Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 9. COMMENTS <br /> Repair/Retest: <br /> - Repair DSL boot in 5/6 <br /> - Repair E-85 boot <br /> - Test E-85 STP and sec line <br /> -Test UDC 5/6, 7/8, 9/10 <br /> 2/18/2021 - Performed repairs for SB989. <br /> Replaced boot in E-85 STP. <br /> DSL sec boot in 5/6 could not be reached, may have to pull dispenser. Will need to return to fit DSL <br /> sec boot in 5/6 and test E-85 STP and sec line and 5/6, 7/8, 9/10. <br /> 6/16/2021 -Arrived on site to finish S13989. <br /> Tested E-85 STP and sec line - passed. <br /> UDCs 7/8 and 9/10 - passed. <br /> Will need to pull dispenser to replace DSL boot in UDC 5/6. <br /> All tested components passed. <br /> Will need to test DSL sec line and UDC 5/6 after repairs. <br /> 7/8/2021 - Removed dispenser 5/6 from island and replaced DSL boot. Replummed and wired <br /> dispenser back to island. Pump tested ok. <br /> Will need to return to test DSL sec line and UDC 5/6. <br /> 8/6/2021 - Tested UDC 5/6 and DSL sec line. <br /> All tests passed. <br /> 208 sensor in UDC 5/6 going in and out of alarm. Replaced, retested and passed. <br /> Page 6 of 6 <br />