Laserfiche WebLink
<br /> <br /> <br />www.erm.com Project No.: 0565667 Client: Amazon.com Services LLC 17 December 2020 Page 1 <br />HAZARDOUS WASTE SOURCE REDUCTION EVALUATION REVIEW AND PLAN <br />Amazon.com Services LLC – OAK4 <br />INTRODUCTION <br />1. INTRODUCTION <br />The Hazardous Waste Source Reduction and Management Review Act of 1989, also referred to as <br />Senate Bill 14 (SB 14), requires certain hazardous waste generators to identify opportunities to reduce <br />hazardous wastes at their facilities. Amazon.com Services LLC – OAK4 (Amazon) located at 1555 N <br />Chrisman Road in Tracy, CA (the facility) generated greater than 12,000 kilograms (26,400 pounds) of <br />hazardous waste in 2019. Therefore, ERM-West, Inc. (ERM) has prepared this Source Reduction <br />Evaluation Review and Plan (Plan) in accordance with SB 14 and the California Code of Regulations <br />(CCR), Title 22, Section 67100.5 (see Appendix A for a summary of 22 CCR 67100.5). <br />This Plan describes Amazon’s review of hazardous waste generated in 2019, evaluation of potential <br />source reduction measures, and selected source reduction measures and numeric goals. The Plan <br />includes sufficient details to convey an understanding of the facility’s hazardous waste management <br />approaches. Amazon identified and reviewed feasible measures to potentially reduce the generation of <br />hazardous waste at the source, as well as associated liabilities and potential adverse impacts to public <br />health and the environment. <br />In accordance with the requirements of SB 14, ERM completed a source reduction evaluation for the <br />facility and prepared the following three documents: <br />1. Hazardous Waste Source Reduction Plan; <br />2. Hazardous Waste Management Performance Report; and <br />3. Summary Progress Report. <br />SB 14 was amended in July 2012 by SB 1018. The law no longer requires generators to submit the <br />Summary Progress Report to the Department of Toxic Substances Control (DTSC). However, the <br />Summary Progress Report must be retained onsite with the other documents noted above. <br />Management for Amazon is committed to providing the resources and support necessary to implement <br />this Plan.