My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
341
>
2300 - Underground Storage Tank Program
>
PR0231477
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2021 10:17:41 AM
Creation date
1/8/2021 2:27:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231477
PE
2361
FACILITY_ID
FA0003753
FACILITY_NAME
RIPON SHELL*
STREET_NUMBER
341
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
RIPON
Zip
95366
APN
26114007
CURRENT_STATUS
01
SITE_LOCATION
341 E MAIN ST
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site:AA) <br /> 61� <br /> Appendix B Date: <br /> 71 SO Overfill Valve in Tank Shut off Level Worksheet Tank ID Tester <br /> Important: This is meant to be supplemental worksheet and not a substitute to following the installation <br /> manual instructions. All length measurements are in inches. Please contact the Authority Having Jurisdic- <br /> tion (AHJ) and review local,state,and national codes to determine the regulatory requirements governing <br /> shut-off capacity in your region,as well as take into account other considerations such as extreme tank tilt. <br /> Take the following measurements with the valve in- <br /> stalled in the tank: • - <br /> Distance from the 71 SO inlet tube flange to the cast C <br /> lug in the 71 SO body(see figures),upper tube length. r' <br /> Note: the Upper Tube Length must be at least 16"to in- <br /> clude the protective bend in the tube. <br /> ,r <br /> Distance from the 71 SO inlet tube flange to the top and � ! <br /> bottom of lower tube,valve length. <br /> (W) _ 5-o i k&(U) _ � H ! yb Upper <br /> Tube <br /> Distance from the 71 SO inlet tube flange to the bottom <br /> of the tank. Note: If a tank bottom protector is present it <br /> may be necessary to add this thickness to dimension <br /> (OPW 61 1 1 &61 TP models add 0.6") (W)Valve <br /> (B) = 15Z3�Y /5-0 I Length, <br /> bottom of <br /> From the tank calibration chart provided by tank manu- L cut j <br /> facturer find the dipstick number (Y) which corresponds G; <br /> to the 100%volume. (B) <br /> (Y) _ ZO / ZD To Tank <br /> ji <br /> 1. To determine shut-off percentage: Tank <br /> Subtract upper tube length (D)from distance to tank (U)Valve Chart <br /> bottom (B) , Length, 100% <br /> (X) = (B) —(D)-21'_ � /03 top of cut Volume <br /> Dipstick r <br /> Using the tank calibration chart provided by the tank <br /> manufacturer determine the tank capacity at the cal- <br /> culated (X) dimension and the 100%volume(Y) tank <br /> capacity. <br /> (X)tank capacity in gallons= ��Cl �( &62v <br /> (Y)tank capacity in gallons= 3� 4 96 <br /> SO%_ (X)capacity/(Y)capacity x100=�y' ( � �-�• <br /> Note: The overfill valve must be installed per AHJ require- <br /> ments and all applicable local,state,and national codes. If <br /> the overfill valve is set above the allowable shut-off percent- <br /> age the overfill valve must be removed and replaced. For <br /> reference 40 CFR part 280 Subpart B Section 280.20 overfill <br /> valves should be set to a maximum of 95%. <br /> 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.