My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
770
>
2300 - Underground Storage Tank Program
>
PR0546068
>
INSTALL_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2022 2:08:12 PM
Creation date
1/4/2021 11:08:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2021
RECORD_ID
PR0546068
PE
2351
FACILITY_ID
FA0026052
FACILITY_NAME
7-ELEVEN STORE #41216
STREET_NUMBER
770
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16323023
CURRENT_STATUS
01
SITE_LOCATION
770 W CHARTER WAY
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A 4 GENERAL NOTES <br /> 33'-1" O.T.O. TANK SLAB <br /> U) <br /> 32'-2" <br /> (MIN BOUNDARY TOP OF EXCAVATION) 1 ALL CONSTRUCTION SHALL MEET COUNTY W <br /> 28-2 STANDARDS. CONTRACTOR TO SECURE ENTIRE <br /> (MIN BOUNDARY BTM OF EXCAVATION) CONSTRUCTION AREA WITH CHAIN LINK <br /> o FENCING DURING CONSTRUCTION PERIOD. 0 H H H H W W <br /> O �:fW W W W O O <br /> Lu Lu <br /> C7 2 THE CONTRACTOR SHALL IMMEDIATELY NOTIFY LU z z <br /> - - - - - - - - - - - - - - - - - I ENGINEER OF ANY DIFFERENCES BETWEEN THE j a a <br /> B1 I I ACTUAL FIELD CONDITIONS AND THE PLANS °) Lu 0 0 0 0 <br /> 18 BEFORE PROCEEDING WITH CONSTRUCTION. U U U U 0 0 <br /> LU >- >- >- >- J J <br /> FTI 72 3 FUEL CONTRACTOR SHALL BE RESPONSIBLE W ~ � � W W <br /> FOR THE INTEGRITY OF THE PIPING SYSTEM D_ U U U U IL LL <br /> DURING CANOPY ERECTION AND CONCRETE o 0 0 0 0 <br /> FLATWORK INSTALLATION. CV CV CV N N CV CV <br /> �- i co N Un <br /> CU 0 0 o cel <br /> z z I I 4 AFTER COMPLETING INSTALLATION OF r` rn N <br /> O O 3-�3 1 I I 40 DISPENSERS, THE FUEL CONTRACTOR IS TO 0 0 0 0 0 <br /> Q Q I I I I INSTALL BRIGHT ORANGE CONSTRUCTION aaaaaaa <br /> 19 20 FENCE AROUND ENTIRE DISPENSER. > N <br /> Q w w <br /> W u- 28 DSL 5 FUEL CONTRACTOR IS TO BE AWARE THAT ON <br /> Y O O I I I I THE DAY THE GASOLINE SYSTEM IS PUT INTO Proto 11-05-18 <br /> z O ED <br /> I 56 SERVICE, THE FUEL CONTRACTOR AND A <br /> p } I I I 41 GILBARCO AUTHORIZED SERVICE CONTRACTOR <br /> MUST BE ON SITE ONE (1) HOUR PRIOR TO <br /> 0 o o I I I I 1g 2p STARTUP AND MUST REMAIN ON SITE THREE (3) <br /> z z I I I ADDITIONAL HOURS FOR A TOTAL OF FOUR (4) co <br /> O O I I I I I HOURS. ANY COSTS INCURRED OVER FOUR(4) cfl <br /> "N co co <br /> ' z z I I 26 RUL HOURS DUE TO FUELING SYSTEM ISSUES, <br /> SHOULD BE BILLED AS A CHANGE ORDER. Lo z <br /> ti Q <br /> U) <br /> 42 J <br /> 36" MIN N N I I I I a <br /> TYPICAL 1 2 00 � I I ®0 27 PUL w Y <br /> 2 <br /> 0 43 b z <br /> 3 <br /> 4 a d a ° ° ° a d ° ° ° o d a s ° I I I I ` z <br /> ` ° ° ° ° I I I I ## KEY NOTES L <br /> ° ° ° a < d ° a° ° d ° a °a ° ° v \ <br /> °44 I I I I � /� <br /> a < a ° ° d ° ° d a d °O da °a <br /> 0 Q <br /> Z w z <br /> PEA GRAVEL BACKFILL TYP I I B1 I w o � <br /> / " Q <br /> (OR APPROVED ALTERNATE) I I L I I 18 0 2 0 <br /> _ _ _ _ _ _ _ - - - - - - - J I 1� 6"CONCRETE SLAB AT FUELING CANOPY. Z <br /> 02 <br /> (y) REF GO.1 AND CIVIL DRAWINGS FOR TOS W 0 U <br /> � - - - - - - - - - - - - - - - - - � ELEVATIONS. J o <br /> 03 ADD 10 INCHES OF WIDTH <br /> TO PIPING TRENCH FOR r <br /> EACH ADDITIONAL PIPE T <br /> 01 �2 GEOTECH FABRIC MATERIAL TO EXTEND 36" I W W U)f� (D PAST EACH SIDE OF PIPING TRENCH. ALL 00 Z <br /> 02 GEOTECH FABRIC SHALL BE PINNED PRIOR TO Y <br /> z Q NOTE: NOTE: <br /> REFERENCE FUEL PIPING FOR REINFORCING AT TANK BACKFILLING. METHOD OF PINNING FABRIC AT a ~ LL] <br /> � <br /> 0 PLAN FOR ORIENTATION OF SLAB PENETRATIONS AND 8"TANK SLAB 6"CAN SLAB TOP OF EXCAVATION TO BE APPROVED BY THE _ <br /> � <br /> 7-ELEVEN CONSTRUCTION MANAGER. <br /> TANKS CORNERS REF 6-G6.1 Co <br /> 10" 10 "101„2 ❑3 PIPING TRENCHES SHALL BE DUG IN SUCH A ch <br /> MANNER THAT THE TRENCH WIDTH IS EQUAL TO <br /> AT LEAST TWICE WIDTH OF ALL PIPING <br /> (4 PIPE)48 WIDE TRENCH 2 <br /> 1/8"-1'-0" CONTAINED WITHIN. MAINTAIN A MINIMUM OF 4" <br /> (3 PIPE)36"WIDE TRENCH (10cm) CLEAR DISTANCE BETWEEN PIPING <br /> POSITIONED IN THE TRENCH AND 6"WHERE <br /> (2 PIPE)26"WIDE TRENCH PIPING CROSSES OVER EACH OTHER. THE <br /> BOTTOM OF THE TRENCH SHALL BE AS <br /> 16"WIDE TRENCH UNIFORM AS POSSIBLE TO ELIMINATE HIGH <br /> (1 PIPE) D SPOTS AND ENSURING AN EVEN LAYER OF <br /> BEDDING MATERIAL UNDER THE PIPE. REMOVE W <br /> ALL SHARP ROCKS AND DEBRIS FROM THE <br /> PRODUCT / VENT PIPING TRENCH BOTTOM BEFORE BEDDING MATERIAL <br /> P PING TRENCH SECT 0 N IS INSTALLED. <br /> 1"- ❑ CONDITIONS <br /> WHICHMUDVARIATIONS <br /> ST BE APPROVED BY 7-ELEVEN AND <br /> 6 7 MANUFACTURER. PIPING BURIAL DEPTHS LESS <br /> THAN 18" REQUIRES 7-ELEVEN APPROVAL. <br /> Z <br /> O Z <br /> Lu <br /> W <br /> W <br /> z <br /> - Z � o <br /> W r U <br /> CL X <br /> W X <br /> Z � uj~ o <br /> n N <br /> z_ <.E <br /> J <br /> TANK#3 uia W o3 <br /> TANK#1 STP SUMP (RUL) 10 FT DIA J20 J19 J17 D Z o <br /> REF 4-G6.1 AND 1-G4.0 12,000 GAL REF 1-G5.0 0 0 0 <br /> J20 J19 J17 Lu <br /> Q M <br /> DIESEL O !G� REF 1-G5.0 O Off' J20 J19 J17 O �OCANOPY COLUMN TYPICAL v o <br /> INTERSTITIAL MONITOR REF 2-G3.0 ��O 5� 0 W Q w <N <br /> REF 5-G6.1 AND 4-G3.0 0O °O REF 1-G5.0 °O REF SHEET G8.0 AND Of <br /> TANK#3 STP SUMP (DIESEL)--- 10 0 6 0 2 ° CANOPY MFR DRAWINGS ~ v o~ <br /> REF 4-G6.1 AND 2-G4.0 o o o <br /> DISP 5 / DISP 3 DISP 1 FrioQ <br /> TANK#3 DIESEL FILL SUMP ° 3" OVER 2" DBL-WALL o 0 <br /> q� 3" OVER 2" DBL-WALL a <br /> 0 <br /> REF 4-G6.1 AND 2-G4.1 FIBERGLASS <br /> FIBERGLASS PRODUCT VAPOR PIPING - SLOPE 1/8" <br /> PIPING -SLOPE 1/8" PER PER FOOT MIN. TRANSITION <br /> FOOT MIN 3"X 2" REDUCER f` Q O (D _ <br /> BUSHING (6 LOC) TO 4" OVER 3"AT TRUNK LINE O LLI N 0 J <br /> TANK <br /> #1 1 1 REF 5-G5.0 1 1 O Z <br /> 10 ~ <br /> 20,000 GAL 0 �'\ o 1 o Q z co <br /> �® REGULAR 11 C�; J20 J19 J17 O 5�1 J20 J19 J17 O 5�0� J20 J19 J17 (n <br /> 1 UNLEADED 0 0 REF 1-G5.0 0 REF 1-G5.0 Q m <br /> REF 1-G3.0 12 0° REF 1-G5.0 8 4 0° m -0 <br /> o 011 N <br /> TANK#1 FILL/VAPOR SUMP (RUL)------ �DISP 6 �DISP 4 �DISP 2 <br /> REF 4-G6.1 AND 1-G4.1 0 0011\ 0 U <br /> TANK#2 STP SUMP (PUL) U) U <br /> REF 4-G6.1 AND 1-G4.0 HO TYP <br /> vi <br /> - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - REF 2-G6.0 m� 0° �m o �'� U) <br /> N TANK#2 FILL/VAPOR SUMP (PUL) - - �- - - - - - - - - - - - - _ _- - - - - - - - - - - - - - - - - - - _ _ _ _ _ _ _ _ _ _ _ _ _ - - - - - - - - � � Ccav0imui � o� LQo <br /> REF 4-G6.1 AND 1-G4.1 <br /> �0 - I - - - - - ��oc � aip� ao� �- <br /> 0 0 0 E L a) =3 L <br /> cv QL O O N U <br /> I L <br /> O O U'- N > •O <br /> N O ° O ° i 7 a i X-0 0 0 (6 •� <br /> � L0' �� a� E <br /> I 0 TEE IS SET AT 90° ELBOW IS SET AT C a � �, _ : Fu <br /> U <br /> O 1 O Q� a) u � C C.9�,Q m <br /> Q 45 ANGLE, TYP 45 ANGLE, TYP Q O � �, E- <br /> O L U �,O N cn•-H <br /> Q INTERSTITIAL MONITOR E'v, -U 0- U'-_ " <br /> c O E <br /> o <br /> TANK#2 � 2 0Q � c� mU <br /> REF 5-G6.1 AND 4-G3 " m > "� m Q a o U) <br /> z I 10 FT DIA 4" OVER 3 DBL-WALL ° o c t = O� -- <br /> FLOWRATE FLOW RATE � Ec �0L -a)=1 `D <br /> � 8,000 GAL FIBERGLASS MAIN TRUNK 0 0 cn o L N <br /> (RUL AND PUL) (DSL) _ O 3:(D <br /> PREMIUM LINE VAPOR PIPING- <br /> UNLEADED SLOPE 1/8" PER FOOT MIN 1-6 NOZZLES - 10 GPM 1-4 NOZZLES - 10 GPM <br /> � <br /> SIM REF 2-G3.0 QROFESS/ <br /> l _ <br /> 3-G1.0 3"OVER 2" DBL-WALL FIBERGLASS NOTE: ? <br /> z 8 NOZZLES - 9.8 GPM <br /> Y VENT PIPING-SLOPE FROM 10 NOZZLES - 8.5 GPM REF 1-G6.1 FOR DIMENSIONS AND <br /> c3 m <br /> REMOTE VENT DOWN TO TANKS LOCATIONS OF DISPENSERS. a 35558 ;o <br /> 0 1/8" PER FOOT MIN <br /> 12 NOZZLES - 7.5 GPM <br /> 11 <br /> 1cl- <br /> 0 0o VAPOR POLISHER c-D �9�OCF HA CALF <br /> )I REF 1-G6.0 <br /> z <br /> Uj <br /> G6.0 <br /> o <br /> 01/26/21 <br /> U W <br /> � UE � P P NG PIAN G1 . 0 <br /> LLj <br /> FUELING - USA CA <br />
The URL can be used to link to this page
Your browser does not support the video tag.