My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2905
>
2300 - Underground Storage Tank Program
>
PR0231952
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2022 4:18:32 PM
Creation date
1/8/2021 2:33:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231952
PE
2351
FACILITY_ID
FA0003712
FACILITY_NAME
CHEVRON STATION #94275*
STREET_NUMBER
2905
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09760004
CURRENT_STATUS
01
SITE_LOCATION
2905 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
W.O.# NW1-2348303 <br />Cust Ref# : COCO-0015345128 <br />/ p treat Ad ress: w' ' p <br />Sile�ame/a: it / (� 1 7. -i Gi, r . .•7 "f I A Z -/ u <br />COMPANY CONFIDENTIAL © Tanknology Inc., 2019. All Rights Reserved. <br />rinted copies of this document are uncontrolled. The current version is available in the Tanknoloa On-line Document Control S stem. <br />Ovf <br />er on 911e: Date <br />Am-] Time: <br />Departure Time: <br />Travel Time: <br />Scope of work and Tasks Performed (JSA's must be ava1ila'ble for all, tasks): <br />Repairs to Equipment or Parts Provided: <br />Follow-up actions required: equipment isolated; comments: <br />PPE- PERSONAL PROTECTIVE EQUIPMENT REQUIRED Check ✓items used or mark -if notapplicable) <br />Safety Vest � Safety Glasses Gloves ❑ Hearing Protection <br />Goggles ❑ Hard Hat ❑ <br />Steel Toe Boots ❑ Splash Other <br />PRE-TEST PROCEDURES (Check -,each item completed or mark -- if not applicable) <br />/✓ <br />�L safety procedures with site personnel. Nearest hospital: 7/1 <br />1. lscuss <br />'to fuel deliveries the UST system must be placed back into working order. <br />2.�Piacerfire <br />3.e entire work area with barricades (cones, flags, and extension bars, caution tape, pennant flags, or other perimeter guard). <br />4. extinguishers and "No Smoking" signs in the work area. <br />5. ❑ _ Confined Space Entry - If required complete separate CSE Checklist. If NO CSE REQUIRED check the following reason: <br />❑No CS's ❑CS's not opened []No entry only visual ❑No entry - used tools []Work from prone position Wo risk of falling in <br />6. ❑ Implement LockouVTagout per API 1646 (when accessing product piping during tasks) <br />❑ Secure nozzles with "Out of Service" bags and nylon ties. ❑ Secure the circuit breaker(s) with lockout devices and tags. <br />❑ Close ball valves or check valves on product piping. ❑ Disconnect electrical "bayonet" connector from the STP(s). <br />❑ All applicable equipment disabled during test(s). ❑ Verify LOTO is complete by trying to operate pumps. <br />SIGN IN lead Technician Name Lead Technician Signature <br />General Safety Checks: �(7 <br />All site personnel have been informed. J r <br />Is a fuel delivery due today? Site Representative Name Site Representative Signature <br />LOTO procedures have been discussed. <br />Work areas barricaded to protect workers, staff &public. I I <br />s <br />v" POST-TEST PROCEDURES (Checky ram Item completed or ma - if not applicable) <br />1. Remove all "Lockout/Tagout" devices and nozzle bai: <br />2. Run all pumps and verify there are no leaks: iripact Valve Test Ports under dispensers <br />Leak Detector Threads on STP's ❑ Functional Elements & Relief Screws <br />3. Install lead wire seal on all test plugs & leak detectors that were serviced. <br />/ Count LD threads: L1 _ L2 _ L3 _ L4 L5 _ L6 <br />I G sensors, & caps <br />4. i Check following components operational: }d�A probes, <br />floats, dry breaks & caps ❑ Cathodic protection operational <br />.5aII <br />/�Gontainment sumps are dry ❑ Di risers & POS operational <br />f Dispenser panels are replacedJXDp tubes, flapper valves, fill adapters &caps <br />beak detectors & vent tubes A Wpkole covers and sump lids <br />/Monitoring system is operational ear valves are open <br />Siphon lines and manifold valves open Spill containers & drain valves <br />STP fittings and bayonet connectors ❑ Vents & Extractors (not capped, plugged or isolated) <br />5. Remove barricades. <br />SIGN OUT & Operator Verification of Work (OVF) <br />Lead Technician Name <br />�� <br />Lead Technician Signature <br />General Safety Checks: <br />Work area has been left clean & safe. <br />/ <br />I 'l f <br />Site staff aware of work status including any remaining isolation. <br />Changes to equipment are documented and communicated. <br />Site Representative Name <br />Site RepresentWtive Signature <br />All incidents, near incidents, and unsafe situations reported. <br />Site Representative Comments: <br />�— <br />COMPANY CONFIDENTIAL © Tanknology Inc., 2019. All Rights Reserved. <br />rinted copies of this document are uncontrolled. The current version is available in the Tanknoloa On-line Document Control S stem. <br />Ovf <br />
The URL can be used to link to this page
Your browser does not support the video tag.