My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
419
>
2300 - Underground Storage Tank Program
>
PR0231433
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2021 9:30:55 AM
Creation date
1/7/2021 11:33:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231433
PE
2361
FACILITY_ID
FA0003685
FACILITY_NAME
DBA CIRCLEK, REFUEL PETROLEUM INC.
STREET_NUMBER
419
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
21938610
CURRENT_STATUS
01
SITE_LOCATION
419 S MAIN ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br />MONITORING SYSTEM CERTIFICATION FORM (Paye 6 of 6) <br />XVI. MONITORING SITE PLAN <br />Date site map was prepared: 5/27/2020 <br />If you already have a site plan that shows all required information, you may include it, rather than this page, with your Monitoring System <br />Certification Form. The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br />if installed: 1) monitoring system control panels; 2) in-tank liquid level probes (if used for leak detection); 3) devices monitoring tank <br />annular spaces or vault; 4) devices monitoring product piping; 5) devices monitoring fill piping; 6) devices monitoring vent piping; 7) devices <br />monitoring vapor recovery piping; 8) devices monitoring vent/transition sumps; 9) devices monitoring under-dispenser containment; 10) <br />line leak detectors; and 11) devices monitoring any other secondary containment areas. <br />Nlonibvring 5nrsutn Certification <br />UST Wanitorirrg Site Plan <br />Site Address: 115 S. MAIN S-RE=T MAN TECA CA 953ee <br />��Lti G <br />(_°aRR(AN5) <br />I}Ta.NNzn.e of A:2 i- <br />emp and L�}C s. - - No tsnd,-nmo nd <br />:must �FemAata . . . . . . . - <br />hkwt _ pritns- <br />L L <br />K X l ?� <br />91 0 87 ASF. <br />_GAS. TSS <br />F O 10, i f4 <br />KEY <br />A _ �'YwiTI �iR <br />F = FILLS <br />T = IL7Ft3LNE <br />P — PRD1E <br />V =Tr"_kPDR <br />= 9L*S'� SEh'S4R <br />L =Lenlr Det�tur <br />7i:f =Mann-q. - <br />B =Brasse rySa644r <br />I = Smart Seu r - - - - - - - - <br />S- =SIP[ CAR WASH AW i ura��vUMI.?aW are nar3 ixWe- ro the cS7-fbiir�grac i�tu ictxr are a <br />C = Flom & ic%sins ptrr sionai ap2nion �nti4 m d arg Dish ,dor i�doeznu�rratrtlpavpocea. Drmruse <br />E = E Stop - nor to scale <br />Da-s m3ap was drawn5r8119 <br />"St UctL ns <br />Ir you already ha�re a dag ram :hat shaves all csquired infatmal.ion. you may me: rode it -341ar flan ?his rya ae. with yo-'u* Won:rar>ng System Certif-inion 0-r your site plaa, <br />snow the general kayo:t ottanks and caping. Clearjo idemihy lo03tions of-he Following eq:: iprrem, if instaled: rtccitc ring system corrMml panels, sensors man boring tank <br />ann alar 3pai-_3. sumps. d;sperseT parrs, sp'dl cantaine's. ar other secondary oontairrr�em areas: rnechan cal or elec!tmpic line 'Leak de-ectors: and in-tank h;uid level <br />probes q ff used f*T leak delaW ony. In the sps: z p.�m6ad, ncie tE.e jab= ;his S ire PUn wasp prepared. <br />Ma.nirtaring SystencCeFUF�-,ation Page 4ut4 2121A7 <br />LEGEND <br />
The URL can be used to link to this page
Your browser does not support the video tag.