My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4943
>
2300 - Underground Storage Tank Program
>
PR0506488
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:17 PM
Creation date
1/13/2021 7:40:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0506488
PE
2361
FACILITY_ID
FA0007458
FACILITY_NAME
7-ELEVEN INC #32190
STREET_NUMBER
4943
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
CURRENT_STATUS
01
SITE_LOCATION
4943 S HWY 99
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tape measure — --�-_ � IMPORTANT: Remove a II chips and shavings gener- <br /> t ated In steps 3 thru 5 out of the cut end ofthe tube. DEQ <br /> - " NOT remove chips and shavings by dumping thru valve <br /> body. <br /> ~3 r ' MarkUpperTube <br /> (Cut Line) <br /> STEP 4: F1 LIE THE UPPER DROP TUBE <br /> File the upper tube square, and remove any burrs or <br /> Figure 2 Seam rough edges. Make sure the cut is flat and square. <br /> IMPORTANT: Ca refully fi le a good chamfer on the <br /> STEP 8: CUT THE UPPER DROP TUBE inside edge of the drop tube to provide a lead-in for the <br /> polypak seal and inlet tube installed in Step 8. <br /> Attach the supplied band clamp to the upper tube just <br /> below the mark and ensure that it Is assembled square <br /> to the tube. The clamp can be used as a guide for mak- <br /> Ing a square cut. if a vise is used, clamp on the valve <br /> body casting only to avoid damage to the float and <br /> tubes (See Figure 3A). Carefully saw through the tube <br /> squarely, at the mark made In Step 2. Use a hacksaw <br /> with a new fine-tooth blade. Rotating the upper tube <br /> as the sawing progresses will minimize run out and en- <br /> sure a square 90-degree cut. Remove the band clamp <br /> after tube is cut. <br /> CAUTION _ DO NOT use a pipe or tubing cutter to cut <br /> Fine half round fi!F <br /> the upper drop tube, this may damage the tube, <br /> causing it to be out of round thereby prohibiting <br /> assembly of the unit. <br /> Figure 4 <br /> STEP S: SAND THE UPPER DROP TUBE <br /> \, Sand the inside of the drop tube with sandpaper and/or <br /> steel wool to remove all burrs and sharp edges. After <br /> sanding wipe down the inside of the tube with a clean <br /> J, rag from the top to approximately 4 Inches down to <br /> t / remove any debris. <br /> tion: Failure to property chamfer, sand, and <br /> ,- / '� _ clean the drop tube may cut the seal and result in a <br /> failure of a pressure decay leak test. <br /> Figure 3A <br /> lie <br /> ,� <br /> r 1 <br /> Band Clamp : <br /> �� i <br /> � doll edo.Je todo <br /> - <br /> "� Fine arra Sandpaper <br /> loll <br /> 04 <br /> Cut tine Figure S <br /> Figure 38 <br />
The URL can be used to link to this page
Your browser does not support the video tag.