Laserfiche WebLink
U) <br /> H <br /> Z <br /> W <br /> 0 C/) <br /> o <br /> _ U <br /> z z <br /> Q LU <br /> � LUO O <br /> U U <br /> LU <br /> U-1 <br /> 11 U U <br /> 0 0 0 <br /> CN CN N <br /> STATE OF CALIFORNIA STATE OF CALIFORNIA STATE OF CALIFORNIA STATE OF CALIFORNIA I1_ C0 N <br /> 0 O <br /> Outdoor Lighting Outdoor Lighting Outdoor Lighting Outdoor Lighting <br /> NRCC-LTO-E CALIFORNIA ENERGY COMMISSION NRCCATO F CALIFORNIA ENERGY COMMISSION NRCC-LTO-E CALIFORNIA ENERGI'COMMISSION NRCC-LTO-E CALIFORNIA ENERGY COMMISSION CD CD CD <br /> CERTIFICATE OF COMPLIANCE NRCC-LTO-E CERTIFICATE OF COMPLIANCE NRCC-LTO-E ICERTIFICATE OF COMPLIANCE NRCC-LTO-E CERTIFICATE OF COMPLIANCE NRCC-LTO-E <br /> Project Name: 7-ELEVEN Report Page: (Page 1 of 7) Project Name: 7-ELEVEN Report Page: (Page 2 of 7) 113roject Name: 7-ELEVEN Report Page: (Page 3 of 7) Project Name: 7-ELEVEN Report Page: (Page 4 of 7) <br /> Project Address: 770 W CHARTER WAY I Date Prepared: 10/16/2020 Project Address: 7170 W CHARTER WAY Date Prepared: 10/16/2020 lProject Address: 770 W CHARTER WAY Date Prepared: 10/16/2020 Project Address: 770 W CHARTER WAY Date Prepared: 10/16/2020 N a a a <br /> IY <br /> A.GENERAL INFORMATION C.COMPLIANCE RESULTS F.OUTDOOR LIGHTING FIXTURE SCHEDULE H.OUTDOOR LIGHTING CONTROLS <br /> 01 Project Location cit STOCKTON <br /> Prato 11-05-18 <br /> 1 (city) <br /> z For new or altered lighting systems demonstrating compliance with 140.7 all new luminaires being installed and an existing luminaires remaining or being moved within the spaces 04 Total Illuminated Hardscape Area(ft) o Results in this table are automatically calculated from data input and calculations in Tables F through I.Note:If any cell on this table says"COMPLIES with Exceptional Conditions g g y g p � g y g g g p This table demonstrates compliance with controls requirements for all new or altered luminaires installed as part of the permit application.For alteration projects,luminaires which are <br /> 02 Climate Zone 112 to Table D.Exceptional Conditions for guidance or see applicable Table referenced below. covered by the permit application are included in the Table below.For altered lighting systems using the Existing Power method per§141.0(b)2L only new luminaires being installed and existing to remain(ie untouched)and luminaires which are removed and reinstalled(wiring only)do not need to be included in this table even if they are within the spaces covered by <br /> 03 Outdoor Lighting Zone per Title 24 Part 1 10.114 or as designated by Authority Having Jurisdiction(AHJ): Calculations of Total Allowed Lighting Power(Watts) 140.7 or§341.0(b)2L Compliance Results replacement luminaires being installed as part of the project scope are included(ie,existing luminaires remaining or existing luminaires being moved are not included). the permit application. <br /> ❑ LZ-0:Very Low-Undeveloped Parkland ❑ LZ-2:Moderate-Rural Areas ❑ LZ-4:High-Must be reviewed by CA Energy Commission for Approval 01 02 03 04 OS 06 07 0g pg Designed Wattage: When an option having a*is selected,the notes section of this table must be completed.The lighting controls section of the Compliance Summary Table on the first page will show <br /> ❑ LZ-1:Low-Developed Parkland ® LZ-3:Moderate' High-Urban Areas 01 02 03 04 05 06 07 08 09 10 "DOES NOT COMPLY"if the notes are left blank. <br /> P Y g General Existing <br /> Per Sales Per Specific Mandatory Controls <br /> Hardscape Ornamental Power _ Cutoff Req.> Field <br /> + Application + Frontage + + Area OR - Total Allowed ? Total Actual How is 01 02 03 04 OS <br /> >- <br /> B.PROJECT SCOPE Allowance §140.7(d)2 Allowance 07 must be -08 Watts er Total number Luminaire 6 200 initial <br /> _ Name or Item p Excluded per Inspector (� <br /> §140.7(d)1 §140.7(d12 §140.7(d12 §140.71d12 (Watts) (Watts) Complete Luminaire Description Wattage 3 Design Watts <br /> This table includes outdoor lighting systems that are within the scope o the permit application and are demonstratingcompliance using the prescriptive path outlined in 140.7 or (See Table L) §141.0(b)2L Tag luminaire luminaires Status 140.7 a lumen output CD <br /> g g y P f P pp P g P P (See Table I) (See Table J) (See Table K) (See Table M) (See Table N) 3 d r 'ne 2 Shut-Off Auto-Schedule Motion Sensor Field Inspector O <br /> §141.OjI for alterations. Area Description 130.2 c 1 4130.2(c)2 §130.2(c)3 ti <br /> 0 + + + + 1,728 OR --- = 1,728 > 1,728 COMPLIES <br /> My Project Consists of: MI5 96w LED El Linear 96 CEC Default 18 New E] NA:<6200 1,728 ❑ 1:1 Pass Fail <br /> Cutoff Compliance(See Table G for Details) N/A lumens <br /> 3 02 *NOTES:Controls with a*require a note in the space below explaining how compliance is achieved. <br /> ® New Lighting System Must Comply with Allowances from JLtO.7 Controls Compliance(See Table H for Details) COMPLIES EX:Not permitted by health&safety to be turned off,EXCEPTION 1 to 1139.2c Q '^ <br /> 0 Altered Lighting System Is your alteration increasing the connected lighting load(Watts)? • Yes 0 No *NOTES:Selections with a*require a note in the space below explaining how compliance is achieved. X moi•/ 2 <br /> 04 OS <br /> D.EXCEPTIONAL CONDITIONS EX:Luminaire is lighting a statue;EXCEPTION 2 to 130.2 6 (p �) LU <br /> 1.LIGHTING POWER ALLOWANCE er 140.7 r , � <br /> This table is auto filled with uneditable comments because of selections made or data entered in tables throughout the form. 'FOOTNOTES:Authority Having Jurisdiction may ask for Luminaire cut sheets to confirm wattage used for compliance per 4130.00 v <br /> %of Existing Luminaires Being Altered' Sum Total of Luminaires Being Added or Altered Calculation Method 2 For linear luminaires,wattage should be indicated as W/If instead of Watts/luminaire.Total linearfeet should be indicated in column 05 instead of number of luminaires. This table includes areas using allowance calculations per 140.7.General Hardscape 01 Ur Q <br /> 00 % % 3 Select"New"or new luminaires in a new outdoor lighting f P g Allowance is per Table 140.7-A while"Use it or lose it"Allowances are per Table 140.7-B. ( ( z z <br /> ❑ <10/ ❑ >=10%and<50/ ❑ >=50/ f g g project,or or added luminaires in an alteration.Select"Altered"for replacement luminaires in an alteration.Select"Existing to Remain' EI General "Use it or lose it"Allowance select all that apply) select all that apply) <br /> E.ADDITIONAL REMARKS Indicate which allowances are being used to expand sections for user input.Luminaires for existing luminaires within the project scope that are not being altered and are remaining.Select"Existing Reinstalled"for existing luminaires which are being removed and reinstalled as part of Hardscape ❑per ®Per Specific <br /> Please proceed to Table F.Outdoor Lighting Fixture Schedule to define the project's luminaires. This table includes remarks made b the permit applicant to the Authority Having Jurisdiction. the project scope. that qualify for one of the"Use it or lose it"allowances shall not qualify for another"Use ❑Sales Frontage ❑Ornamental ,� <br /> Y p pp y g p l P Allowance Application Area <br /> 'FOOTNOTES:%of Existing Luminaires Being Altered=(Sum Total of Luminaires Being Added or Altered/Existing Luminaires within the Scope of the Permit Application)x 100. 'Compliance with mandatory cutoff requirements is required for luminaires with initial lumen output>=6200, unless exempted by 4130.2(b) it or lose it"allowance. Table I(below) Table J Table K Table L Table M z L N <br /> Calculated General Hardscape Lighting Power Allowance per Table 140.7-A(LZ 0,1&4) <br /> G.CUTOFF REQUIREMENTS(BUG) w q lcl� - W <br /> This section does not apply to this project. <br /> This section does not apply to this project. > O Q J <br /> Calculated General Hardscape Lighting Power Allowance per Table 140.7-A(LZ 2&3) <br /> This section does not apply to this project. w iY U <br /> J.LIGHTING ALLOWANCE:PER APPLICATION <br /> �J O <br /> This section does not apply to this project. I w UJ II <br /> K.LIGHTING ALLOWANCE:SALES FRONTAGE Y <br /> This section does not apply to this project. Q <br /> Registration Number: Registration Date/Time: Registration Provider:Energysoft Registration Number: Registration Date/Time: Registration Provider:Energysoft Registration Number: Registration Date/Time: Registration Provider:Energysoft Registration Number: Registration Date/Time: Registration Provider:Energysoft O <br /> CA Building Energy Efficiency Standards-2019 Nonresidential Compliance Report Version:2019.0.001 Report Generated:2020-10-16 07:48:07 CA Building Energy Efficiency Standards-2019 Nonresidential Compliance Report Version:2019.0.001 Report Generated:2020-10-16 07:48:07 CA Building Energy Efficiency Standards-2019 Nonresidential Compliance Report Version:2019.0.001 Report Generated:2020-10-16 07:48:07 CA Building Energy Efficiency Standards-2019 Nonresidential Compliance Report Version:2019.0.001 Report Generated:2020-10-16 07:48:07 <br /> O <br /> NI <br /> Schema Version:rev 20190401 Schema Version:rev 20190401 Schema Version:rev 20190401 Schema Version:rev 20190401 co <br /> STATE OF CALIFORNIA STATE OF CALIFORNIA STATE OF CALIFORNIA <br /> Outdoor Lighting Outdoor Lighting Outdoor Lighting <br /> NRCC-LTO-E CALIFORNIA ENERGY COMMISSION NRCC-LTO-E CALIFORNIA ENERGY COMMISSION NRCC-LTO-E CALIFORNIA ENERGY COMMISSION <br /> CERTIFICATE OF COMPLIANCE NRCC-LTO-El CERTIFICATE OF COMPLIANCE NRCC-LTO-E CERTIFICATE OF COMPLIANCE NRCC-LTO-E <br /> Project Name: 7-ELEVEN Report Page: (Page 5 of7) Project Name: 7-ELEVEN Report Page: (Page 6 of 7) Project Name: 7-ELEVEN Report Page: (Page 7 of 7) <br /> Project Address: 770 W CHARTER WAY Date Prepared: 10/16/2020 Project Address: 770 W CHARTER WAY Date Prepared: 10/16/2020 1 Project Address: 770 W CHARTER WAY Date Prepared: 10/16/2020 <br /> L.LIGHTING ALLOWANCE:ORNAMENTAL P.DECLARATION OF REQUIRED CERTIFICATES OF ACCEPTANCE DOCUMENTATION AUTHOR'S DECLARATION STATEMENT <br /> This section does not apply to this project. Selections have been made based on information provided in this document.If any selection have been changed by permit applicant an explanation should be included in Table E. I certify that this Certificate of Compliance documentation is accurate and complete. rNm <br /> Additional Remarks.These documents must be provided to the building inspector during construction and must be completed through an Acceptance Test Technician Certification Documentation Author Name: AFSAR HASAN Documentation Author Signature:M.LIGHTING ALLOWANCE:PER SPECIFIC AREA Provider(ATTCP).For more information visit:http://www.energy.ca.gov/title24/attcp/providers.html Company: signature Date: <br /> Field Inspector The Dimension Group(Dallas) 10/16/2020This table includes areas using the wattage allowance perspecific areafrom Table 140.7-B.More than one specific area allowance maybe taken in a single project ifapplicable. Yes No Form/Title PEI <br /> Howevermultiple specific area allowances may not betaken for the exact same area on thesite. Pass Fail Address: 10755 SANDHILL RD CEA/HERS Certification Identification(if applicable):01 02 03 04 05 06 07 08 09 10 • NRCA-LTO-02-A-Must be submitted for all outdoor lighting controls except for alterations where controls are added to<=20 ❑ ❑ city/state/zip: DALLAS,TX 75238 Phone: 214-343-9400 <br /> CALCULATED ALLOWANCE(Watts) DESIGN WATTS luminaires. RESPONSIBLE PERSON'S DECLARATION STATEMENTAdditional I certify the following under penalty of perjury,under the laws of the State of California: <br /> Specific Area Type per Table Allowed Extra Luminaire 1. The information provided on this Certificate of Compliance is true and correct. <br /> Area Description Specific Area Watts per #of Allowance <br /> 140.7-B Density Allowance Name Or Design Watts 3 2. 1 am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance(responsible designer) <br /> (ftz)1 z Luminaire Luminaires (Watts) <br /> (W/ft) (Watts) Item Tag 3. The energy features and performance specifications,materials,components,and manufactured devices for the building design or system design identified on this Certificate of Compliance conform to the requirements <br /> of Title 24,Part 1 and Part 6 of the California Code of Regulations. <br /> CANOPY LIGHTING Service5tationCanopy 4752 0.58 2756.16 MI5 96 18 1,728 1728 4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents,worksheets,calculations, <br /> plans and specifications submitted to the enforcement agency for approval with this building permit application. <br /> 5. 1 will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s)issued for the building,and made available to the enforcement agency for all applicable <br /> Total Design Watts for this Area:1 1728 inspections.I understand that a completed signed copy of this Certificate of Compliance is required to be included with the documentation the builder provides to the building owner at occupancy. <br /> C7 <br /> Total Allowance(Watts)All Areas: 1728 Responsible Designer Name: Responsible Designer Signature: <br /> t AFSAR HASAN <br /> FOOTNOTES:See Table 140.7-8 for rules for calculating the specific areas(ftz for these additional lighting allowances. w <br /> 2 <br /> Company: Date Si Signed: W <br /> For luminaires indicated in Table F as linear,wattage in column 07 is W/If instead of Watts/luminaire.Total linear feet should be indicated in column 08 instead of number of luminaires. g Z_ m <br /> THE DIMENSION GROUP 2020-10-16 <br /> (7 N E <br /> N.EXISTING CONDITIONS POWER ALLOWANCE(alterations only) Address: License: W q <br /> 10755 SANDHILL RD 20749 w U) 2 <br /> This section does not apply to this project. w o <br /> City/State/Zip: Phone: W w <br /> DALLAS TX 75238 214-343-9400 CO <br /> O.DECLARATION OF REQUIRED CERTIFICATES OF INSTALLATION <br /> _ E <br /> Selections have been made based on information provided in this document.If any selection have been changed by permit applicant,an explanation should be included in Table E. d Lu a <br /> Additional Remarks.These documents must be provided to the building inspector during construction and can be found online at W o <br /> 11 <br /> https://www.energy.ca.govltitle2412019standards/2019 compliance_documents/Nonresidential Documents/NRCl/ Z 00 <br /> Field Inspector m <br /> Yes No Form/Title O J M <br /> Pass Fail U o M <br /> • O NRCI-LTO-01-E-Must be submitted for all buildings ❑ ❑ Lu (Z Z <br /> W Q N <br /> • O NRCI-LTO-02-E-Must be submitted for a lighting control system,or for an Energy Management Control System(EMCS),to be ❑ ❑ F Q UI w <br /> recognized for compliance. U o <br /> �LU <br /> Lu <br /> H <br /> 3 <br /> U <br /> Registration Number: Registration Date/Time: Registration Provider:Energysoft Registration Number: Registration Date/Time: Registration Provider:Energysoft Registration Number: Registration Date/Time: Registration Provider:EnergysoftX <br /> Am Q <br /> CA Building Energy Efficiency Standards-2019 Nonresidential Compliance Report Version:2019.0.001 Report Generated:2020-10-16 07:48:07 CA Building Energy Efficiency Standards-2019 Nonresidential Compliance Report Version:2019.0.001 Report Generated:2020-10-16 07:48:07 CA Building Energy Efficiency Standards-2019 Nonresidential Compliance Report Version:2019.0.001 Report Generated:2020-10-16 07:48:07 <br /> Schema Version:rev 20190401 Schema Version:rev 20190401 Schema Version:rev 20190401 <br /> ti o o _ <br /> N <br /> �, a <br /> N 1- (0 <br /> I <br /> Q O <br /> Z M <br /> 0 <br /> Q m <br /> m � <br /> N <br /> C: __Ie <br /> � U <br /> 0 U (TS <br /> 0 -0 c = <br /> DMM0M � � oLCL <br /> a� <br /> V L a) (J) L US 0 <br /> -0 O a) 0 0 0-E L a) 7 s_ <br /> L >_ X.- O L rrt <br /> 00- 00000-0-C 0 0 O 0 N <br /> m L) C: 0.��= ?� NU) (6 <br /> a) 0-U �- Z3 � cOU <br /> L � a) S. X-C O 0 6 M._ <br /> 0-00 a) -=� a).0 �E N <br /> (� U' c 0 m C-0 m� <br /> ami c� Z3 ca 0 <br /> U) O 0- <br /> QC 0_tL: 0_- <br /> �o D C 0-� N.� 01 mL <br /> ` M <br /> c.l Q 0 u) 0:S �� 0� L <br /> cV <br /> C3 <br /> O <br /> W <br /> Q <br /> D <br /> Z <br /> 0- <br /> CD C7 <br /> N <br /> W <br /> 01/26/21 <br /> CV <br /> SHEET: 0 <br /> of <br /> U W <br /> Q <br /> p� Z <br /> = C7 G9 . 2 <br /> W Z <br /> Z <br /> FUELING - USA CA <br />