My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4943
>
2300 - Underground Storage Tank Program
>
PR0506488
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:17 PM
Creation date
1/13/2021 7:40:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0506488
PE
2361
FACILITY_ID
FA0007458
FACILITY_NAME
7-ELEVEN INC #32190
STREET_NUMBER
4943
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
CURRENT_STATUS
01
SITE_LOCATION
4943 S HWY 99
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Drill 79 SO Parts Diagram <br /> 3. Hammer - ;` upper Q-Ring Gasket <br /> 4. Tape measure -� <br /> Screws,Qty 3 <br /> 5. Hacksaw or cut-off saw,fine tooth;24 teethAnch <br /> 6. Eine half round file - Inlet Tube <br /> 7. Screwdriver-Phillips blade Poiypak Sea! <br /> 8. Eine grit sandpaper/steel woos <br /> g. Grease,black moly <br /> 10. Torque Wrench <br /> 11, Band clamp(3-314"diameter rninimum) <br /> 12. TI~ AISLE lV1fltC ELS NLY. rivet tool for 118°man- <br /> drel,crimping tool/pliers,wire cutter/scissors, tipper Drop Tube <br /> pipe dope, 114"square drive extension or 318" <br /> square drive extension with 3/8"to 1/4"socket <br /> adapter. <br /> �RNiNN Valve Body <br /> Using electrically operated equipment near gasoline <br /> or gasoline vapors may result in fire or explosion, <br /> causing personal injury and property damage. Float <br /> Check to assure the working area is free from such <br /> hazards,and always use proper precautions. <br /> Louver a-Ring <br /> IMPORTANT.The figures in this installation and <br /> maintenance instruction may contain vapor recovery <br /> equipment(including model numbers)that is not certi- <br /> fied by the California Air Resources Board(CARE)for a <br /> specific Phase I Vapor Recovery System. please refer to <br /> Exhibit 1 of the appropriate CARB Phase I Executive Or- <br /> der for a list of certified Phase I Vapor Recovery Sys tern <br /> Equipment. Lower Tu be <br /> rNote. <br /> Co_1� rren�,-T�sit Ig11 rsicLn5 <br /> l components are€•fie same except the <br /> daptor&cable assembly,rivet,testable <br /> e,and ferrule. <br /> Socket Adaptor&Cable <br /> Assembly <br /> Rivet <br /> Ferrule <br /> Testable Inlet <br /> Tube <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.