OSCOPE OF WORK: <br /> 1 . EXISTING FILL SUMP SENSOR WIRES, STP SUMP <br /> SENSOR WIRES AND STP TURBINE WIRE TO BE REUSED , <br /> 2 , INSTALL THREE (3 ) NEW SINGLE-WALL STP SUMPS . <br /> EXISTING FIBERGLASS WRAPS (ON COLLARS) TO <br /> REMAIN IF NO AIR-VOIDS OR DELAMINATING EXIST, <br /> 3 , INSTALL TEN ( 10) NEW DISPENSERS , NEW SINGLE-WALL <br /> DISPENSER SUMPS , SHEAR VALVES , FLEX <br /> CONNECTORS , BRACKETS AND HARDWARE . SENSOR <br /> WIRE TO BE REUSED . <br /> 4 , INSTALL NEW 2" SINGLE-WALL FRP VENT PIPING FROM <br /> TANKS TO VENTS , INSTALL NEW SINGLE WALL VENT <br /> TRANSITION SUMP AND NEW VENT RISERS , <br /> 5 , SOIL SAMPLING AS REQUIRED BY CUPA AND OTHER <br /> AHJ 'S . CONTRACTOR TO VERIFY, <br /> 6 , INSTALL NEW 3" OVER 2" DOUBLE-WALL FRP PRODUCT <br /> PIPING FROM TANKS TO DISPENSER SUMPS , <br /> 7 , INSTALL NEW 2" AND 3" VAPOR PIPING FROM TANKS TO <br /> DISPENSER SUMPS . <br /> 8 , INSTALL SIX (6) NEW DOUBLE-WALL SPILL BUCKETS AND <br /> NEW FILL AND VAPOR RISERS . <br /> 9 , INSTALL THREE (3) NEW EMCO WHEATON COMPOSITE <br /> STP MANWAYS , <br /> 10 , INSTALL FOUR (4) NEW FE PETRO VARIABLE-SPEED <br /> STP'S , <br /> 11 , INSTALL NEW STAINLESS STEEL PRODUCT PIPING , FLEX <br /> CONNECTORS , BALL VALVES , ADAPTERS AND FITTINGS <br /> IN THREE (3) TANK SUMPS , <br /> 12 , INSTALL THREE (3) NEW TLM PROBE RISERS , ADAPTERS <br /> AND CAPS , <br /> 13 , BACKFILL , INSTALL REBAR AND RESURFACE DRIVE <br /> SLAB AND TANK SLAB CONCRETE TO MATCH EXISTING , <br /> MANWAYS TO BE SET WITH 2" CONCRETE CROWN AT <br /> 24" OFF EDGE . <br /> 14, INSTALL ASPHALT SURFACES TO MATCH EXISTING , <br /> WHERE AFFECTED . <br /> 15, INSTALL SELF-LEVELING JOINT EPDXY AT ALL <br /> CONSTRUCTION JOINTS . <br /> 16, PERFORM FULL MONITORING SYSTEM CERTIFICATION <br /> AND START-UP VAPOR RECOVERY TESTING . <br /> 17 , COORDINATE ALL REQUIRED INSPECTIONS WITH <br /> JURISDICTION AUTHORITIES AND THIRD-PARTY <br /> INSPECTORS , <br /> 18 , BACKFILL EXCAVATION WITH PREVIOUSLY EXCAVATED <br /> MATERIALS . <br /> 19 , CLEAN UP THE SITE AND REMOVE ALL CONSTRUCTION <br /> DEBRIS , INCLUDING LOT SWEEPING OF AFFECTED <br /> AREAS . <br />