My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
6009
>
2300 - Underground Storage Tank Program
>
PR0542116
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2021 11:58:49 AM
Creation date
1/13/2021 8:19:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0542116
PE
2351
FACILITY_ID
FA0024188
FACILITY_NAME
GRIN INVESTMENTS INC DBA: ARCO AM/PM
STREET_NUMBER
6009
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95207
APN
08126064
CURRENT_STATUS
01
SITE_LOCATION
6009 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S A N J Q Q Q U IN Environmental Health Department <br /> C O U N T Y Time In: <br /> Time Out: <br /> Greorness grows here. <br /> Underground Storage Tank Program Service Request Inspection Report <br /> Name of Facility: GRIN INVESTMENTS INC DBA:ARCO AM/PM Date: 07/26/2021 <br /> Address: 6009 N EL DORADO ST, STOCKTON 95207 <br /> Requestor: JOHN BAYLIS, IEC SERVICES Telephone: (916)993-6312 <br /> Program Element: 2309-UST RETROFIT-Minor Plan Check Request#: SR0083952 <br /> Inspection Type: 298-UST RETROFIT REPAIR INSPECTION <br /> Onsite Service Technician: Chris Bishop ICC Service Tech/Installer Exp. Date: 09/03/2022 <br /> Manufacturer training: VR, 04/17/23 <br /> OVERALL INSPECTION NOTES AND COMMENTS <br /> NOTES <br /> On site to verify sensor functionality, 24-hour hydrostatic test(or equivalent)on the under dispenser containment(UDC),visual <br /> inspection of the piping within the dispensers for any leaks and verification of the dispenser footprints contained by the UDCs. <br /> Cold start of the monitoring panel was not performed. Witnessed functionality of 208 sensor in UDC 7/8. Witnessed brine <br /> communication in the 7/8 UDC. No leaks or damage observed in the 7/8 UDC. Fuel filters drain directly into the 7/8 UDC. <br /> Provide test results to SJC EHD within 30 days. <br /> The person in charge is responsible for ensuring that the above mentioned facility is in compliance with all applicable sections of the California Health and <br /> Safety Code.If a reinspection is required,fees will be assessed at the current hourly rate. <br /> Received by: Name and Title: Emailed to John Baylis, Manager <br /> EH Specialist: LYDIA BAKER Phone: (209)616-3046 <br /> FA0024188 SR0083952 SC298 07/26/2021 <br /> EHD 23-01 Rev.09/16/2020 Page 1 of 1 Underground Storage Tank Program Service Request Inspection Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.