Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMPIUDC TEST <br /> Test Method Developed by Manufacturer ✓ Industry Standard Professional Engineer <br /> Test Type Pressure Vacuum ✓ Hydrostatic <br /> Test Equipment Used:Zncon TS-STS console <br /> Sump/UDC IID uac 7/8 unc 9/10 <br /> Sump Manufacturer Bravo Bravo <br /> Sump Depth (inches) 26" 26" <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration 16" 18" <br /> (inches) <br /> Test Start Time 10:30am 10:30am <br /> Initial Reading 2.3184" 0.4799" <br /> Test End Time 10:45am 10:45am <br /> Final Reading 2.3184" 0.4476" <br /> Change in Reading 0° 0.0323" <br /> Pass/Fail Criteria 0.002" 0.002" <br /> Tightness Test Results `/ Pas Fail Pass ✓ Fail Pas FailIL]Pass[]-Fa—il <br /> Sump/UDC ID <br /> Sump Manufacturer <br /> Sump Depth (inches) <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results Pass Fail Pass Fail Pass Fail Pass Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section, <br /> Page 3 of 5 <br />