Laserfiche WebLink
Underground Storage Tank <br />Overfill Prevention Fquipmprlt Inspection Report <br />fi. OVERFILL PREVENTION EQUIPMENT DETAILS <br />Tank ID (one OPE per column) T1 <br />T2 <br />T3 <br />Are both vent and tank riser piping Yes r. <br />Yes <br />r. Yes <br />Yes <br />secondarily contained? r' No r' <br />No <br />r' No <br />r No <br />OPE Model OPW <br />OPW <br />OPW <br />Shut off <br />Shut off <br />Shut off <br />Shut off <br />Flow <br />Flow <br />Flow <br />Flow <br />v Restricts f <br />Restricts <br />Restricts <br />Restricts <br />What is the OPE response when activated? Flow <br />Flow <br />Flow <br />Flow <br />(Check all that apply) Audible <br />Audible <br />Audible <br />Audible <br />Alarm <br />Alarm <br />Alarm <br />Alarm <br />Visual <br />Visual <br />Visual <br />Visual <br />Alarm <br />Alarm <br />Alarm <br />Alarm <br />Are flow restrictors installed on vent piping r Yes* r <br />Yes* <br />r Yes* <br />r Yes* <br />that may interfere with the OPE operation? r: No r. <br />No <br />r, No <br />r No <br />At what level in the tank is the OPE set to <br />activate? (Inches from bottom of tank) 5800 <br />27934 <br />6241 <br />What is the percent capacity of the tank at <br />which the OPE activates? 94 <br />94 <br />94 <br />Is the OPE in proper operating condition to <br />r Yee <br />Yes r. <br />respond when the stored substance reaches <br />Yes <br />r. Yee <br />s <br />r Yes <br />r. r <br />the designated regulatory level? <br />r <br />r No <br />7. SUMMARY OF TESTING RESULTS <br />OPE Inspection Results r.' Pass r <br />Pass <br />r: Pass <br />r Pass <br />r Fail r <br />Fail <br />r Fail <br />r• Fail <br />8. COMMENTS <br />Describe all results marked "Fail" and each proposed remedy. <br />*Mark here if: <br />r Flow restrictors interfere with overfill prevention and equipment repairs required. <br />Additic s of th _ , . Y, e maybe attached. <br />Attach tank chart(s). measurements, calculations. and In -Tank Setup report(s) <br />