My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MANTHEY
>
3408
>
2300 - Underground Storage Tank Program
>
PR0517521
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2022 9:43:36 AM
Creation date
1/11/2021 10:05:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0517521
PE
2361
FACILITY_ID
FA0013484
FACILITY_NAME
FOOD 4 LESS FUEL CENTER*
STREET_NUMBER
3408
STREET_NAME
MANTHEY
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
16422011
CURRENT_STATUS
01
SITE_LOCATION
3408 MANTHEY RD
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
187
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Overfill Prevention Equipment Inspection Report <br /> 6. OVERFILL PREVENTION EQUIPMENT DETAILS <br /> Tank ID (one OPE per column) 1 Regular 2 Premium <br /> Are both vent and tank riser piping ❑Yes ❑Yes ❑Yes ❑Yes <br /> secondarily contained? ❑✓ No ❑✓ No ❑ No ❑ No <br /> OPE Model OPW Ball Float OPW Ball Float <br /> What is the OPE response when activated? E]Shut off ❑Shut off ❑Shut off ❑Shut off <br /> (Check all that apply.) Flow Flow Flow Flow <br /> [Z]Restricts ❑v/ Restricts ❑Restricts ❑Restricts <br /> Flow Flow Flow Flow <br /> ❑Audible ❑Audible [:]Audible ❑Audible <br /> Alarm Alarm Alarm Alarm <br /> ❑Visual ❑Visual ❑Visual ❑Visual <br /> Alarm Alarm Alarm Alarm <br /> Are flow restrictors installed on vent piping ❑Yes* ❑Yes* ❑Yes* ❑Yes* <br /> that may interfere with the OPE operation? ❑✓ No ❑✓ No ❑No ❑ No <br /> At what level in the tank is the OPE set to <br /> activate? (Inches from bottom of tank) 118.25 117.50 <br /> What is the percent capacity of the tank at <br /> 94% 94% <br /> which the OPE activates? <br /> Is the OPE in proper operating condition to E]Yes El Yes El Yes El Yes <br /> respond when the stored substance ❑✓ No ❑✓ No ❑ No ❑ No <br /> reaches the designated regulatory level? <br /> 7. SUMMARY OF TESTING RESULTS <br /> OPE Inspection Results ❑ Pass ❑Pass ❑ Pass ❑ Pass <br /> ✓❑ Fail ❑✓ Fail ❑ Fail ❑ Fail <br /> 8. COMMENTS <br /> Describe all results marked "Fail"and each proposed remedy. <br /> Per Inspectors Request - Tested The Probes Overfill and It Goes Off at 90%. <br /> Ball Floats No Longer an Acceptable Method with Single AV. Need to Install Drop Tubes with <br /> Overfill Device. <br /> * Mark here if: <br /> ❑Flow restrictors interfere with overfill prevention and equipment repairs required. <br /> Additional copies of this page may be attached. <br /> Attach tank chart(s), measurements, calculations, and In-Tank Setup report(s) <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.