Laserfiche WebLink
BELOW • PRODUCTS www. • • . <br /> OPW 7150 Overfill Materials Important <br /> Prevention Valves In order to prevent product <br /> Valve Body : Cast aluminum spillage from the Underground <br /> The CARB-certified OPW 71 SO Storage Tank ( UST) , properly <br /> Float : Nitrile rubber, closed cell foam maintained delivery equipment <br /> vapor-tight Overfill Prevention Valve <br /> Valve : Aluminum and a proper connection at the <br /> is designed to prevent the overfill of tight-fill adaptor are essential . <br /> underground storage tanks by providing Seals : Vlton9 Delivery personnel should <br /> I managed and trained <br /> apositive shut- off of product delivery. Upper & lower Drop Tube : Aluminum to <br /> inspect delivery elbows <br /> The shut-off valve is an integral part of Plastic parts : Acetal and hoses for damaged and <br /> r <br /> the drop tube used for gravity filling . O , missing parts. They should <br /> Hardware : Stainless steel SA ' always make certain there <br /> The OPW 71 SO allows easy installation FV < is a positive connection <br /> (without breaking concrete) and requires ;�rR between the adaptor and <br /> Features <br /> n0 special manholes. _ elbow. If delivery equipment <br /> ♦ Simple, Easy and Quick is not properly maintained, <br /> The OPW 71 SO is a vapor-tight two- Installation — no excavation or or the elbow is not securely <br /> special manholes required . coupled pthe adaptor, a <br /> stage shut- off valve. When the liquid s <br /> p q serious spill may result when <br /> level rises to about 95 % of tank ♦ Economical — costs a fraction the DPW 71 SO closes, causing <br /> capacity, the valve mechanism is of expensive, complicated and a hazard and environmental <br /> , com <br /> released , closing automatically with p p contamination . <br /> the flow. This reduces the flow rate to difficult-to- install valves. <br /> approximately 5 gpm through a bypass ♦ Furnished Complete — supplied + NOTE : The OPW 71 SO is <br /> valve. The operator may then stop the with new upper and lower drop tubes, i designed for use on tight-fill <br /> p y p gravity drop applications only. <br /> filling process and disconnect and drain mounting hardware and thorough Do not use for pressure <br /> the delivery hose. As long as the liquid instructions for quick job site time. t._ fill applications. <br /> exceeds the 95 % level , the valve will ♦ Completely Automatic Operation <br /> close automatically each time delivery — no prechecks to perform , no resets ♦ Retrofits Directly — for both new <br /> is attempted . and no overrides to be broken and existing tanks with 4 " fill risers . <br /> If the delivery is not stopped and the or abused . ♦ Quick Drain Feature — <br /> liquid rises to about 98 % of tank ♦ No Pressurization of the Tank — automatically drains hose when head <br /> capacity, the bypass valve closes operates directly from liquid level . pressure is relieved . <br /> completely. No additional liquid can flow ♦ Will Accept a Dipstick ♦ Best Flow Rate in The Industry * <br /> into the tank until the level drops below for Gauging <br /> a reset point . • OPW Test Lab results <br /> NOTE : The 71 SO Overfill Prevention <br /> Valve can be adjusted to shutoff at any Advantages of Overfill Prevention <br /> desired tank capacity. Please contact the Compared to Overfill Warning Systems . <br /> Authority Having Jurisdiction (AHJ ) and ♦ Completely Automatic faster fill times and reducing <br /> review local , state, and national codes to Operation — does not rely on the spill risk. <br /> determine the regulatory requirements alertness capacity in your orspeed of response of the <br /> governing shut- off p ♦ Speeds Delivery Operations <br /> delivery attendant for certainty of — product flows unimpeded into <br /> region , as well as take into account <br /> overfillp revention . <br /> other considerations such as extreme the tank until the hose " kick " that <br /> tank tilt . In all cases, the upper tube ♦ Keeps the Top of UST " Dry, " accompanies the valve shut-off <br /> must protrude into the tank at least per EPA Requirements — provides a clear signal that the <br /> 6 1 /2 " to ensure that the valve can shut eliminating possible leaks at loose liquid has reached the shut- off level . <br /> off flow into the tank completely before bung fittings and the need for ♦ Simple and Inexpensive <br /> the top of the tank is wetted as per double containment on vent lines. Installation — in both two- point <br /> EPA requirements . ♦ Does Not Rely on Pressure in and coaxial fill applications, no <br /> the UST to Stop Flow — allowing additional excavation , manholes or <br /> 71 SO Instruction Sheet Order vent piping are required . <br /> Number : H15524PA <br /> ir Look for this label for <br /> Listings and 0— U C 1 W� authentic OPW EVR <br /> California Air L Approved products. <br /> Certifications ResourcesBoardo OPW 71SOM is EVR Approved for E85 <br />