Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMP/UDC TEST <br /> Test Method Developed by ❑ Manufacturer ❑ Industry Standard ® Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum ® Hydrostatic <br /> Test Equipment Used: Caldwell System <br /> Sump1UDC ID Sump1 Diesel UDC 1A UDC 1-2 UDC 2A-3A <br /> Sump Manufacturer Unknown Unknown Unknown Unknown <br /> Sump Depth (inches) 55" 38" 38" 38" <br /> Sump Bottom to Top of 17" 9" 910 90* <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 10:49 8:15 8:25 8:45 <br /> Initial Reading •00 .00 .00 .00 <br /> Test End Time 11:19 8:45 8:55 9:15 <br /> Final Reading •00 .00 .00 .00 <br /> Change in Reading •00 .00 .00 .00 <br /> Pass/Fail Criteria .005130 Min .005130 Min .005130 Min .005130 Min <br /> Tightness Test Results ® Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail <br /> Sump/UDC: ID 3-4 4A-5A 5 <br /> Sump Manufacturer Unknown Unknown Unknown <br /> Sump Depth (inches) 38" 36" 36" <br /> Sump Bottom to Top of 8" 8" 8" <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 8:50 9:05 9:25 <br /> Initial Reading .00 .00 .00 <br /> Test End Time 9.20 9:35 9:55 <br /> Final Reading .00 .00 .00 <br /> Change in Reading .00 .00 .00 <br /> Pass/Fail Criteria .005130 Min .006130 Min .005130 Min <br /> i L Tightness Test Results ❑ Pas�DF ail �] P ss ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 3 of 5 <br />