Laserfiche WebLink
i <br /> p was 1 T d.E <br /> 6o 7Z_ <br /> i <br /> ,, ...,.,... ,...,.,.. ,,..:.�......,..,. �._.:..,�...:...� 4. ",-,.•�, .,. .,,.wr..m,.,..-.«.+-ww.,.w....w.w,..._..w,..a*w...»r� ..,.,...,.,�+�,,,. .� a. vm.,rl . w.,:..:..,.+.v-.._.»..: <br /> r�........,._..,�.,....,,,.w,..-_.A�,�....- ..». ,.- "=.L.:.,:.�"=.__.......»:`,: .'�_...�.....,...-.--.-'--..,.......�,�..�w.......,.«w.............:..,..w..,,.«.�,,.a..,.�.,�.,w..w.....,�.Y.�-�.+.,..�.,.r.e.._..� ,�L....-,�..vv �.,,,�.,,,�..wM.,.r.P,..<.o.. <br /> 15; <br /> Replace the existing bottom drain plumbing <br /> - '4 with new PVC plumbing as drawn. Plaster the <br /> interior of each bottom drain sump. ;. <br /> 11y t i' x+ � �3 ` L) �^�, C. I - 4 1 t� " , o <br /> Contractor to Save Existing Water-line Tile ° <br /> Contractor to make repairs to any broken or missing tiles (- py o C_O#P T p0b'5 <br /> Gutters are not included in re-plaster � � �'" 1 _ _ <br /> Ort 1. � �T ff vet <br /> Rif+ 0a l r I �, ;��, �dS. S. (en Y ` C <br /> ' <br /> 'e", <br /> 1' <br /> D RIP <br /> Bottom Drain Sump Plumbing Detail (No Scale) Pool Bottom Steel Detail (No Scale) <br /> IMPORTANT NOTE: Ground water level is suspected to be approximately six (6) feet <br /> 3 . <br /> below grade. The District will drain the pool to that elevation. The Contractor is <br /> i to confirm the existence of hydrostatic relieve valves and install pumps to <br /> - ,z <br /> x <br /> 4 1: excavate water from the 2" connections in each ain. <br /> k Pool Steel Notes: <br /> x �k 1. Install #3 dowels, 8" O.C. , <br /> 2. Epoxy all dowels on both ends in place. <br /> .: 3. Insert steel 3" into existing concrete/gunite. <br /> 4. Epoxy Coat steel 2" on either side. <br /> �� 5. Double tie"opposing" dowels. <br /> L-4` ,; Pool Concrete Notes: <br /> ' 1 Plaster Shall be White <br /> 1. Use 5-sack concrete mix with 1/2"x 3/4" aggregate. <br /> r 2. Cover all plumbing with pea gravel, 1"minimum. <br /> k <br /> 3. Place concrete against sanded existing soil or gravel <br /> l 4. Leave concrete surface with a rough, wood trowel <br /> i 1 finish to accept new plaster. <br /> Location identified by leak detection (Point"A") <br /> Remove concrete, excavate to locate bottom drain line. Follow expansion joint <br /> and creases if at all possible. <br /> Pressure jLest Procedure: <br /> f <br /> Pool Plan 1/4" = V- 0" <br /> . <br /> � � 1. Cap 4" line @point`A <br /> ._� .��._�...W.,M...��..�._W..�.w_�,._:�..__.-.�u.-.�...,,,,�w._. ....��..,,� _..,,,�,..._.,�W�._..�...............»�,..,.,...... .w..»....,.�._.ry.,..._ 2. Imstall blind flange @ point <br /> " 3. Install hose bib and pressure gauge <br /> 4, Pressurize with water to 30 PSI for 24 hours <br /> Pressure; Test Scenario Notes: <br /> r , <br /> 1. I plumbing r 1 g f <br /> betweee points A and B ooldnew bottom <br /> -M connection <br /> drain <br /> plumbing. ion at point A t the <br /> F. . ........... .. �, :� _ :.:�.,w� M� ,. �,.��,�..-- .: 2. ff plumbing between points A and B does not hold pressure: <br /> w. u p Provide_ w� �.� µ� �. d b <br /> ,� g p Pro 'de and install new chemical controllers as specified <br /> 3 � -Cut concrete, excavate an replace all plumbing <br /> from the bottom drains to point B. NOTE: Electrical and sample stream plumbing already exists. <br /> y <br /> V 0 Ga 3. After plumbing is completed,pressurize all plumbing with <br /> 30 PSI water for 24 hours before covering work. <br /> A W,.L 1� <br /> C�z,� • 1 C�=fin 1l "' ., <br /> r @ <br /> Pomp <br /> p <br /> Replace existing PVC chemical feed with <br /> double contained, color coded poly-ethylene <br /> tubing. <br /> t�M VZT10 N QS� 1 gggyyy <br /> Mu <br /> Pool Section 1/4" - 1'- 0" <br /> Existing Below-Grade Mechanical Room : <br /> Contractor to verify all dimensions <br /> Deck Replacement Notes: <br /> I. Use 5-sack concrete mix with 1/2" x 3/h" aggregate. <br /> 2. Install 44 dowels, 18" O.C. <br /> 3. Insert steel 3 into existing concrete/gunite. <br /> 4. Epoxy Coat steel 2" on either side. --Aquatic Commercial Consulting <br /> 5. Double tie"opposing" dowels. P.O. Box 892,Saratoga,,CA 95071 800-660-5202 -FAX 408-867-1216- rich ri@aquacom.us <br /> 6. Use 5-sack concrete mix with 1/2"x 3/4"aggregate. SCALE. �4"- 1'_0 APPROVED BY: DRAWN BY R.Young <br /> 7. Place concrete against sanded existing soil or gravel <br /> DATE; 6-17-05 RevtseD <br /> 8. Match color and finish of existing deck. TRACY HIGH SCHOOL <br /> 9. Replace all expansion joints and mastic. <br /> 315 E. 1 1th street Tracey High School <br /> Tracy, CA 94376 <br /> _ Pool Improvements/Repairs DRAWING SP 1 ER <br />