My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2905
>
2300 - Underground Storage Tank Program
>
PR0231952
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2022 4:18:32 PM
Creation date
1/8/2021 2:33:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231952
PE
2351
FACILITY_ID
FA0003712
FACILITY_NAME
CHEVRON STATION #94275*
STREET_NUMBER
2905
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09760004
CURRENT_STATUS
01
SITE_LOCATION
2905 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
W.O.# NW1-2348303 Cust Ref#: COCO-0015345128 <br />5 <br />y f ApORA B <br />71 So Ove rftfl Vahre in Tank Shut off Level Worksheet <br />tMa9fIgnt This is meant to be supplemental worksheet and not a substitute to following the installation <br />manual instructions. All length measurements are in inches. Please contact the Authority Having Jurisdic- <br />tion [AHA and review Iocal, state, and national codes to determine the regulatory requirements governing <br />shut-off capacity in your region, as well as take into account other considerations such as extreme tank tilt. <br />Take the fallowing measurements with the valve in- <br />stalled in the tank: <br />Distance from the 71 SO inlet tube flange to the Cast <br />lug In the 7150 body (see figures), uppertube length. <br />Note: the Lipper Tube Length must be at least 16' to <br />include the proteecti-v�e bend In the tube. <br />(o)= <br />distance from the 71$0 inlet tube flange to the top and <br />bottom of lower tube, valve length. <br />[v1= nth -- <br />Distance from the 7154 inlet tube flange to the bottom <br />of the tank. Note: If a tank bottom protector is present it <br />may be necessary to add this thickness to dimension <br />(OPW 6111 & 61 TP models add 0.6") <br />(a)= /7 <br />From the tank calibration chart provided by tank manu- <br />factu rer find the dipstick number M which corresponds <br />to the 100%vgIVme. <br />tri = �1 <br />1. To determine shut-off percentage: <br />5ubtact upper tube Iength (p) from distance to tank <br />bottom (6) <br />Using the tank cal ibrat)on chart provided by the tank <br />manufacturer determine the tank capacity at the cal- <br />culated (X} dimension and the 100% volume (Y) tank <br />capacity. <br />(X) tank capacity In gallons� <br />(Y) tank Capacity in gallons n u �' J <br />$o%= (]) capacity/ (Y) capacity x100 17 Z <br />(0) <br />Upper <br />Tube <br />(W) Valve <br />Length, <br />bottom of <br />cut <br />(8) <br />To Tank <br />tu) Valve <br />Length, <br />top of cut <br />M <br />Tank <br />Chart <br />1001E voi- <br />ume Dip - <br />Sb& <br />Note: The overfill valve must be installed per AM require- <br />ments and all appilcable local, state, and national codes. If <br />the overfill valve is set above the allowable shut-off percent- <br />age the overfill valve must be removed and replaced. For <br />relerence 40 CFR part 280 Subpart 6 Section 280.20 overfill <br />valves should be tel to a maximum of 95%6 <br />20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.