Laserfiche WebLink
� GENERAL NOTES <br /> \ <br /> D\ 6 7 (J) <br /> z <br /> STORE GENERAL CONTRACTOR Lu <br /> I <br /> � 1 STORE GC TO WORK WITH FUEL GC ON <br /> SCHEDULING. ANY CONFLICTS SHALL BE0 H H H H W W <br /> BROUGHT TO THE ATTENTION OF THE SEI O W W W W W W <br /> PROJECT MANAGER. W_ Z Z <br /> 2 STORE ELECTRICAL CONTRACTOR TO RUN > Q Q <br /> W O O O O D U <br /> \ b Q r---- UNDERGROUND ELECTRICAL CONDUITS TO 10 FT 0 � U U U U <br /> Q F-------- OUTSIDE OF BUILDING SLAB (COORDINATE W } >_ } >- <br /> \ --J <br /> \ \ LOCATION, QUANTITY, SIZE AND TYPE OF CONDUIT W ~ _ _ _ W W <br /> WITH FUEL CONTRACTOR). a U U U 0 L LL <br /> \ \ <br /> N N N N N N N <br /> \ \ _ _ _ _ _ <br /> 3 STORE ELECTRICAL CONTRACTOR TO INSTALL - r- CD N Lo Lo <br /> SEAL-OFFS (AS REQUIRED), ELECTRICAL <br /> � r-- o o � � o N <br /> RACEWAYS, GUTTER BOXES, FUEL ELECTRICAL r` rn N <br /> \ \ PANELS, CIRCUIT BREAKERS AND FEEDERS. o 0 0 o 0 <br /> 4 STORE ELECTRICAL CONTRACTOR TO INSTALL > <br /> \ x x x x x EMIL xx x x- v ' n co <br /> OVERHEAD CONDUIT FOR VEEDER ROOT FROM (If <br /> ELECTRICAL ROOM TO LOCATION OF V/R ON <br /> b q o PLANS. Proto 11-05-18 <br /> 5 STORE GC RESPONSIBLE FOR ALL EXTERIOR <br /> \ AREA LIGHTING, IRRIGATION AND AIR/VACUUM <br /> UNIT SLAB AND POWER. <br /> ® 6 MONUMENT POLE SIGN TO BE PROVIDED AND co Z <br /> `\ r; Q r;,., • '' QINSTALLED BY SIGNAGE CONTRACTOR. THE SIGN 0 <br /> Q <br /> \�''. I I IS TO BE FUTURE MEDIA ELECTRONIC PRICE SIGN. ti ^J^ <br /> FUEL CONTRACTOR X C� <br /> I .. <br /> 1 FUEL GC TO WORK WITH STORE GC ON U <br /> SCHEDULING. ANY CONFLICTS SHALL BE z CD Q J <br /> \ I r <br /> 7-ELEVEN I I BROUGHT TO THE ATTENTION OF THE SEI _ Z < <br /> I I PROJECT MANAGER. > <br /> CONVENIENCE , i STORE CONTRACTOR RESPONSIBLE FOR ROUTING (29 z - W <br /> I I <br /> \ I I STORE I , 3/4"AND (3) 1" ROBROY PVC COATED GALVANIZED STEE 2 FUEL GC RESPONSIBLE FOR ALL CONCRETE OVER 0 <br /> z o I CONDUITS (WITH PULL STRING) FROM ELECTRICAL RO TANKS AND PRODUCT PIPING (I.E. TANK SLAB AND \w Q Q W <br /> �\ \ '•a.,-' I w z 1 I I r i TO (10) PAST BUILDING SLAB. FUELING CONTRACTOR T DRIVE MATS). CONCRETE CHAIRS ARE BY / O U <br /> \ \ I I I I ;. PICK UP CONDUITS AT THIS LOCATION AND ROUTE TO SEI. w = <br /> ` \ +:•' �, I i; i I a;, FINAL TERMINATION. FUELING CONTRACTOR J U <br /> 1 <br /> ° Ia;,_ i i �; i; RESPONSIBLE FOR PULLING WIRE AND MAKING FINAL 3 FUEL GC RESPONSIBLE FOR CANOPY FOOTINGS. w o <br /> . > <br /> ` ° ------------------------------------------------------- a.' r w ❑ I I ` TERMINATIONS. REF G16.0 FOR SPECIFICATIONS. I U) <br /> - I b O 1• 8 6 I I 4 FUEL GC TO INSTALL CANOPY DRAINS (WHERE 00 W W ti I <br /> Q <br /> TO POINT OF CONNECTION WITHIN Y <br /> APPLICABLE <br /> <o� ) U 1%- <br /> z <br /> \ 000 (10) FT OF DRIVE MATS. <br /> 000 <br /> Q _ <br /> o °°000°°°° 10' 0" ° 5 FUEL EC TO INSTALL ALL FUEL RELATED o W°o°o°o°o°o°o°oo°o°°oo°o°o°o°o°O000°o°o°o°0 C) <br /> `' `• :3••,'' 0000000000 00000 - <br /> \\ p 1 b Q ELECTRONICS (I.E. DATA BOXES, EDH UNIT, N <br /> ` o o O Q ° TURBINE RELAYS, ISOLATION RELAYS, ETC). ch <br /> \ v Q <br /> \`\ q O i i 6 FUEL GC RESPONSIBLE FOR ALL ELECTRICAL <br /> \ \ o r,.,, I I CONDUITS, SEAL-OFFS, ELECTRICAL J-BOXES PER <br /> STATE, LOCAL, MANUFACTURERS AND SEI CODES <br /> ,• I I o°o <br /> \ _ ❑ <br /> ` \ '•..... / ® IIi mao <br /> II <br /> 1 AND SPECIFICATIONS.CLEAN AIR <br /> VA V <br /> CLEAN 0 ' ` <br /> VANPOOLIEV..................__- 7 FUEL EC TO PULL WIRE <br /> FOR CANOPY LIGHTING, <br /> INTERCOM, DISPENSERS, TURBINES AND <br /> \ \ I c I 1 MONITORING SYSTEM DEVICES. <br /> \ \ I <br /> W ® <br /> 8 FUEL EC TO MAKE ALL FINAL CONNECTIONS TO <br /> ` I I FUELING EQUIPMENT AND ELECTRONICS. <br /> \ I I 100'-0" W <br /> \ \ \ I I 9 FUEL GC TO PULL TRADE PERMITS FOR FUELING <br /> I I <br /> \`\ \ 44'-1" i i 1 WORK(AS REQUIRED). W <br /> \\ \ 10 FUEL GC TO "CALL FOR"AND"BE PRESENT FOR" <br /> o ALL LOCAL REGULATOR INSPECTIONS AND <br /> RESPONSIBLE FOR SCHEDULING ON-SITE <br /> \ 10 10.03 INSPECTIONS WITH APPROPRIATE SEI <br /> - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - <br /> _ _ _ _ <br /> \ r _ REPRESENTATIVE RELATED TO FUELING. z <br /> \ 10.06 z <br /> \ \ I 10.25 10.09 10.02 I O W <br /> `\ 11 FUEL GC TO COORDINATE WITH TANKNOLOGY z <br /> 10.12 <br /> 9 2 I AND THE SEI CONSTRUCTION MANAGER FOR w <br /> 1 10.22 I I TESTING OF FUELING SYSTEM. a a <br /> ° ° C> o I wX 0 <br /> Z o <br /> \� 12 FUEL GC TO HAVE PERSONNEL ON SITE FOR Z a E <br /> 1 <br /> \\\ \ I I 1 TESTING. a <br /> i I Q o ° Q o °10.09 Q o °9.97 I I Lu w?J <br /> o0J g3 <br /> 10.20 13 FUEL GC RESPONSIBLE FOR CLOSE OUT PACKAGE Lu o <br /> o ° w10.37 PER 7-11 MATRIX. 3 <br /> m <br /> S Qb° 10.24 m <br /> - ---------- ------------ - - -----�� ## c7 <br /> I KEY NOTES <br /> TE S <br /> --------- ----- <br /> Lu <br /> 10.231❑ 7-ELEVEN CONVENIENCE STOREFrio <br /> I� <br /> \ \ Q <br /> 10.11 FUELING CANOPY AND DISPENSERS <br /> ` r <br /> 19'-4" I �3 UNDERGROUND FUEL STORAGE TANKS AND SLAB <br /> ~O 0 NO J <br /> 9 80 19'_2.. I.a;, ® FUEL STORAGE TANK VENTS O \ <br /> 7 4 I AIR-VAC MACHINE Q Z O <br /> C3 <br /> `\ <br /> \ Q ----------------------- ® 5 © (2) EMERGENCY <br /> ¢ <br /> 5-0" x x x x x x x x x x x x x x x x x x x x REF 2-G10.0 <br /> x x x x x x x m <br /> m <br /> '� �\ '' + � � � � � � � � � � � � 7❑ VAPOR POLISHER Qj � U <br /> \ \ ® VEEDER ROOT SITE MONITOR CONSOLE p U m <br /> \ \ I I (FIELD VERIFY) <br /> OVERFILL ALARM. REF 4-G6.0 _0 2 >,m o c c= m <br /> a) c <br /> co <br /> MONUMENT SIGN �N U O O L? ;Ln <br /> 0 7 <br /> N � ow PYLON SIGN � O2oca � o g ,O <br /> N \\ �` \ I I QCT ° <br /> Q o a a) _= <br /> c a).9 E <br /> \ 4 X-0 O (6 C O U <br /> TOTAL PIPING LENGTH - STORE (41216) LONGEST PIPING RUN - STORE (41216) TANK BURIAL CHART- STORE (41216) 7 6 c 0 a> can � m °v; o-0 E <br /> \ \ � C-c �a•o> �-0 u,'iw� O <br /> PRODUCT G PRODUCT T COMPONENT DIESEL s VAPOR VENT E•° L.o- a� °.N m.j - <br /> \� REGULAR 242' DISPENSER 1 PREMIUM 155' A. FINISH GRADE ELEV. AT BEGINNING OF RUN (FT): 9.97 9.97 9.80 0 am >,Q- Q m o Y a 0 a> <br /> �\ PREMIUM 252' DISPENSER 2 DIESEL 164' B. PIPE BURY (FT): 1.50 1.50 2.00 p 0 `2 0 o -(D-- <br /> s <br /> cu E <br /> DIESEL 172' DISPENSER 3 PREMIUM 108' C. ELEVATION OF PIPE AT BEGINNING OF RUN (A-B) 8.47 8.47 7.80 <br /> CD <br /> \ 6 DISPENSER 4 PREMIUM 108' D. PIPE LENGTH (LONGEST RUN) (FT): 164 157 53 (toFESS/ <br /> DISPENSER 5 PREMIUM 60' E. PIPING RUN FALL (FT) (D*1/8" PER FT): 1.71 1.64 0.55 <br /> 11J �\ \ DISPENSER 6 DIESEL 71 F. TOTAL CROSSOVERS/SWING JOINTS: 1 1 0 <br /> cn <br /> \ 7 6 G. CROSSOVER/SWING JOINT DEPTH (FT): 1.00 1.00 0.00 a 35558 <br /> Of <br /> H. ELEVATION AT END OF PIPE (FT) (C-E-G): 5.76 5.83 7.25 <br /> Alt <br /> LLJ <br /> \ I. ADD FOR EXTRACTOR TEE AT SUMP: 1.00 1.00 1.50 <br /> J. TOP TANK ELEVATION (FT) (H-1): 4.76 4.83 5.75 N FCHAN\C' <br /> Q F OF CA��FO <br /> K. HIGHEST FINISH GRADE ELEVATION AT TANK SLAB (FT): 10.37 10.37 10.37 <br /> L. MAX BURY DEPTH (K-J) (FT): MAX = 5.67' 5.61 5.54 4.62 01/26/21 <br /> A R C H I T E C T U R A SITE P A N M. LOWEST FINISH GRADE ELEVATION AT TANKS (FT): 10.03 10.03 10.03 SHEET: <br /> N N. I Y H - F = 5.27 5.20 4.28 <br /> � M 1 <br /> 5-: <br /> z TANK BURIAL DEPTH IS GOVERNED BY THE DIESEL PRODUCT PIPING AT DISPENSER 2. <br /> z ¢ G0 . 1 <br /> THE TOP OF TANKS SHALL BE SET AT-4.761 <br /> . <br /> FUELING - USA CA <br />