> a ❑ _ � 01 <br /> L Q) <br /> a0Ci CW <br /> .-FW EQ-1 U� _ EQ-9 EQ-10 P-16 OJ I 10 PIPING TO BE RAN LOW IN WALL BELOW WINDOW. 0 Q) <br /> o •(D 4 FEQ-11 C P-11 15 0 � <br /> L <br /> L - - j 1 1 NOT USED. M O <br /> 0 — -FW- 7 Q Q M <br /> E 12 ROUTE EXPOSED COLD WATER PIPING DOWN TO COUNTER AND TO RAPID RINSE. O� L0 <br /> T P-10 BP-1 14 �� U Q p_ <br /> 13 PROVIDE EARTHQUAKE ACTUATED GAS SHUT OFF VALVES, AT GAS METER ON SUPPLY TO BUILDING, INSTALL PER r 1 v) U op Q <br /> o 1 0 4 6 13 2 MANUFACTURER'S RECOMMENDATIONS. V 0 N O� <br /> m � <br /> J O U <br /> ° 0 14 INSTALL BOOSTER PUMP SYSTEM ON PLATFORM ABOVE MOP SINK. INSTALL PER MANUFACTURERS GUIDELINES, U <br /> C: PROVIDE WITH ALL NECESSARY VALVES AND ACCESSORIES FOR A COMPLETE SYSTEM. COORDINATE EXACT —-z O <br /> ° o INSTALLATION OF ALL SYSTEM COMPONENTS IN FIELD PRIOR TO ANY WORK AS DRAWING IS SHOWN DIAGRAMMATICALLY (� <br /> KT� WATER FLOOR PLAN ONLY. o O O 3 <br /> C .° 15 1/2" COLD WATER DOWN TO FREEZE PROOF WALL HYDRANT. QL. C) Q <br /> Q) <br /> �-o <br /> SCALE: 3/8" = 1'-0" <br /> 16 1/2" COLD WATER LINE TO YARD HYDRANT. VERIFY LOCATION IN FIELD. <br /> ISSUED FOR PERMIT: <br /> O N <br /> C � <br /> 02. 14.20 <br /> U U <br /> � N <br /> jO <br /> U <br /> U <br /> z 4) REV: DATE: DESCRIPTION: <br /> U) L <br /> La ❑ ■ ® 1 04.29.20 CITY COMMENTS <br /> a <br /> 0 <br /> 0) -0 <br /> o C <br /> ° <br /> U ° <br /> O L <br /> 0' <br /> 0 SHEET NAME: <br /> ° <br /> PLUMBING SUPPLY <br /> FLOOR PLAN AND <br /> o DETAILS <br /> m <br /> 0 0l • • SHEET NUMBER: <br /> Engineering Inc. <br /> P3 . 0 <br /> 0 fil 796 Merus Court T 636.349.1600 <br /> � W St.Louis,MO 63026 F 636.349.1730 <br /> 0 2019 DB Franchising USA, LLC <br />