My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4943
>
2300 - Underground Storage Tank Program
>
PR0506488
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:17 PM
Creation date
1/13/2021 7:40:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0506488
PE
2361
FACILITY_ID
FA0007458
FACILITY_NAME
7-ELEVEN INC #32190
STREET_NUMBER
4943
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
CURRENT_STATUS
01
SITE_LOCATION
4943 S HWY 99
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
W . O . # NW1 - 2338552 <br /> f Tanknology Inc. <br /> 11000 N. MoPac Expressway, Suite 500 Austin , TX 78759 (800) 964w0010 Policy 100-29-A <br /> JOB CLEARANCE FORM & Rev: F <br /> SITE SAFETY CHECKLIST — OVF Revised: 3/05/2018 <br /> Site Namet#: Street Address: L19w.o. # <br /> — ( 32. 196 Z379Lt <br /> Arrival Time. <br /> [�,17u,eTi,ne: Travel Time: Ot ersonsite: Dale <br /> ) t) lct-ll'7rY <br /> Scope of work and Tasks Performed (JSA's must be available for all tasks): <br /> 14 v CArre / <br /> Repairs to Equipment or Parts Provided: f rr <br /> r �'I � a SGrcr,� r 1 oo YViq 99 f0. r td -�-o A( <br /> Fol oei- p actions required; equipment isolated; comments: rw <br /> Q V K ,w <br /> PPE - PERSONAL PROTECTIVE EQUIP ENT REQUIRED (Check ✓items used or mark ~ if notapplicable) <br /> L Safety Vest Lei Safety Glasses )r� Gloves ❑ Hearing Protection <br /> Steel Toe Boots ❑ Splash Goggles I ❑ Hard Hat ❑ Other <br /> ✓ PRE- TEST PROCEDURES (Check ✓ each item completed or mark if not applicable) <br /> 1 . Discuss safety procedures with site personnel. Nearest hospital : <br /> 2. ft�V Prior to fuel deliveries the UST system must be placed back into working order. <br /> 3. +C Secure entire work area with barricades (cones, flags, and extension bars, caution tape, pennant flags ; or other perimeter guard). <br /> 4. Place fire extinguishers and "No Smoking" signs in the work area . <br /> 5. ❑ Implement Lockoul/Tagout per API 1646 (when accessing product piping during tasks) <br /> Secure nozzles with "Out of Service" bags and nylon ties. ❑ Secure the circuit breaker(s) with lockout devices and tags. <br /> Close ball valves or check valves on product piping . Disconnect electrical 'bayonet" connector from the STP(s). <br /> ❑ All applicable equipment disabled during test(s). ❑ Verify LOTO is complete by trying to operate pumps. <br /> SIGN IN Lead Technician Name Lead Technician Signature <br /> General Safety Checks : <br /> All site personnel have been informed, <br /> Fuel delivery has been informed. Site Representative Name Site Rep e5enlative Signature <br /> Is a fuel delivery due today? 1 _ <br /> LOTO procedures have been discussed and agreed. �� p } (n ✓ \ b Ll S{cttuq A r <br /> Work areas barricaded to protect workers, staff & public. I have discussed job clearance form ith technician. <br /> ✓ POST- TEST PROCEDURES (Check ✓ each item completed or mark if not applicable) <br /> 1 . ❑ Remove all "LockoutlTagout" devices . <br /> 2 . ❑ Run all pumps and verify there are no leaks: ❑ Impact Valve Test Ports under dispensers <br /> [7 Leak Detector Threads on STP's ❑ Functional Elements & Relief Screws <br /> 3 . ❑ Install lead wire seal on all test plugs & leak detectors that were serviced . <br /> Count LD threads : L1 _ L2 _ L3 _ L4 _ L5 — L6 _ <br /> 4 . LlCheck following components operational : ❑ ATG probes, sensors , & caps <br /> ❑ Ball floats , dry breaks & caps ❑ Cathodic protection operational <br /> ❑ Containment sumps are dry ❑ Dispensers & POS operational <br /> ❑ Dispenser panels are replaced is Drop tubes, fill adapters & caps <br /> ❑ Leak detectors & vent tubes ❑ Manhole covers and sump lids <br /> Ly Monitoring system is operational ❑ Shear valves are open <br /> D Siphon lines and manifold valves ❑ Spill containers & drain valves <br /> STP fittings and bayonet connectors ❑ Vents (not capped , plugged or isolated) <br /> 5. Remove barricades . <br /> SIGN OUT & Operator Verification of Work (OVF) Lead Technician Name Lead Technician Signature <br /> General Safety Checks: l <br /> Work area has been left tidy & safe. /� c/ <br /> Site staff are aware of work status including any remaining isolation. Site R press la ive Name ite Repr entalive Signature <br /> Changes to equipment are documented and communicated. l� y <br /> All incidents, near incidents, and unsafe situations reported. S pLl r~ C'1AS �Cl <br /> Site Representative Comments: t <br /> COMPANY CONFIDENTIAL © Tanlcnology Inc., 2018. All Rights Reserved. <br /> rinted copies of this document are uncontrolled. The current version is available in the Tanknolo On-Line Document Control System. <br />
The URL can be used to link to this page
Your browser does not support the video tag.