Laserfiche WebLink
f <br /> x m n € <br /> OPW 7150 Overfill <br /> Materials important <br /> t o ; In order to prevent product <br /> Prevention Valves Valve Body: Cast aluminum spillage from the Underground <br /> Storage Tank (UST), properly <br /> The CARB-certified OPW 71 SO Float: Nitrile rubber, closed cell foam maintained delivery equipment <br /> vapor-tight Overfill Prevention Valve and a proper connection at the <br /> is designed to prevent the overfill of Valve : Aluminum T i tight-fill adaptor are essential. <br /> Seals: Viton® Delivery personnel should <br /> underground storage tanks by providing . be managed and trained <br /> a positive shut-off of product delivery. Upper & lower Drop Tube : Aluminum ' ' ' to inspect delivery elbows <br /> and hoses for damaged and <br /> The shut-off valve is an integral part of Plastic parts: Acetal <br /> missing parts. They should <br /> the drop tube used for gravity filling . Hardware: Stainless steel a always make certain there <br /> The OPW 71 SO allows easy installation gyp' f is a positive connection <br /> ffr�>lit 1between the adaptor and <br /> (without breaking concrete) and requires Features elbow. If delivery equipment <br /> no special manholes. + Simple, Easy and Quick is not properly maintained, <br /> The OPW 71 SO is a vapor-tight two- Installation — no excavationor the elbow is not securely <br /> or <br /> coupled to the adaptor, a <br /> stage shut-off valve. When the liquid special manholes required * serious spill may result when <br /> level rises to about 95 % of tank .� Economical — costs a fraction the DPW 71 SO closes, causing <br /> capacity, the valve mechanism is a hazard and environmental <br /> released, closing automatically with <br /> of expensive, complicated and � contamination, <br /> difficult4o-install valves. <br /> the flow. This reduces the flow rate to NOTE: The DPW 71 SO is <br /> approximately 5 gpm through a bypass <br /> + Furnished Complete — supplied <br /> f designed for use on tight•fill <br /> with new upper and lower drop tubes, gravity drop applications Doty. <br /> valve. The operator may then stop the <br /> and drain mounting hardware and thorough Do not use for pressure <br /> filling process and disconnect <br /> instructions for quick job site time. ? fill applications. <br /> the delivery hose. As long as the liquid q <br /> exceeds the 95% level, the valve will + Completely Automatic Operation + Retrofits Directly — for both new <br /> close automatically each time delivery — no prechecks to perform, no resets <br /> is attempted . and no overrides to be broken and existing tanks with 4 " fill risers. <br /> if the delivery is not stopped and the or abused. + Quick Drain Feature — <br /> liquid rises to about 98% of tank + No Pressurization of the Tank — automatically drains hose when head <br /> capacity, the bypass valve closes operates directly from liquid level . pressure is relieved. <br /> completely. No additional liquid can flow ® Will Accept a Dipstick + Best Flow Rate in The Industry* <br /> into the tank until the level drops below <br /> for Gauging • OPW Test Lab results <br /> a reset point. <br /> NOTE : The 71 SO Overfill Prevention <br /> Valve can be adjusted to shutoff at any Advantages of Overfill Prevention <br /> desired tank capacity. Please contact the Compared to Overfill Warning Systems: <br /> Authority Having Jurisdiction (AHJ) and + Completely Automatic faster fill times and reducing <br /> review local, state, and national codes to Operation — does not rely on the spill risk . <br /> determine the regulatory requirements alertness or speed of response of the o Speeds Delivery Operations <br /> governing shut-off capacity in your delivery attendant for certainty of — product flows unimpeded into <br /> region, as well as take into account overfill prevention . the tank until the hose " kick " that <br /> other considerations such as extreme 4. Keeps the Top of UST " Dry," accompanies the valve shut-off <br /> tank tilt. In all cases, the upper tube rovides a clear signal that the <br /> must protrude into the tank at least per EPA Requirements - p g <br /> 6112 " to ensure that the valve can shut eliminating possible leaks at loose liquid has reached the shut-off level. <br /> off flow into the tank completely before bung fittings and the need for ® Simple and Inexpensive <br /> the top of the tank is wetted as per double containment on vent lines. Installation — in both two-point <br /> EPA requirements. ® Does Not Rely on Pressure in and coaxial fill applications, no <br /> the UST to Stop Flow — allowing additional excavation, manholes or <br /> 71 SO Instruction Sheet Order vent piping are required. <br /> Number , H15524PA <br /> took for this label for <br /> authentic OPW EVN <br /> Listings and � Approved products. <br /> Certifications RC! <br /> i rnIBoard �Faw . DPW 71SOM is EVR Approved for E85 <br />