My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
10842
>
2300 - Underground Storage Tank Program
>
PR0505615
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2022 4:41:16 PM
Creation date
1/11/2021 10:05:19 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0505615
PE
2361
FACILITY_ID
FA0006898
FACILITY_NAME
RAMOS OIL-FRENCH CAMP
STREET_NUMBER
10842
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19333028
CURRENT_STATUS
01
SITE_LOCATION
10842 S HARLAN RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMP/UDC TEST <br /> Test Method Developed by ❑ Manufacturer ❑ Industry Standard ® Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum ® Hydrostatic <br /> Test Equipment Used: Caldwell System <br /> Sump1UDC ID Sump1 Diesel UDC 1A UDC 1-2 UDC 2A-3A <br /> Sump Manufacturer Unknown Unknown Unknown Unknown <br /> Sump Depth (inches) 55" 38" 38" 38" <br /> Sump Bottom to Top of 17" 9" 910 90* <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 10:49 8:15 8:25 8:45 <br /> Initial Reading •00 .00 .00 .00 <br /> Test End Time 11:19 8:45 8:55 9:15 <br /> Final Reading •00 .00 .00 .00 <br /> Change in Reading •00 .00 .00 .00 <br /> Pass/Fail Criteria .005130 Min .005130 Min .005130 Min .005130 Min <br /> Tightness Test Results ® Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail <br /> Sump/UDC: ID 3-4 4A-5A 5 <br /> Sump Manufacturer Unknown Unknown Unknown <br /> Sump Depth (inches) 38" 36" 36" <br /> Sump Bottom to Top of 8" 8" 8" <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 8:50 9:05 9:25 <br /> Initial Reading .00 .00 .00 <br /> Test End Time 9.20 9:35 9:55 <br /> Final Reading .00 .00 .00 <br /> Change in Reading .00 .00 .00 <br /> Pass/Fail Criteria .005130 Min .006130 Min .005130 Min <br /> i L Tightness Test Results ❑ Pas�DF ail �] P ss ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 3 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.