My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
420
>
2300 - Underground Storage Tank Program
>
PR0231906
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2022 4:38:57 PM
Creation date
1/11/2021 9:57:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231906
PE
2361
FACILITY_ID
FA0003776
FACILITY_NAME
KWIK SERV LODI BW 113*
STREET_NUMBER
420
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06202042
CURRENT_STATUS
01
SITE_LOCATION
420 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
248
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Overfill Prevention Equipment Ins ection Report Form <br /> 6. OVERFILL PREVENTION EQUIPMENT DETAILS <br /> Ta n k I D (One OPE per column) E85 <br /> Are both vent and tank riser piping ❑ Yes ❑ Yes ❑ Yes ❑ Yes <br /> secondarily contained? ® No ❑ No ❑ No ❑ No <br /> OPE Model OPS/ <br /> Tank Manufacturer Cont Solut <br /> ® Shuts off ❑ Shuts off ❑ Shuts off ❑ Shuts off <br /> Flow Flow Flow Flow <br /> What is the OPE response when ® Restricts ❑ Restricts ❑ Restricts ❑ Restricts <br /> activated? Flow Flow Flow Flow <br /> (Check all that apply.) ❑ Audible ❑ Audible ❑ Audible ❑ Audible <br /> Alarm Alarm Alarm Alarm <br /> ❑Visual ❑Visual ❑Visual ❑Visual <br /> Alarm Alarm Alarm Alarm <br /> Are flow restrictors installed on vent ❑ Yes ❑ Yes ❑ Yes ❑ Yes <br /> piping thamay interfere with the OPE ® No ❑ No El No E] No <br /> operation? <br /> At what level in the tank is the OPE set to 1011, <br /> activate? (Inches from bottom of tank) <br /> What is the percent capacity of the tank in o <br /> which the OPE activates? 93/o <br /> Is the OPE in proper operating condition ® Yes ❑ Yes ❑ Yes ❑ Yes <br /> to respond when the stored substance ❑ No ❑ No ❑ No ❑ No <br /> reaches the designated regulatory level? <br /> 7. SUMMARY OF TESTING RESULTS <br /> OPE Inspection Results ® Pass [:1 ass ❑ Pass ❑ Pass <br /> ❑ Fail ❑ Fail ❑ Fail ❑ Fail <br /> 8. COMMENTS <br /> Replaced E85 drop tube. <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.