Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> Additional copies of this page may be attached. <br /> 8. SUMP/UDC TEST <br /> Test Method Developed by ® Manufacturer ® Industry Standard ❑ Professional <br /> Engineer <br /> Test Type ❑ Pressure ❑ Vacuum ® Hydrostatic <br /> Test Equipment Used: F.F.S. Incon TS-STS Sump Tester w/ + or— 0.002" graduations <br /> Sump/UDC ID T1:87 STP T2:Diesel STP UDC 1-2 UDC 7-8 <br /> Sump Manufacturer Fiberglass Fiberglass Bravo Bravo <br /> Sump Depth (inches) 50" 50" 8" 8" <br /> Sump Bottom to Top of 16" 16" 2. 2. <br /> Highest Pipe <br /> Penetration (inches) <br /> Test Start Time 8:17am 8:17am 10:14am 10:14am <br /> Initial Reading 4.2312 4.6542 1.8239 1.7130 <br /> Test End Time 8:32am 8:32am 10:29am 10:29am <br /> Final Reading 4.2301 4.6538 1.8236 1.7126 <br /> Change in Reading 0.0011 0.0004 0.0003 0.0004 <br /> Pass/Fail Criteria / - 0.002 / - 0.002 1 - 0.002 / - 0.002 002 <br /> Tightness Test Results ® Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail <br /> Sump/UDC ID UDC 3-4 UDC 5-6 UDC 7 Sat. <br /> Sump Manufacturer Bravo Bravo Bravo <br /> Sump Depth (inches) 8" 8" 8" <br /> Sump Bottom to Top of 2. 2. 2. <br /> Highest Pipe <br /> Penetration (inches) <br /> Test Start Time 10:14am 10:14am 11:54am <br /> Initial Reading 1.5561 1.6462 1.3758 <br /> Test End Time 10:29am 10:29am 12:09pm <br /> Final Reading 1.5555 1.6453 1.3754 <br /> Change in Reading 0.0006 0.0009 0.0004 <br /> Pass Fail Criteria / - 0.002 / - 0.002 / - 0.002 <br /> Tightness Test Results ® Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail ❑ Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in the <br /> COMMENTS section. <br /> Page 3 of 5 <br />