My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4943
>
2300 - Underground Storage Tank Program
>
PR0506488
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:17 PM
Creation date
1/13/2021 7:40:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0506488
PE
2361
FACILITY_ID
FA0007458
FACILITY_NAME
7-ELEVEN INC #32190
STREET_NUMBER
4943
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
CURRENT_STATUS
01
SITE_LOCATION
4943 S HWY 99
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 1. LINE LEAK DETECTOR TESTING <br /> LJ Check this box if line leak detectors ARE NOT installed. (Do not complete this section.) <br /> Simulated release rate verified: (Check all that apply.) Yes Na I <br /> ® 3 GPH LJ 0.1 GPH Ll 0.2 GPH <br /> Has the testing apparatus been properly calibrated? <br /> For emergency generator tank systems, does the LLD create an audible and visual <br /> alarm when a leak is detected? <br /> For mechanical LLDs, does the LLD restrict the flaw through the pipe when a D D <br /> release is detected? <br /> For electronic LLDs, does the turbine automatically shut off when a release is ® Ll El <br /> detected? <br /> For electronic LLDs, does the turbine automatically shut off if any portion of the R) D D <br /> monitoring system is disabled or disconnected? <br /> For electronic LLDs, does the turbine automatically shut off if any portion of the ® lLl <br /> monitoring system malfunctions Dr fails a tightness test? <br /> For electronic LLDs, have all accessible wiring connections been visually inspected RI IEj El <br /> for kinks and breaks? <br /> Were all items on the equipment manufacturer's maintenance checklist completed? RI Ll El <br /> Were all LLDs confirmed operational within regulatory requirements? R1 D D <br /> LLD ID LLD Madel Limes Monitored ,Pass Fail <br /> Q1 848480-001 REG.PROD.LINE ® 0 <br /> Qz 848480-001 MID GRADE PROD.LINE ® 11 <br /> Q3 848480-001 SUP.PROD.LINE ® 0 <br /> Ll Ll <br /> Ll Ij <br /> Il Ij <br /> Ll Ll <br /> L1 Li <br /> Ll Ll <br /> 11 D <br /> El I1 <br /> Il Il <br /> Describe all answers marked "No"or"Fail'and proposed remedy it Section 9. <br /> List all monitoring equipment either replaced or repaired in Section 9 <br /> Page 4 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.