My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
419
>
2300 - Underground Storage Tank Program
>
PR0231433
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2021 9:30:55 AM
Creation date
1/7/2021 11:33:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231433
PE
2361
FACILITY_ID
FA0003685
FACILITY_NAME
DBA CIRCLEK, REFUEL PETROLEUM INC.
STREET_NUMBER
419
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
21938610
CURRENT_STATUS
01
SITE_LOCATION
419 S MAIN ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 <br />Secondary Containment Testing Report Form <br />Page of <br />This form is intended for use by conb actors performing periodic testing of UST secondary containment systems. Use the <br />appropriate pages of this form to report results for all components tested The completed form, ~Written test procedures, and <br />printouts from tests (if applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency. <br />1. FACILITY INFORMATION <br />2. TESTING CONTRACTOR INFORMATION <br />Company Name: Afford -a -test <br />Facility Name: <br />Refuel Circle K <br />I Date of Testing: May 15, 2018 <br />Facility Address: <br />419 South Main St., Manteca, Ca. 95366 <br />Facility Contact: <br />Al or Simi, Manager <br />Phone: (209) 276-7013 <br />Date Local Agency Was Notified of Testing : 4/10/2018 <br />Name of Local Agency <br />Inspector (if present darr•ing testing): <br />Repairs <br />Made <br />Component <br />2. TESTING CONTRACTOR INFORMATION <br />3. SUMMARY OF TEST RESULTS <br />Company Name: Afford -a -test <br />Technician Conducting Test: Benjamin <br />F. Duncan Jr. /ICC #5246802 -UT <br />Credentials: X CSLB Licensed Contractor X SWRCB Licensed Tank Tester <br />License Type: A <br />License Number: CSLB Lie. #341375/S)VRCB Lie. #90-1120 <br />Manufacturer Trainine <br />Manufacturer Component(s) Date Training Expires <br />Caldwell Systems <br />Piping Sum s/UDC's July 5, 2020 <br />Fail <br />Not <br />Tested <br />Repairs <br />Made <br />Component <br />Pass <br />Fail <br />3. SUMMARY OF TEST RESULTS <br />If hydrostatic testing was performed, describe what was done with the water after completion of tests: <br />Test Fluid Supplied and Recovered for reuse. <br />CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br />To the best of my knowledge, the facts stated in this document are accurate and in full compliance with legal requirements <br />Technician's Signature: �Je�2�' .�nr.�iai �o1/ty2ctr�L�i. Date: May 15, 2018 <br />Component <br />Pass <br />Fail <br />Not <br />Tested <br />Repairs <br />Made <br />Component <br />Pass <br />Fail <br />Not <br />Tested <br />Repairs <br />Made <br />Annular Tank #1 <br />X <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />Annular Tank #2 <br />X <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />Annular Tank #3 <br />X <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />Secondary Pipe #1 <br />X <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />Secondary Pipe <br />#2 <br />X <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />Secondary Pipe #3 <br />X <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />Piping Sump #1 <br />X <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />Piping Sump <br />#2 <br />X <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />Piping Sump #3 <br />X <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />Dispenser Sump #1&2 <br />X <br />❑ <br />❑ <br />❑ <br />❑ <br />FEI <br />❑ <br />❑ <br />Dispenser Sump #3&4 <br />X <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />If hydrostatic testing was performed, describe what was done with the water after completion of tests: <br />Test Fluid Supplied and Recovered for reuse. <br />CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br />To the best of my knowledge, the facts stated in this document are accurate and in full compliance with legal requirements <br />Technician's Signature: �Je�2�' .�nr.�iai �o1/ty2ctr�L�i. Date: May 15, 2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.