Laserfiche WebLink
Core drill mechanical room wall (2 places)to accommodate one new 4"return pipe and ............... <br /> one new 6" gutter coIle ction pipe. Fill gap with non-shrink,water-proof grout and trowel <br /> smooth on mechanical room side. <br /> y 5 <br /> 5 <br /> S' <br /> . _Jr �- <br /> ,� �. <br /> 1 <br /> V f N Irk in r <br /> . 1 �3 r <br /> M. <br /> 1J'g"i��4_ ��:. �`df`ar1�.�.9 4,!:C a U� �S' �.,.�_...,,,� 1 ...�...... ..m,..,... ��`"f� E�e��,P a�d7�•F''� 3 <br /> - g ( c1'-) 4J <br /> POOL DATA: _- � f <br /> NOTES: The existing pool is 113,600 gallons with a 315 GPM flow rate <br /> 1 ai� '• <br /> to reach a 6 hour turnover. . <br /> 1f The rim-flow gutter system will add 6" of water= 12,625 gallons. i t �' D I " <br /> w, l# I-A 11�1 -Poo <br /> wood Wall Sections for tank instal <br /> R <br /> The new pool volume is 126,000 gallons with a 350 gpm flow <br /> - emove Ply I 12 <br /> �;,, rate to reach the 6 hour turnover: f lati <br /> J � The existing 7.5 HP pump is throttled baick approximately 50% <br /> 1 to reduce the flow. Allowing foir full flow will accommodate i l <br /> ,r <br /> 7 l E€, <br /> i I <br /> -� the.additional flow required. (see Pump,curve} �' Do not cover work until pressure test has been inspected and verified. <br /> Notify District Consultant 48 hours prior to scheduling test. <br /> There are three Pac-Fab TRI 40-C filters;,each with 7.06 SQFT of filter I �* <br /> r <br /> area with total of 21.18 SQFT aind a 15,5 GPM/SQFT filter rate. <br /> F <br /> One additional filter will be added bringing the total filter area to <br /> ffy`7j� 28.24 sgft. At 350 GPM the neuv filter rate will be: 1.2.4 GPM/SQFT <br /> The filter manifold will be increased to 4 (see plan). y <br /> 9-ki <br /> r The existing 4" PVC plumbing remains Just within code for 350 GPM @ 8.8 � � <br /> as _" FT/SEC -�— ., N E V Avvpp•� t'T x i 9""� � <br /> z 11.1 t &.. 1 <br /> C7l�h l The Stenner chlorinator has a 50 GPD capacity,well in excess of the code <br /> minimum, (3 GPD/10,000 - 12.6 x 3 =37 GPD) <br /> E <br /> P <br /> ` t <br /> i <br /> _ 4 <br /> i <br /> 3 <br /> , <br /> JF 1/' � y�;.�'��>"n ...,.. �� I°:r' �� f � �b��:�.� E �"4`..9I.F;.. ;f,. D4E i � •A <br /> 1 1 i TWAJ J'�-5 r <br /> ' <br /> t �,�-�� � E��� `_E' �E.A,/�^.� �.1 � � .."""" -.W...w-.f a�...._,._....._....__w_......A•:,.....,-.:._..,::.....�......�,._ o.,..e...d..., _..-___'_ .._,_Bf'_:.��`_-_.._....,,,,.:.„j. <br /> 'z Note: The "balance tanks" will collect water <br /> from the gutters only. The bottom drain <br /> line will remain connected to the pump. <br /> fey <br /> 0 � L)a <br /> q <br /> 1.. C.0 1../�`�1�Ni� <br /> I f <br /> SF S r t t u"�'i J>— �. '-� }� <br /> p r., <br /> C 1 T/ 6 <br /> p; <br /> Save tile lines on pool floor and pool end targets. ': `°" ... <br /> Replace any broken or ,-'!i.pped tiles. <br /> 1 <br /> Remove concrete deck as required. � t r <br /> -a Expose the 6 wall returns and install new eyeball I, -1p1 °..tv= �c asp i. .E s <br /> F Follow expansion joint or seams if at all possible. <br /> inlets, angle downward 20 degrees. <br /> T­r <br /> w,-... <br /> w..,.,...,,,.....,... m .,,,�,..,.«...,.«....,:,...,.,..�,�..,..,..-,�»«»...,.,,��Y.-.�."..W,.,.,.o.-......,,.-...,...,.,,..»..,.-:. .�R.,�....w..,,.,.....,3�-,- ,e...�....,.......M.�..,.w..Y,.w..-.., �.�rP»»��.-..:-s��Yr . ...._.„....._..__..._--.._.__.,,,..� .:. w-..,,...,.__.. _ -~ � �� <br /> - <br /> E <br /> J pgC <br /> -_ 8 <br /> b�C�' ��S” &Yt�' W 1•,� � � - =��' � „`:V�,: 9l - "' � -' `- ' .'i � <br /> 0/ � 9'!. 1 zl CM , 4, � (,- �7.�'�.:.. <br /> , k i P r,I r <br /> sL�� <br /> f <br /> Sp <br /> 7 7R O u § <br /> D 00 <c>A'I�.uo k� <br /> 9 <br /> 10 <br /> /lid'P-6)k a L:. <br /> Steel Angle x 8" 4 per tank <br /> ���" lnstaIl with 518" concrete anchors <br /> c ��:�tis ` � ° Gutter collection transitions 6"(2 each) Gutter return transition(I each)4" <br /> L,. <br /> t Gutter Collection Tank Section (No Scale) <br /> yt ii,i,„I_ 1� PUMP PERFORMANCE CURVE CMTS SERIES <br /> (1)1CMK-50 : 5 HP � l <br /> Pool Plumbing Pressure Test-i 1° (2)ECMK- 00:7.5 HP <br /> 12C (3}ECMK 100: 10 ryK <br /> (4)ICMK-150: 15 HP <br /> New Stainless Steel Gutter Section o Scale +-100 <br /> (N ) Pressure test all new plumbing prior to covering. 3 <br /> Notify District's consultant 48 hours prior to test. <br /> Existing plumbing to be water tested to 20 PSI. 40--- <br /> New <br /> 0 4 <br /> New plumbing shall be water tested to 30 PSI 20 <br /> w Aquatic Commercial Consulting <br /> 0 "100 ISO 200 2%300 0 00 150 500 55(A 600 960 700 750 800 P.O.Box 892,Saratoga,CA 95071 800-660--5202 -FAX 408-867-1216- I`ich O c ruac rx,�4 <br /> 1. Pressure test return line after capping returns an U.S.Gallons P®r tin. -- <br /> end and plugging side returns. <br /> SCALE; 1/4„=1,-�” APPROVED BY: DRAWN BY R.Young, <br /> 2. Pressure test new return line before connecting a-.9-26-�5 <br /> to gutter. (gutter is pressure tested separately) DATE: �-, -- REVISED <br /> 3. Pressure test gutter collection lines prior to connection <br /> �µ^ F Existing 75 Pump carve Tracy High Pool Improvements <br /> 17 <br /> To gutter. Use new butterfly valve in mechanical <br /> room for seal. <br /> DRAWING NUMBER <br /> New Gutter & Plumbing SP-� <br />