Laserfiche WebLink
At <br /> OPW 71SO Overfill Materials { important <br /> Prevention Valves ' In order to prevent product <br /> Valve Body: Cast aluminum spillage from the Underground <br /> The CARB certified OPW 7150 Storage Tank (UST), properly <br /> Float: Nitrile rubber, closed cell foam maintained delivery equipment <br /> vapor-tight Overfill Prevention ValveValve : Aluminum i and a proper connection at the <br /> is designed to prevent the overfill of ) tight-fill adaptor are essential. <br /> underground storage tanks by providing Seals: Viton� Delivery personnel should <br /> be managed and trained <br /> apositive shut-off of product delivery. upper & lower Drop Tube: Aluminum >s � to inspect delivery elbows <br /> The shut-off valve is an integral part of plastic parts: Acetal and hoses for damaged and <br /> the drop tube used for gravity filling . missing pake ehey should <br /> = alwa s make certain there <br /> :Hardware: Stainless steel �'At}g y <br /> The OPW 71 SO allows easy installation {fj t Is a positive connection <br /> f1f1L�i between the adaptor and <br /> (without breaking concrete) and requires Features _ <br /> no special manholes, elbow. if delivery equipment <br /> sio Simple, Easy and Quick is not properly maintained, <br /> The OPW 71 SO is a vapor-tight two- Installation — no excavation or or the elbow is not securely <br /> stage shut-off valve. When the liquid special manholes required. coupled to the adaptor, a <br /> g pserious spill may result when <br /> level rises to about 95% of tank a Economical — costs a fraction the DPW 71 SO closes, causing <br /> ca aci the valve mechanism is � ; ru a hazard and environmental <br /> P tY� of expensive, complicated and contamination, <br /> released, closing automatically with difficult-to-install valves. <br /> the flow. This reduces the flow rate to NOTE: The OPW 7150 is <br /> approximately 5 gpm through a bypass Furnished Complete — supplied <br /> with new upper and lower drop tubes, designed for use on tight fill <br /> valve. The operator may then stop the PP P gravity drop applications only, <br /> mounting hardware and thorough l Do not use for pressure <br /> filling process and disconnect and drain <br /> the delivery hose. As long as the liquid instructions for quick job site time. fill applications, <br /> exceeds the 95 % level, the valve will � Completely Automatic Operation <br /> close automatically each time delivery — no prechecks to perform, no resets Retrofits Directly — for both new <br /> is attempted . and no overrides to be broken and existing tanks with 4 " fill risers. <br /> If the delivery is not stopped and the or abused . Quick Drain Feature — <br /> liquid rises to about 98% of tank ss No Pressurization of the Tank — automatically drains hose when head <br /> capacity, the bypass valve closes operates directly from liquid level. pressure is relieved. <br /> completely. No additional liquid can flow ®. Will Accept a Dipstick ®• Best Flow Rate in The Industry * <br /> into the tank until the level drops below for Gauging <br /> • orw lest dab results <br /> a reset point. <br /> NOTE: The 71 SO Overfill Prevention <br /> Valve can be adjusted to shutoff at any ;Advantages of Overfill Prevention - <br /> desired tank capacity. Please contact the Compared to Overfill Warning Systems: <br /> Authority Having Jurisdiction (AHI) and * Completely Automatic faster fill times and reducing <br /> review local, state, and national codes to . Operation — does not rely on the spill risk. <br /> determine the regulatory requirements alertness or speed of response of the ♦ Speeds Delivery Operations . <br /> governing shut-off capacity in your delivery attendant for certainty of — product flows unimpeded into . <br /> region, as well as take into account overfill prevention , the tank until the hose " kick " that <br /> other considerations such as extreme Keeps the Top of UST "Dry," accompanies the valve shut-off <br /> tank tilt, in all cases, the upper tube per EPA Requirements — provides a clear signal that the <br /> must protrude into the tank at least <br /> 6112 to ensure that the valve can shut <br /> eliminating possible leaks at loose liquid has reached the shut-off level , <br /> off flow into the tank completely before bung fittings and the need for ♦ Simple and Inexpensive <br /> double containment on vent lines, installation — in both two-point <br /> the top of the tank is wetted as per <br /> EPA requirements. Does Not Rely on Pressure in and coaxial fill applications, no <br /> the UST to Stop Flow — allowing additional excavation, manholes or <br /> 71 SO Instruction Sheet Order vent piping are required. <br /> Number: H15524PA <br /> y is fool; for this label for <br /> Listings and �{�!��_ r authenticOPW [VR <br /> � —_ U �fi twse.msee Approved products, <br /> CertificationsesourceraurararaArr OPW 7150 Is EVR Approved for ESS <br /> ReBoard — _ �y3 <br /> lA <br /> fi .-AA ll,l a r v , ( 'd� 11 - <br /> 1 O4 ® Q� r 3jy t' rr rite I ltr 11 <br /> " I tt lbxs r s" x r t <br /> yy.y 1K 3 1 Y �( ! 2 !• r 9 tIIXi is t ':Gt4 k U,e kr �.. . <br /> . s— z rl+`= a r m,xz v,xc aITA <br />