My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
1605
>
2300 - Underground Storage Tank Program
>
PR0504388
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2022 12:49:48 PM
Creation date
1/6/2021 8:49:19 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0504388
PE
2361
FACILITY_ID
FA0006185
FACILITY_NAME
STOCKTON FOOD AND GAS
STREET_NUMBER
1605
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16703101
CURRENT_STATUS
01
SITE_LOCATION
1605 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
110rda-Te t 416 2nd Street <br /> Galt, CA 95632 <br /> (209) 744-0113 Fax (209) 744-0116 <br /> E.O.VR-203/204 <br /> Veeder-Root Vapor Polisher Hydrocarbon Emissions Test Form <br /> Permit Number: N-3451 Date of Test: 05-28-20 Time: 1100 <br /> Site Name: EL DORADO GAS MART <br /> Site Address: 1605 S EL DORADO STREET <br /> mr— <br /> City: STOCKTON CA Zip: 95206 Technician: FELIX RAMIREZ <br /> VST: 3001003870 <br /> District: BAY AREA Veeder-Root: B34976 <br /> HYDROCARBON ANALYZER CALIBRATION CHECK <br /> Hydrocarbon analyzer zero check reading 0 <br /> Hydrocarbon analyzer calibration check reading 9100 <br /> Is the zero check reading< 0.1%by volume? Yes <br /> Is the calibration check reading between 0.8% and 1.0%by volume? Yes <br /> HYDROCARBON EMISSIONS TEST - <br /> Starting inlet test gas flow rate (scfh) 15 SCFH <br /> Ending inlet test gas flow rate (scfh) 15SCFH <br /> Hydrocarbon reading at 3 minutes (ppmv) 0 <br /> Hydrocarbon reading at 4 minutes (ppmv) 0 <br /> Hydrocarbon reading at 5 minutes (ppmv) 0 <br /> Hydrocarbon reading at 6 minutes (ppmv) 0 <br /> Is the hydrocarbon concentration<9000 ppmv for all readings? Yes <br /> NOTES: 'The hydrocarbon concentration must be less than 9000 ppmv for all readings otherwise the vapor polisher is not <br /> in compliance. <br /> 'Three-way valve must be returned to normal(open)operating position after testing is completed. <br /> 'The PMC vapor mode must be reset to automatic after testing is completed. <br /> I declare, under penalty of perjury under the laws of the state of California that based on information and belief formed <br /> after reasonable inquiry, the statements and information provided in this document are true, accurate, and complete. <br /> Signature of Technician: Date: 05-28-20 <br /> Ver. 1.1—01.20.09 <br />
The URL can be used to link to this page
Your browser does not support the video tag.