My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
85
>
2300 - Underground Storage Tank Program
>
PR0231656
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2021 12:07:10 PM
Creation date
1/8/2021 2:27:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231656
PE
2351
FACILITY_ID
FA0003635
FACILITY_NAME
ARCO 06080
STREET_NUMBER
85
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330
APN
19627010
CURRENT_STATUS
01
SITE_LOCATION
85 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Overfill Prevention Equipment Inspection Report <br /> 6. OVERFILL PREVENTION EQUIPMENT DETAILS <br /> Tani{ ID (one OPE per column) T1 87 TZ 91 T3 Diesel <br /> Are both vent and tank riser piping VYes V( Yes �/j Yes Yes <br /> secondarily contained? No No No No <br /> OPE Model Veeder Root Veeder Root Veeder Root <br /> What is the OPE response when activated? Shut off Shut off Shut off Shut off <br /> (Check all that apply.) Flow Flow Flow Flow <br /> estricts estricts estricts Restricts <br /> Flow Flow Flow Flow <br /> Z/ Audible 0/ Audible r/ Audible Audible <br /> Alarm Alarm Alarm Alarm <br /> Visual �v/ Visual Visual Visual <br /> Alarm Alarm Alarm Alarm <br /> Are flow restrictors installed on vent piping Yes* Yes* Yes* Yes* <br /> that may interfere with the OPE operation? LNo No �/ No No <br /> At what level in the tank is the OPE set to <br /> activate? Inches from bottom of tank 100" 99 3/8" 99 I/e" <br /> What is the percent capacity of the tank at <br /> 90$ 90% 90% <br /> which the OPE activates? <br /> Is the OPE in proper operating condition to �/ Yes �/ Yes �/ Yes Yes <br /> respond when the stored substance No No No No <br /> reaches the designated regulatory level?. <br /> 7. SUMMARY OF TESTING RESULTS <br /> OPE Inspection Results / Pass 1/ Pass Pass Pass <br /> Fail Fail Fail Fail <br /> $. COMMENTS <br /> Describe all results marked "Fail"and each proposed remedy. <br /> * Mark here if: <br /> Flow restrictors interfere with overfill prevention and equipment repairs required. <br /> Additional copies of this page may be attached. <br /> Attach tank chart(s), measurements, calculations, and In-Tank Setup reports) <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.