Laserfiche WebLink
UNDERGROUND STORAGE TANK MONITORING SYSTEM CERTIFICATION <br /> UST Monitoring Site Plan <br /> Site Address: Pilot Flying J _ 15100 Thornton Rd, Lodi CA 95242 <br /> LEGEND <br /> D=Dispenser <br /> F=Monitoring Control Panel <br /> S=Sensor <br /> STP-Turbine Sump <br /> F=Fill Bucket <br /> V=Vapor Bucket <br /> !1 Annular Sensor <br /> Id=Automatic Tank Gage <br /> TS-Transition Sump <br /> L35 L=Line Leak Der-lui <br /> Product Lines= <br /> r_u `da nt Lines= <br /> Vapor Lines= <br /> Las CAS=Clean Air Seperator <br /> Vnt Lines <br /> ry�. 129 Emergence Shut Of Switch <br /> &kryy_ ca (D=0dertill Alarm <br /> Example STK-11=Turbmn Smsorl Uae <br /> Leak Detctor <br /> aLZd <br /> L24 <br /> a z,s <br /> y25 - <br /> � . 5 <br /> �9 <br /> LS <br /> Lc' Lt3 <br /> .- L4 0 <br /> 0 0 <br /> y SIS LZ ,�-fi LS <br /> o <br /> m 0 17 <br /> o TBlS L5 <br /> C7 d LT <br /> i (�... �.. <br /> -- I <br /> Ir <br /> ➢EF ..4 ..� <br /> F p� <br /> L9 � TS L21 ® p N <br /> t1. V a <br /> CAB <br /> OLt T U 1� <br /> TBI~c pia <br /> I + a <br /> G C7 O85 <br /> 7 1D LID. <br /> r, <br /> INI <br /> h <br /> I <br /> Building <br /> r <br /> 11 2 JL4. <br /> TLS <br /> d5C <br /> TLS S L_ W6 I -L" <br /> TLa (DL.'+ 'I: ❑ I 3l E L12 <br /> Date map was drawn: —5—/-15—/-2014— <br /> Instructions <br /> _1_15I2014Instructions <br /> If you already have a diagram that shows all required information, you may include it, rather than this page, with your <br /> Monitoring System Certification_ On your site plan, show the general layout of tanks and piping. Clearly identify locations <br /> of the following equipment, if installed: monitoring system control panels; sensors monitoring tank annular spaces, <br /> sumps, dispenser pans, spill containers, or other secondary containment areas; mechanical or electronic line leak <br /> detectors, and intank liquid level probes (if used for leak detection), In the space provided, note the date this Site Plan <br /> was prepared_ <br /> Page 5 of <br />