My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL PINAL
>
1325
>
2200 - Hazardous Waste Program
>
PR0543517
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2022 2:02:04 PM
Creation date
1/11/2021 2:49:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0543517
PE
2247
FACILITY_ID
FA0024706
FACILITY_NAME
METAL FINISHING SOLUTIONS - STOCKTON CA
STREET_NUMBER
1325
STREET_NAME
EL PINAL
STREET_TYPE
DR
City
STOCKTON
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
1325 EL PINAL DR STE 1
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Baker, Lydia [EHD] <br /> From: Scott Renfrew <srenfrew@iesengineering.net> <br /> Sent: Friday, March 19, 2021 3:51 PM <br /> To: Baker, Lydia [EHD] <br /> Cc: Tony Grizelj; Scott Renfrew; Corey Dehl; Rob Ashe <br /> Subject: RE: Metal Finishing Solution (MFS) - Stockton - Source Reduction Plan <br /> Attachments: MFS STK SB14-2019-SPR-Form_20210315.pdf, MFS STK SB14-2019-SPR-Form_ <br /> 20210315.xlsx <br /> CAUTION:This email is originated from outside of the organization. Do not click links or open attachments unless you recognize the <br /> sender and know the content is safe. <br /> Lydia, <br /> Please see 2018 Metal Finishing Solution (MFS) -Stockton -Source Reduction Plan -attached. <br /> Per our previous discussions, MFS started it's Stockton facility in mid-2018. <br /> The facility was generating rinse water waste and treating it through their PBR Waste Treatment System. <br /> The facility did not generate (ship) any hazardous waste until some one-time cleanup items in early 2019. <br /> Note that the facility is very much connected with it's market clientele. <br /> MFS largest client to date is Tesla, located in their Fremont, CA facility. <br /> So the more automobiles that they produce,the more automobile parts that MFS processes. <br /> Although the facility will strive to reduce waste generated through it's process, but it also must also maintain a healthy, <br /> efficient and robust plating process. <br /> Also, sorry I'm later than expected to submit this report. <br /> The next Source Reduction Plan updating report will be for the reporting year 2022—due in March 2023—correct? <br /> As required, MFS Stockton will have a copy of this report on-site from inspector review. <br /> Please do not hesitate to contact me with any questions or comments. <br /> Thank you, <br /> Scott Renfrew, Senior Project Manager <br /> i�t[�t;r�ttcd <br /> Fo)ginecriyig <br /> Services <br /> 70 Saratoga Ave., Santa Clara, CA <br /> o: (408) 261-3500 <br /> d: (669) 699-0234 <br /> m: (831) 566-5533 <br /> srenfrew@ iesengineering.net <br /> Please note;IES has new direct dial TEAMS phone numbers. My new direct number is (669)699-0234. While our main office <br /> number shall remain the same, we will no longer be using extensions.Please update your records accordingly. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.