Laserfiche WebLink
SANJOANIN Environmental Health Department <br /> C O U N T Y Time In: <br /> Time Out: <br /> r'eatAess 9rpv,-. )1 c,-!- <br /> Underground Storage Tank Program Service Request Inspection Report <br /> Name of Facility: ARCO 07147 Date: 01/11/2021 <br /> Address: 1206 E MARCH LN , STOCKTON 95210 <br /> Requestor: CE THOMAS COMPANY INC, CE THOMAS COMPANY INC Telephone: (310) 323-6730 <br /> Program Element: 2308- UST RETROFIT Request#: SR0083067 <br /> Inspection Type: 298- UST RETROFIT REPAIR INSPECTION <br /> Onsite Service Technician: Mathew ICC Service Tech/Installer Exp. Date: 04/08/2021 <br /> Manufacturer training: INCON, 02/14/21 <br /> OVERALL INSPECTION NOTES AND COMMENTS <br /> NOTES <br /> On site for the following Inspection: <br /> -Witnessed secondary containment testing of the UDC containment sump <br /> UDC 9/10- Passed <br /> This facility is approve to operate the UDC 9/10 <br /> *This facility is required to provide another secondary containment testing of UDCs 7/8 and 9/10 six months after installation. <br /> Provide 48 hpurs notification to the EHD when this test is scheduled. Refer to approval letter dated December 29, 2020. <br /> To minimize person to person contact EHD is choosing to write the name of person receiving the report instead of having them <br /> sign. <br /> The person in charge is responsible for ensuring that the above mentioned facility is in compliance with all applicable sections of the California Health and <br /> Safety Code. If a reinspection is required,fees will be assessed at the current hourly rate. <br /> Received by: Name and Title: E Mailed to Robert Velasco,Agent/Ci <br /> EH Specialist: PAUL NSO Phone: (209) 616-3049 <br /> FA0001247 SR0083067 SC298 01/11/2021 <br /> EHD 23-01 Rev.09/16/2020 Page 1 of 1 Underground Storage Tank Program Service Request Inspection Report <br />