Laserfiche WebLink
<br /> <br /> <br />www.erm.com Project No.: 0565667 Client: Amazon.com Services LLC 17 December 2020 Page 10 <br />HAZARDOUS WASTE SOURCE REDUCTION EVALUATION REVIEW AND PLAN <br />Amazon.com Services LLC – OAK4 <br />UPDATING THE PLAN <br />7. UPDATING THE PLAN <br />Following completion of the written Plan, Amazon may elect not to implement a source reduction <br />measure, which may be based on the determination that the measure is not technically feasible or <br />economically practical. In addition, Amazon may opt not to implement a source reduction measure if <br />implementation results in one of the following: <br />„ An increase in the generation of hazardous wastes; <br />„ An increase in the release of hazardous chemicals to other environmental media; <br />„ Adverse impact on product quality; and/or <br />„ A significant increase in the risk of an adverse impact to human health or the environment. <br />This Plan must be amended within 90 days following a decision not to implement a source reduction <br />measure outlined herein. The amendment must include documentation identifying the rationale for the <br />decision. <br />An amendment to the Plan can be in the form of an addendum, dated and signed by the individual <br />qualified to technically certify the Plan, and incorporated into the Plan by reference. A form for recording <br />updates and revisions is included in Appendix C.