My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LINNE
>
1728
>
2800 - Aboveground Petroleum Storage Program
>
PR0540694
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2021 9:40:13 AM
Creation date
1/11/2021 9:25:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0540694
PE
2832
FACILITY_ID
FA0009536
FACILITY_NAME
CONCRETE INC
STREET_NUMBER
1728
STREET_NAME
LINNE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25311027
CURRENT_STATUS
01
SITE_LOCATION
1728 LINNE RD
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SPILL PREVENTION, CONTROL, & COUNTERMEASURE PLAN — MONTHLY INSPECTION FORM <br /> KRC Tracy Plant <br /> Date Inspected: <br /> Area to check (see notes below) Comments <br /> Tank Contents Size (gal.) Location Tank Leak <br /> Equipmentl,4 Detectionz Containment3 <br /> 1 Diesel Fuel 10,000 Fueling Area <br /> 2 Diesel Fuel 500 Fueling Area <br /> 3 Transformer Oil 200 Electrical Area <br /> Footnotes for table above: <br /> 1. Tank exterior free of visible leaks. Liquid level gauge in good working condition. Area around the tank free of visible signs of leaks. Primary tank free of <br /> water. Interstitial space monitoring equipment in good working condition. No water in interstitial space (for double-walled or double-bottomed tanks). <br /> 2. Check overfill equipment to ensure that it is functioning properly; test horns/lights. Piping connections and spill container in good working condition and <br /> free of visible leaks. Ladders/platforms/walkways secure and free from damage or corrosion. <br /> 3. Spill containment free of excess liquids, debris, cracks, corrosion, erosion, fire hazards and other integrity issues. Drain valves closed and in good <br /> working condition. Sufficient access to the containment (egress pathways clear/gates and doors operable). <br /> 4. Concrete ASTs: No cracks larger than 1/16". Tank exterior clean, coating in good condition, free of rust. Inspect tank openings (nipples, leak detection <br /> tubes, etc.)to ensure they are in good condition and sealed. Sealant intact and in good condition. <br /> 5. Safe operation: Identify any other conditions that need to be addressed for continued safe operation. <br /> Check spill kits and replace missing items: ❑ Drum ❑ Absorbent Socks ❑ Absorbent Pillows ❑ Particulate ❑ Gloves ❑ Bags and Labels <br /> Other conditions noted / comments or repairs conducted as a result of inspection (attach additional pages as necessary): <br /> Inspector Signature <br />
The URL can be used to link to this page
Your browser does not support the video tag.