My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL PINAL
>
1325
>
2231-2238 – Tiered Permitting Program
>
PR0543720
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2022 11:40:34 AM
Creation date
1/12/2021 8:57:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2231-2238 – Tiered Permitting Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0543720
PE
2231
FACILITY_ID
FA0024706
FACILITY_NAME
METAL FINISHING SOLUTIONS - STOCKTON CA
STREET_NUMBER
1325
STREET_NAME
EL PINAL
STREET_TYPE
DR
City
STOCKTON
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
1325 EL PINAL DR STE 1
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQUIN <br />C: C3 U IN I Y <br />Environmental Health Department <br />Permit By Rule Treatment Facility Inspection Report <br />Facility Name: <br />1 <br />Facility Address: <br />Date: <br />METAL FINISHING SOLUTIONS - STOCKTON <br />1325 EL PINAL DR, STOCKTON <br />July 20, 2021 <br />An inspection checklist was provided to the facility operator at the time of inspection. The inspector will provide <br />a complete report to the facility operator within the next few weeks. <br />Complete and submit a copy of the Return to Compliance Certification form to the EHD with a statement <br />documenting the corrective actions that have been or will be taken for each violation, and any supporting <br />paperwork, within 30 days of receiving the complete inspection report. <br />AFTER THE COMPLIANCE DATE, EHD WILL BILL FOR ALL TIME AND ACTIVITIES ASSOCIATED WITH BRINGING <br />THIS FACILITY BACK INTO COMPLIANCE. <br />THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br />Received by: Date: July 20, 2021 <br />Inspector: <br />Inspector Phone: <br />Printed Name and Title: <br />ELIANNA FLORIDO, REHS <br />(209) 616-3050 <br />Emailed to Chad Yelm, Production Manager <br />FA0024706 PR0543720 SCO01 07/20/2021 <br />EHD 22-04 Rev. 9/16/2020 Page 3 of 3 Permit By Rule Treatment Facility OIR <br />1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjgov.org/EHD <br />
The URL can be used to link to this page
Your browser does not support the video tag.