My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
419
>
2300 - Underground Storage Tank Program
>
PR0231433
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2021 9:30:55 AM
Creation date
1/7/2021 11:33:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231433
PE
2361
FACILITY_ID
FA0003685
FACILITY_NAME
DBA CIRCLEK, REFUEL PETROLEUM INC.
STREET_NUMBER
419
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
21938610
CURRENT_STATUS
01
SITE_LOCATION
419 S MAIN ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 <br />5. SECONDARY PIPE TESTING <br />Page of <br />Comments — (inclzrde information on repairs made prior to testing, and recommended follotiv-up for failed tests) <br />Replaced test boot on Super 91 Secondary Pipe at STP Piping Sump #19 prior to testing. <br />Test Method Developed By: X Piping Manufacturer ❑ Industry Standard ❑ Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: X Pressure ❑ Vacuum ❑ Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: Pressure Gauges in Psi/Nitrogen <br />Equipment Resolution: 1/1045 Psi <br />Piping Run #1 <br />Piping Run #2 <br />Piping Run #3 <br />Piping Run # <br />Piping Material: <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Piping Manufacturer: <br />Smith <br />Smith <br />Smith <br />Piping Diameter: <br />3" <br />3" <br />3" <br />Length of Piping Run: <br />Approx. 50' <br />Approx. 50' <br />Approx. 50' <br />Product Stored: <br />Super 91 <br />Regular 87 <br />Diesel <br />Method and location of <br />i in -run isolation: <br />Test hose at <br />UDC#1&2 <br />Test hose at <br />UDC#1&2 <br />Test hose at <br />UDC#1&2 <br />Wait time between applying <br />pressure and starting test: <br />5 Minutes <br />5 Minutes <br />5 Minutes <br />Test Start Time: <br />9:25 <br />8:45 <br />8:55 <br />Initial Reading (RI): <br />3 Psi <br />3 Psi <br />3 Psi <br />Test End Time: <br />10:25 <br />9:45 <br />9:55 <br />Final Reading (RF): <br />3 Psi <br />3 Psi <br />3 Psi <br />Test Duration: <br />1 Hour <br />1 Hour <br />1 Hour <br />Change in Reading (RF -RI): <br />0 Psi <br />0 Psi <br />0 Psi <br />Pass/Fail Threshold or <br />Criteria: <br />No detectable loss <br />No detectable loss <br />No detectable loss <br />Test Result, <br />Pass <br />Pass <br />Pass <br />Comments — (inclzrde information on repairs made prior to testing, and recommended follotiv-up for failed tests) <br />Replaced test boot on Super 91 Secondary Pipe at STP Piping Sump #19 prior to testing. <br />
The URL can be used to link to this page
Your browser does not support the video tag.